83results about How to "Realize parallel operation" patented technology

Dam-type filling hydraulic bracket in mined-out region

The invention relates to a dam-type filling hydraulic bracket in a mined-out region. The dam-type filling hydraulic bracket comprise a top beam, a tail beam, a bracket pedestal, a hydraulic support upright post and a four-connecting rod mechanism, wherein the rear end of the bracket pedestal is provided with a baffle plate pedestal; the baffle plate pedestal is provided with a traction jack of which the front end is hinged with the bracket pedestal together; the rear end of the baffle plate pedestal is hinged with a baffle plate in which a telescopic insertion plate is arranged; the back of the front end of the telescopic insertion plate is fixed with an insertion plate jack of which a pedestal is hinged on the baffle plate pedestal; the back of the baffle plate is hinged with a baffle plate jack of which a pedestal is hinged on the baffle plate pedestal; the baffle plate jack can erect the baffle plate; flexible waterproof cloth extending into a soleplate and two lanes of a working face is attached to the inner sides of the baffle plate and the telescopic insertion plate and is paved from top to bottom; the baffle plate jack can control the baffle plate to rotate back and forth and can keep the baffle plate still when the bracket is removed to ensure that a filler has enough time to be solidified and molded; and after a filling body is solidified, the baffle plate is pulled again to realize the parallel operation of mining and filling. The dam-type filling hydraulic bracket has the advantages of simple structure, high working efficiency, and capability of realizing the parallel operation of filling and mining.
Owner:CHINA UNIV OF MINING & TECH

Dual-frequency shore power source synchronous grid-connection and smooth power transfer method

ActiveCN105470995ARealize parallel operationFrequency expectation f <sub>exp</sub> The voltage amplitude of the shore power supply is the samePower network operation systems integrationSingle network parallel feeding arrangementsLoad circuitVoltage amplitude
A dual-frequency shore power source synchronous grid-connection and smooth power transfer method is disclosed. The method comprises the steps of performing synchronous grid-connection control and power transfer control through a controller; collecting three-phase voltage UAmp in shore power source side, voltage ULoad of a load circuit and voltage UGen in diesel generator output side; through analyzing and calculating, enabling the shore power source to be inverted into voltage that is accordant with the voltage in the shipboard side by adopting a VF mode; then adopting a droop control mode, performing secondary frequency modulation and voltage regulation control to regulate the voltage amplitude phase angle for realizing rapid synchronous grid-connection so as to realize parallel operation of the shore power source and the diesel generator; and realizing smooth power transfer of the shore power source and the diesel generator through the secondary frequency modulation and voltage regulation control. According to the dual-frequency shore power source synchronous grid-connection and smooth power transfer method, the smooth switch and power transfer of the shore power source and the diesel generator are realized; the load on the ship is powered in an uninterrupted manner in the switching process; and the control policy is high in applicability.
Owner:BEIJING SIFANG JIBAO AUTOMATION +1

Double-turbine double-air-compressor turbocharging system

A double-turbine double-air-compressor turbocharging system belongs to the technical field of combustion engines and comprises an air inlet pipe, an air inlet main pipe, an engine, an air exhaust main pipe, an air exhaust pipe, a first air compressor, a second air compressor, a first turbine, a second turbine, connection shafts, a connection pipe and control valves. The first air compressor, the second air compressor, the first turbine and the second turbine are in coaxial connection through the connection shafts. The control valves are respectively arranged on an air compressor air inlet pipe, an air compressor air outlet pipe, an air compressor connection pipe, a turbine air inlet pipe, a turbine air outlet pipe and a turbine connection pipe. By adjusting opening and closing of different control valves, three working modes of the air compressors, namely a single air compressor, double air compressors in parallel and double air compressors in series can be achieved; and three working modes of the turbines, namely a single turbine, double turbines in parallel and double turbines in series can be achieved. The double-turbine double-air-compressor turbocharging system is reasonable in design, simple in control strategy and suitable for turbocharging systems with various cylinder numbers.
Owner:SHANGHAI JIAO TONG UNIV

