The invention relates to a production process of high-strength bent pipe steel, which is a production process of high-strength X80 steel plate used for bent pipes. Composition: C: 0.015-0.080%, Mn: 1.50-1.80%, Si: ≤0.30% , S: ≤0.0030%, P: ≤0.015%, Nb: 0.04~0.15%, Ti: 0.005~0.030%, V: ≤0.120%, Alt: ≤0.060%, N: ≤0.010%, Mo: 0.10~0.60 %, Cu: 0.10~0.50%, Ni: 0.10~0.50%, Cr: 0.10~0.30%, Ca: ≤0.01%, the rest is iron; in the slab reheating process, the slab heating temperature: 1100~1200℃; In the controlled rolling process, the termination temperature of controlled rolling in the recrystallization zone: 1000-1080°C, the start temperature of controlled rolling in the non-recrystallization zone: 900-980°C, the termination rolling temperature: 760-880°C; In the cooling process, the termination cooling temperature: 300-550°C, and the cooling rate: 3-40°C/s. The product of the invention has good comprehensive properties, especially excellent performance in low-temperature impact toughness, and can still maintain a Charpy impact energy of about 300J at about -30°C.