Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

102results about How to "Shorten transition time" patented technology

Driving mechanism for thread sewing and presser foot lifting thread-scissoring and buttonholing machine

The invention provides a driving mechanism for thread sewing and presser foot lifting thread-scissoring and a buttonholing machine. The driving mechanism for the thread sewing and the presser foot lifting thread-scissoring comprises a driving motor, a first starting plate, a first transmission piece, a second reset spring, a second transmission piece and a first reset spring, wherein the first starting plate is in transmission connection with the driving motor; the first transmission piece drives a thread sewing component to move; the second reset spring is used for resetting the first transmission piece; the first transmission piece is connected with a thread-loosening connecting rod in a thread sewing component; one end of the first transmission piece is connected with the first starting plate; the other end of the first transmission piece is hinged and fixed; the second transmission piece drives a presser foot lifting thread-scissoring component to move; the first reset spring is used for resetting the second transmission piece; the second transmission piece is connected with a main transmission rod in the presser foot lifting thread-scissoring component; an elongated hole extending along the vertical direction is formed in the second transmission piece; a shaft bolt fixedly connected with the first starting plate penetrates in the elongated hole. According to the driving mechanism and the buttonholing machine, the degree of automation is high; the connection time between every two adjacent actions is shortened; the working efficiency is improved; the labor intensity of workers is decreased greatly.
Owner:BULLMER ELECTROMECHANICAL TECH

Crane

The invention relates to a crane which comprises a travelling chassis, a rotary platform, a tower body, a suspension arm, a lateral support and a variable-amplitude support arm, wherein the rotary platform is arranged on the travelling chassis and can rotate for 360 DEG; the tower body is positioned on the rotary platform; the suspension arm, the lateral support and the variable-amplitude are arranged at the upper end of the tower body; at least one of the tower body and the suspension arm consists of box-type expansion joints; the lower end of the tower body is articulated to the rotary platform, and the lateral support, the variable-amplitude and the suspension arm are connected to the upper end of the tower body through hinge shafts; the lateral support consists of three lateral supports which are respectively arranged at the left side, the right side and the rear side of the top of the tower body; the suspension arm is positioned at the front side of the tower body; the variable-amplitude support arm is positioned at the top of the tower body; the longitudinal centre lines of the rear lateral support positioned at the top of the tower body, the variable-amplitude support arm and the suspension arm are coplanar and intersected with the longitudinal centre line of the tower body; and the middle part and the root of the first expansion joint at the lower end of the tower bodyare respectively provided with at least one hydraulic cylinder used for realizing the flat or vertical placement of the tower body in an articulating way, and the other end of the hydraulic cylinder is articulated to the rotary platform.
Owner:ZHENGZHOU NEW DAFANG HEAVY IND & TECH

Preparation method of high-tenacity medium-and-high-carbon superfine bainite steel

The invention provides a preparation method of high-tenacity medium-and-high-carbon superfine bainite steel. The high-tenacity medium-and-high-carbon superfine bainite steel comprises, by mass, 0.48%-0.78% of C, 1.5%-2.5% of Si, 0.6%-1.2% of Mn, 0.8%-1.4% of Cr and the balance Fe and inevitable impurities. The preparation method of the high-tenacity medium-and-high-carbon superfine bainite steel comprises the following steps that vacuum melting is conducted on the above ingredients, so that an alloy steel casting blank is obtained, after the casting blank is forged, heat preservation is directly conducted on the casting blank at the temperature of 850-910 DEG C for 0.2-1.0 hour, and then the casting blank is taken out; the taken-out casting blank is cooled to the temperature of 450-600 DEG C at the cooling rate of 10-20 DEG C/s, then rolling deformation is conducted, and the deformation is 15%-33%; then, two-step isothermal treatment is conducted on the deformed steel material, and finally the high-strength high-tenacity superfine bainite steel is obtained. According to the obtained bainite steel, it is guaranteed that the superhigh strength and the good plasticity are achieved, and meanwhile compared with the impact toughness of the superfine bainite steel prepared through an existing method, the impact toughness of the obtained bainite steel is improved by 2-5 times. The preparation method of the high-tenacity medium-and-high-carbon superfine bainite steel has the advantages of being low in production cost and short in production period.
Owner:HEBEI UNIV OF TECH

Controlled rolling and controlled cooling method for reducing martensite in microstructure of high-alloy steel hot-rolled wire rod