Rapid rectangular full-face tunnel boring machine for mining

The invention relates to a rapid rectangular full-face tunnel boring machine for mining. The rapid rectangular full-face tunnel boring machine comprises a rectangular tunnel boring machine head, a support propelling mechanism, a horizontal supporting mechanism, a main guide beam, a scraper conveyer, a saddle turning mechanism, an anchor rod advance supporting unit, an electrical control system, a hydraulic pressure system, a measurement guiding system, a ventilating system, a cooling system, a dedusting system and the like; the rapid rectangular full-face tunnel boring machine for mining is in a structure that a large cutter head is matched with four small combined cutter heads, so as to achieve the purpose of achieving rectangular full-face excavated section; the rapid rectangular full-face tunnel boring machine is in a split structure wholly and can achieve parallel operations of tunneling and anchor rod supporting, therefore, the anchor rod is not a restraining factor influencing the tunneling operation; the rectangular tunnel boring machine head and a support platform are separated into two sections, and a main beam and a saddle are adopted for turning, so that the possibility of small turning radius can be achieved; the support platform vibrates slightly before tunneling operation, therefore, the stability of the whole rapid rectangular full-face tunnel boring machine system is improved favorably; and the specific pressure of a roof and a floor is low and the anchor rod advance temporary support is adopted, so that a situation that the roof and the floor are difficult to tunnel can be solved.
Owner:CHINA COAL TECH & ENG GRP SHANGHAI +1

Blowout prevention and dust prevention device

The invention discloses a blowout prevention and dust prevention device. The device comprises a spraying system, a wind pressure system and an embedded pipe, wherein the outer end part of the embedded pipe is connected with a dust prevention housing; the upper part of the dust prevention housing is provided with a spraying head which is connected with the spraying system, and the lower part of the dust prevention housing is provided with a gas-residue separator which is connected through a conduit; the gas-residue separator comprises a material guide cylinder and a residue discharger; the material guide cylinder is provided with a negative pressure port and a pneumatic reversing valve; the residue discharger comprises a sealed cylinder body; an elbow pipe which is connected with a funnel port of the material guide cylinder is fixed on the inner side of a top cover of the sealed cylinder body; the port of the elbow pipe is provided with a control cylinder; the lower part of the sealed cylinder body is provided with a residue discharge port; and the residue discharge port is provided with a check valve. Through the device, single-roadway multi-drill parallel work can be realized; water, ash and residue in the sealed cylinder body are discharged under the action of pneumatic pressure; harmful gases such as gas and the like are extracted and discharged to a specific position through the negative pressure pipe; the progress of mine floor layer-crossing hole-drilling construction is greatly improved; and the device has the characteristic of controlling dust for hole drilling anddry hole drilling at explosive dangerous places with methane gas, toxic gas and the like.
Owner:ANHUI CHUANGQI MONITORING EQUIP

Parallel operation type quick tunneling support system and construction method

The invention provides a parallel operation type quick tunneling support system which comprises a tunnel boring machine and a plurality of support frames. The parallel operation type quick tunneling support system is characterized in that the tunnel boring machine is provided with a transporter which is composed of a rack, a front adjusting beam and a rear adjusting beam, parallel conveying chains are arranged on the two sides of the rack, a guide groove is formed in the center of the rack, one end of the front adjusting beam and one end of the rear adjusting beam are hinged to different bases located in the guide groove correspondingly, and beam supporting devices are arranged at the other end of front adjusting beam and the other end of the rear adjusting beam. A construction method of the parallel operation type quick tunneling support system includes the step a of dismounting the support frames, the step b of placing the support frames, the step c of conveying the support frames, the step d of taking the support frames, the step e of mounting the support frames, and the step of of conducting anchor bolt support. According to the tunneling support system and the construction method, hydraulic pressure station legs adopt active support and have a better supporting effect compared with a passive support mode, and safe production is ensured; and meanwhile, an anchor bolt operation drill carriage operates at the rear of the tunnel boring machine, so that parallel operation of tunneling and anchor bolt support is achieved, and coal mining efficiency is remarkably improved.
Owner:山东兖煤黑豹矿业装备有限公司

Roadway drivage advanced telescopic cantilever support device and construction method thereof

The invention discloses a roadway drivage advanced telescopic cantilever support device and a construction method thereof. The roadway drivage advanced telescopic cantilever support device comprises an electro hydraulic control system, a pump station, a crossheading support, a telescopic arm and a top-support grid plate; the crossheading support is formed by connecting four section support units in two rows and two columns through a horizontal oil cylinder and a longitudinal oil cylinder, and each support unit is composed of a top beam, a base, a stand column and a four-bar linkage; and the front portions of the bases of the support units in the front row are connected with one end of the telescopic arm, and the other end of the telescopic is connected with the top-support grid plate and an advanced suspended stand column. As the driving of the roadway drivage machine, the telescopic arm extends to support the top. According to the roadway drivage advanced telescopic cantilever support device, a wide range of temporary support for roadway drivage is provided, the support strength is high, anchor bolts and anchor ropes in multi rows can construct parallel, the technological requirement of one-drivage multi-anchoring is met, the staff operate under the full support condition, the safety is high, the roadway driving cost is reduced, and the construction speed is increased over 70%; and the device is suitable for the fields of coal mines, metallurgy mines, underground construction, tunnel construction and the like.
Owner:中煤能源研究院有限责任公司

Construction method of parallel operation of steel pipe arch construction, laying and erecting

The invention discloses a construction method of parallel operation of steel pipe arch construction, laying and erecting. The construction method is achieved by erecting temporary piers at closure parts of girders and erecting independent lattice brackets on the girders. By additionally installing the temporary piers at the middle spans of continuous beams and reducing the clear spans of the girders and the continuous beams, the phenomenon that excessive disturbance exists at the midspan positions in laying and erecting operation when girder transporting vehicles and bridge girder erection machines pass. The steel pipe arch installation is conducted by using the independent lattice brackets, reserved space for the independent lattice brackets is large and can allow the girder transportingvehicles and bridge girder erection machines to pass in laying and erecting operation, and at the same time, the self-weight of the independent lattice brackets are relatively low and has little influence on the stability of girder bodies. The method changes the current situation of a traditional method in which steel pipe arches are firstly installed, concrete is poured into the steel pipe arches, suspenders are installed and stretched, and then laying and erecting operation can be conducted. According to the method, before a girder-arch system is formed, parallel operation of steel pipe arch installation, laying and erecting can be achieved, and the purpose of saving the construction period is achieved.
Owner:SINOHYDRO BUREAU 7 CO LTD

Arch-cross-section roadway tunneling support device

The invention relates to an arch-cross-section roadway tunneling support device, which is integrally of an arch door type structure. A support frame of the arch-cross-section roadway tunneling support device comprises bases (1), wherein an upright post (2) is arranged on each base (1) for supporting the whole support device, the upper part of each upright post (2) is connected with a longitudinal top beam (3), a vertical beam installing seat is arranged on each base, a movable vertical beam sheaths the inside of each vertical beam installing seat, the upper end of each movable vertical beam is hinged to the corresponding top beam, arch support cross beams (4 and 9) are arranged on the top beams (3), a plurality of saddle-shaped parallel beam seats (5) are arranged on the arch support cross beams, a parallel beam (7) is arranged on each saddle-shaped parallel beam seat (5) and supports a roadway top plate, the arch support cross beams of the arch-cross-section roadway tunneling support device are divided into left and right end part cross beams (4) and left and right movable cross beams (9), the left and right end part cross beams are hinged to the cross beam seats of the top beams (3) of the support frame through hinging pin holes (12), the movable cross beams (9) are arranged inside the end part cross beams (4), and position limiting pin shafts are utilized for penetrating through the position limiting pin holes (12) and position limiting openings of the movable cross beams (9) to realize position limiting hinging.
Owner:霍忠明