The invention belongs to the technical field of steel rolling, and particularly relates to a controlled rolling and controlled cooling method for reducing martensite in a microstructure of a high-alloy steel hot-rolled wire rod. After being heated, a steel billet is subjected to rough, medium and pre-finish rolling deformation; the water flow of a water tank is adjusted, so that the temperature ofthe steel billet reaching a finish rolling mill is controlled to be 750-800 DEG C, and low-temperature controlled rolling is achieved; the flow of the water tank is adjusted after rolling, so that the spinning temperature is controlled to be 780-820 DEG C; a Stelmor fan is started so that the temperature of a wire rod is quickly reduced, and then the wire rod immediately enters an insulation cover to continue the organizational transformation; the speed of a Stelmor roller way is set to be 3-5 m / min, so that the transformation time of a bainite structure is prolonged, and the effect that onlya very small number of martensite structures are contained in the microstructure of the high-alloy steel hot-rolled wire rod is ensured; and therefore, the strength is reduced, the plasticity is improved, and it is ensured that the high-alloy steel hot-rolled wire rod has good drawing performance. By means of the controlled rolling and controlled cooling method for reducing martensite in the microstructure of the high-alloy steel hot-rolled wire rod, the martensite content in the microstructure of the obtained high-alloy steel hot-rolled wire rod is less that 2%, and the drawing performance is extremely good.
Owner:ZENITH STEEL GROUP CORP +1

One-time forming construction method for inserting steel pipe column into cast-in-situ bored pile in pilot tunnel

The invention discloses a one-time forming construction method for inserting a steel pipe column into a cast-in-situ bored pile in a pilot tunnel. The method comprises the following steps: 1, carrying out guiding hole construction in a pilot tunnel used for pile operation; 2, carrying out drilling machine positioning and drilling; 3, installing a pile foundation reinforcement cage a steel pipe column and an in-column reinforcement cage in the drilled hole; 4, carrying out accurate positioning and levelling on the steel pipe column by utilizing a hydraulic steel pipe column inserting machine; 5, pouring pile foundation concrete and steel pipe column concrete; 6, backfilling rubbles between the steel pipe column and columns; 7, continuing to pour steel pipe column concrete; 8, backfilling coarse sand, moving away the hydraulic steel pipe column insertion machine, pumping out mud and changing a tool pipe into a first section of steel pipe column; and 9, arranging the in-column reinforcement cage of the first section of steel pipe column, pouring steel pipe column concrete, and carrying out concrete curing, thus finishing pile construction. The construction method disclosed by the invention combines two procedures, including drilling pouring pile construction at the lower part and steel pipe column installation at the upper part, and can achieve one-time forming.
Owner:中建八局轨道交通建设有限公司

Construction process for superlarge-section and large-dip-angle tunnel type pile foundation

The invention discloses a construction process for a supperlarge-section and large-dip-angle tunnel type pile foundation. The pile foundation to be constructed is a reinforced concrete pile. A pile hole of the reinforced concrete pile is a superlarge-section large-dip-angle tunnel hole. In construction of the pile foundation to be constructed, the process comprises the steps of firstly, pile hole construction, i.e., 101, advanced pipe shed support construction is conducted at the top of the pile hole, 102, hole mouth protection is conducted and a hole mouth support structure is constructed at a hole mouth of the pile hole, and 103, pile hole excavation construction is conducted, a full section excavation method is adopted for the pile hole excavation with a plurality of construction segments arranged from top to bottom, and a full section support structure is adopted for supporting; and secondly, pile body construction, i.e., the pile body of the reinforced concrete pile is constructed, and the construction process comprises the two steps of reinforcing cage binding and concrete spouting. The construction process for the supperlarge-section and large-dip-angle tunnel type pile foundation is simple in step, reasonable in design, low in investment cost, simple and easy to construct, good in use effect and capable of easily and fast completing the construction process of the tunnel type pile foundation, and the construction process is easy to control.
Owner:CHINA RAILWAY FIRST GRP CO LTD +2

Blade installation seat heat treatment method

The invention relates to a blade installation seat heat treatment method. The method is characterized in that coppering treatment is carried out on the whole surface of a blade installation seat workpiece, machining is used for remove a copper layer of an area surface to be carburized, then carburizing processing is carried out, and a carburizing purpose only in a local area can be reached. While quenching heating, a solid gas carburizer is employed for protection, oxidation and decarbonization on the surface of a carburizing layer are avoided, after quenching, a moveable constant-temperature oil groove is used for substituting an original salt bath heat treatment furnace, interprocess connection time is saved, contact of the workpiece and air at high temperature is reduced, decarburization on the surface of the carburizing layer is avoided; the condition that during a quenching transfer process, the temperature of workpiece surface is reduced to lower than Ms point (180 DEG C) can be avoided; the workpiece after isothermal quenching is placed into a tempering tool case equipped with a protection medium, insulation is carried out, the condition that the temperature of workpiece surface is reduced to lower than Ms point (180 DEG C) can be avoided; at the same time, thermal conduction can be accelerated in subsequent tempering, and energy loss is reduced.
Owner:CHINA HANGFA CHANGZHOU LANXIANG MACHINERY CO LTD