Single-vortex double-pressure turbocharging system

The invention relates to a single-vortex double-pressure turbocharging system in the technical field of internal combustion engines. The system comprises an air inlet pipe, a main air inlet pipe, an engine, an exhaust pipe, a main exhaust pipe, a turbine, a first air compressor, a second air compressor, a connecting shaft, a connecting pipe and control valves, wherein the first air compressor, the second air compressor and the turbine are coaxially connected through the connecting shaft; a first control valve is arranged on a first air compressor air inlet pipe; a second control valve is arranged on a second air compressor air inlet pipe; a third control valve is arranged on the connecting pipe; a fourth control valve is arranged on a first air compressor air outlet pipe; a high-pressure control valve is arranged on a high-pressure connecting pipe; and a low-pressure control valve is arranged on a low-pressure connecting pipe. Three working modes of a single air compressor, double aircompressors connected in parallel and double air compressors connected in series and exhaust gas recirculation in the three working modes can be realized by adjusting the opening and closing of different control valves. The invention is reasonable in design, simple in control strategy and suitable for the turbocharging system with various cylinder numbers.
Owner:SHANGHAI JIAO TONG UNIV

Single-vortex double-air compressor turbine pressurizing system with air escape valves

InactiveCN102400777APrevent surgeGuarantee the demand for high pressure ratioInternal combustion piston enginesExhaust gas recirculationAir compressor
The invention relates to a single-vortex double-air compressor turbine pressurizing system with air escape valves and belongs to the technical field of internal combustion engines. The single-vortex double-air compressor turbine pressurizing system with the air escape valves comprises air inlet pipes, an engine, air outlet pipes, a turbine, a first air compressor, a second air compressor and control valves, wherein the first control valve is arranged on the air inlet pipe of the first air compressor; the second control valve is arranged on the air inlet pipe of the second air compressor; the third control valve is arranged on a connecting pipe; the fourth control valve is arranged on the air outlet pipe of the first air compressor; the fifth control valve is arranged on the air outlet pipe of the second air compressor; an air compressor rear air escape valve is arranged on an air compressor rear air escape pipe; a turbine front air escape valve is arranged on a turbine front air escape pipe; and a low-pressure control valve is arranged on a low-pressure connecting pipe. Three working modes of a single air compressor, double air compressors connected in parallel and double air compressors connected in series can be realized by adjusting the opening and closing of different control valves, and air inlet air escape, air outlet air escape and air outlet recirculation in the three working modes are realized. The single-vortex double-air compressor turbine pressurizing system with the air escape valves has a reasonable design and a simple control strategy and is applicable to turbine pressurizing systems with various cylinder numbers.
Owner:SHANGHAI JIAO TONG UNIV

Cantilever type longitudinal axis digging and anchoring machine and step-by-step construction stage coal tunnel forming construction process

InactiveCN105370275APrevent roof fallImprove man-hour utilizationCutting machinesX-machineCoal
The present invention belongs to the technical field of coal mine coal tunnel digging construction equipment, and particularly relates to a cantilever type longitudinal axis digging and anchoring machine, which comprises a rack body, a left walking part, a right walking part, a cutting part, a rotation body, a rear support body, a loading mechanism, a first scraping plate conveyor, an electric control system, a hydraulic system, a spraying system and a cooling system, wherein the first scraping plate conveyor comprises a machine tail portion arranged on the rack body and a machine head portion extending out of the rack body rear portion, and the machine head portion is provided with a plurality of airborne anchor rod drillers. According to the present invention, during the use, when the cantilever type longitudinal axis digging and anchoring machine digs, the coal tunnel is subjected to anchoring fixation support by using the airborne anchor rod drillers, such that the parallel operations of digging and anchoring can be achieved, the time consumption problem caused by the frequent switching between the two processes such as digging and anchoring can be solved, the construction efficiency and the construction speed can be improved, and the puking phenomenon can be prevented.
Owner:内蒙古维维能源有限公司

Cantilever tunneling machine with support shoe and construction method thereof

The invention belongs to the technical field of tunnel construction equipment and relates to a cantilever tunneling machine with a support shoe and a construction method thereof. The cantilever tunneling machine with the support shoe comprises a main body structure. The telescopic support shoe is installed at the top of the main body structure. The main body structure comprises a rock breaking cutter bit detachably installed at the cantilever support end. The rock breaking cutter bit is a soft rock cutter bit or a hard rock cutter bit. The design of the special support shoe is added to the cantilever tunneling machine, enough thrust can be provided for the rock breaking cutter bit, rock breaking efficiency is improved, the problem of low rock breaking efficiency of hard rock geological construction is solved, and meanwhile, stability of a complete machine can be improved significantly. In soft rock geological construction, a shield is installed on the support shoe, an arch part of thesupport shoe can be supported, ejector anchor primary supporting can be conducted closely following equipment, the equipment does not need to retreat from a tunnel face due to primary supporting, parallel operation of tunnel face excavation and ejector anchor primary supporting is achieved, and the problem of low construction method efficiency of soft rock geological construction is solved.
Owner:西安中铁工程装备有限公司

Photon information processing chip

The invention discloses a photon information processing chip, and the photon information processing chip comprises: a parallel beam expanding unit which is used for dividing an input photon signal into a plurality of photon signals according to different wavelength intervals, so as to achieve the parallel information processing; the weight setting unit which is used for setting weight values of different levels for the intensity values or the phase values of the photon beams with different wavelength intervals behind the parallel beam expanding unit; the crossover operation unit which is usedfor reallocating propagation channels to the photon beams which are set to be different in weight value after the weight setting unit according to different control voltage values; and the photoelectric receiving array which is used for converting each photon beam with different wavelength intervals into a multi-path voltage signal array through photoelectricity after the propagation channels areredistributed by the crossover operation unit, and the four units are manufactured on the same silicon-based material. Therefore, by utilizing the photon information processing chip provided by the invention, the information processing capacity is greatly improved, the information processing time is greatly reduced, and the information processing energy consumption is greatly reduced.
Owner:OTN INTELLIGENT TECH (SUZHOU) CO LTD

Mining and drilling combined unit for fully mechanized mining face and use method

The invention discloses a mining and drilling combined unit for a fully mechanized mining face and a use method. The mining and drilling combined unit comprises a cutting coal mining part and a rock drilling part, wherein the cutting coal mining part comprises a left cutting rotary drum, a right cutting rotary drum, a left rocker arm, a right rocker arm, a left traction mechanism and a right traction mechanism; the rock drilling part comprises a left rock drilling mechanism and a right rock drilling mechanism; the rock drilling mechanisms are arranged at the tops of traction mechanism shells.The method comprises the following steps: putting a vertical column horizontally before coal mining work; starting the left and right cutting rotary drums, and keeping pushing the left and right cutting rotary drums forwards; in case of rocks, shutting down the cutting coal mining part, putting the vertical column upright, and fixing the vertical column; adjusting the height and horizontal and pitching angles of a rock drill; controlling a hydraulic lifting roof support to enable a pressing head to press a hydraulic bracket; starting the rock drill, and controlling a driving oil cylinder to work to crush rocks; readjusting the height and the horizontal and pitching angles of the rock drill to crush other parts of the rocks; after the rock crushing work is completed, and readjusting the rock drilling part to a state before the coal mining work is carried out to recover cutting coal mining work.
Owner:LIAONING TECHNICAL UNIVERSITY +1

Imaging method of mirror field in tower solar thermoelectric system based on GPU

The invention discloses an imaging method of a tower-type solar thermoelectric system mirror field based on a GPU. The imaging method of the tower-type solar thermoelectric system mirror field based on the GPU comprises the steps that (1) the time, heliostats, mirror field parameters and heat absorber parameters are determined; (2) a mirror field is generated, the position of the sun, the unit vector of main incident rays, the unit vector of main reflection rays of each heliostat, the unit normal vector of each heliostat and the cosine efficiency of each heliostat and the atmospheric transmission efficiency are calculated; (3) imaging calculation of each heliostat is carried out on the GPU in a multi-threading mode through a CUDA calculation platform; (4) the imaging calculation of all the heliostats are summarized, and a mirror field image is obtained. According to the imaging method of the tower-type solar thermoelectric system mirror field based on the GPU, a large amount of calculation and judgment is assisted by the high-speed calculation capacity of the CUDA calculation platform, the whole program mirror field imaging process takes less time on the premise of guaranteeing the accuracy of the result, energy analysis and mirror field dispatching on the heat absorber are facilitated, and certain practical significance is achieved.
Owner:ZHEJIANG UNIV

Excavating, filling and supporting construction equipment and method

The embodiment of the invention discloses excavating, filling and supporting construction equipment and method, and relates to the technical field of underground engineering construction. The equipment comprises a machine base, a rock-soil cutting assembly, an auxiliary supporting assembly and a concrete filling assembly, wherein the rock-soil cutting assembly is positioned in front of the machinebase, and is used for cutting rock-soil; the auxiliary supporting assembly comprises a hydraulic power system as well as a first mechanical arm, a second mechanical arm and a third mechanical arm which are separately connected to the hydraulic power system; the first mechanical arm, the second mechanical arm and the third mechanical arm are separately provided with telescopic shell rings; the first mechanical arm and the second mechanical arm are separately arranged at the two sides of the machine base; the third mechanical arm is arranged on the top of the rock-soil cutting assembly or the top of the machine base; the concrete filling assembly comprises a stirrer and a conveying pump connected to a discharge hole of the stirrer; and the stirrer is arranged on an extending platform at therear end of the machine base. The excavating, filling and supporting construction equipment is suitable for excavating and supporting of underground spaces such as a roadway and a tunnel.
Owner:NORTH CHINA INST OF SCI & TECH

Alternating current and direct current hybrid power distribution network distributed coordination optimization method considering multi-objective optimization

The invention relates to an AC/DC hybrid power distribution network distributed coordination optimization method considering multi-objective optimization. The method comprises the following steps: step 1, constructing an objective function and a constraint condition of an AC/DC hybrid power distribution network coordination optimization model; 2, reasonably partitioning the AC/DC hybrid power grid according to the connection position of the VSC to obtain a corresponding boundary decoupling equation and a constraint condition, and establishing a mathematical model of a sub-region by using an augmented Lagrangian method; 2, solving the interior of a region by adopting the AC/DC hybrid power distribution network coordinated optimization model established in the step 1, performing linearization processing on a non-convex problem by adopting a second-order cone relaxation technology and the like, thereby obtaining a convex optimization mathematical model based on the ADMM, solving and obtaining a new network power flow and the operation power of the FDS and the VSC, and finally obtaining the optimal power flow of the AC/DC hybrid power distribution network. And distributed coordinated optimization operation of the multi-target AC/DC hybrid power distribution network is realized. The operation cost of the power distribution network is reduced, and the flexibility and safety of the power distribution network are improved.
Owner:HEBEI UNIV OF TECH

Full-automatic traditional Chinese medicine decoction piece blending device and application thereof

The invention discloses a full-automatic traditional Chinese medicine decoction piece blending device and application thereof. The device finishes work jointly through a medicine feeding system, a logistics system and a control system. Core components of the full-automatic traditional Chinese medicine decoction piece blending device include medicine storage boxes, chargers, carrier plates, a carrier track, traditional Chinese medicine pots, a computer, charging wheels and weighing baffles. The method of rotary material taking and metering is adopted, and according to instructions of the control system, supply is conducted on the lower traditional Chinese medicine pots, and the advantages of simplicity and reliability are achieved. Through a medicine feeding device, multiple traditional Chinese medicine decoction pieces can be provided for the traditional Chinese medicine pots, and the parallel operation manner is achieved. Accordingly, the traditional Chinese medicine dispensing process can be shortened, operation steps are reduced, and the work efficiency of the device is improved. The device is low in manufacturing cost and high in work efficiency, the traditional Chinese medicine decoction pieces are quantitatively supplied, the needs of traditional Chinese medicine prescription compatibility are met, and hard work of 20-40 traditional Chinese medicine dispensers can be replaced. The full-automatic traditional Chinese medicine decoction piece blending device and the application thereof solve the problems that the traditional Chinese medicine prescriptions are complex, and many varieties exist.
Owner:杭州智徽医药科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products