Part surface high-frequency quenching technology

The invention belongs to the technical field of part processing, and particularly relates to a part surface high-frequency quenching technology. The part surface high-frequency quenching technology comprises the following steps that the first step, a workpiece is cleaned, specifically, impurities and dust on the surface of the workpiece are removed by cleaning fluid, then drying is conducted, andthe drying time ranges from 40min to 50min; the second step, rapid heating is conducted, specifically, the cleaned workpiece is clamped by a clamp and then is put into an inductor which is formed by hollow copper pipes in a winding mode, the clamp can be rotated, the alternating current with the frequency ranging from 1000Hz to 16000Hz is provided, the induced currents with the same frequency areformed on the surface of the workpiece, and therefore the surface or the local portion of the part can be rapidly heated; the third step, cooling soaking is conducted, specifically, the temperature ofthe surface or the local portion of the part is detected by a temperature sensor, and after the temperature ranges from 1000 DEG C to 1100 DEG C, cooling soaking is conducted on the part through liquid spraying holes of the inductor; and the fourth step, quenching is accomplished, the hardness of the surface or the local portion of the part is detected, specifically, the hardness of the surface or the local portion of the part is detected by a hardness detector, and after the requirement for the needed hardness is met, the quenching working procedure is accomplished.
Owner:南充隆固机械工业有限公司

Emergency treatment green channel information management method and device

The invention belongs to the technical field of information management, in particular to an emergency treatment green channel information management method and device. An intelligent terminal A, an intelligent terminal B, positioning equipment, an information management platform and a server are utilized to manage the emergency treatment green channel first aid flow. The steps comprise that the intelligent terminal A collects the patient identity information and the user account information, reads the identity identification information of the intelligent terminal B, obtains the server time and sends the information to the server for associated storage; the intelligent terminal B obtains the patient identity information and binds the patient and reads the location tag information and the current server time and sends the information to the server for associated storage; and visual display retrieval is performed through the information management platform and an emergency treatment green channel special disease database is established . Fine management of the emergency treatment green channel rescue flow can be realized, the emergency treatment green channel patient whole process rescue time and medical personnel arrival time, etc. can be intelligently collected, the connecting time of each link can be shortened and the emergency treatment rescue efficiency can be improved.
Owner:健和九州(北京)科技有限公司

Novel trailing drilling platform

The invention relates to a novel trailing drilling platform which belongs to the field of oil field drilling-repairing machine corollary equipment and comprises a top assembly, a bottom assembly and a drilling platform main body formed by upright posts sleeved together with circular or rectangular tubes. The novel trailing drilling platform is characterized in that a connecting device is arrangedat one end of the bottom assembly and connected with the top assembly through a sliding plate and forms a triangular rigid frame structure with the upright posts; the connecting device is in sliding connection with a catwalk which can be partly retracted to the drilling platform and connected and fixed with the connecting device and the bottom assembly of the drilling platform through lug plates and pin rolls on the catwalk into a whole to form a frame girder, and a towing pin connected with a towing vehicle is arranged at the other end of the catwalk; the bottom assembly on the other side ofthe drilling platform is provided with a wind support saddle, a pair of raising oil cylinders is arranged on the crossed part of the bottom assembly and the upright posts and connected with the end part of a one-line double-bridge wheel carrier. When the novel trailing drilling platform is moved, an upper drilling room of the drilling platform, a rotating disk, a blowout preventer hoisting device, a hydraulic station, a blowout preventer and the like do not need to be dismounted. The removal time is reduced to 2-3 hours from the prior 4-50 hours, the operating efficiency is improved and the operating cost is reduced.
Owner:中石化四机石油机械有限公司 +1

Orchard sprayer with adjustable spray range

The invention provides an orchard sprayer with the adjustable spray range. The orchard sprayer comprises a rack, an engine, a fan, a gearbox and a high-pressure pump; traveling wheels are arranged below the rack, and a spraying device is arranged on the rack and is constituted by a plurality of spraying heads which are fixed to an annular frame and radially distributed; a choke plate is arranged behind the spraying device, and the fan is arranged in front of the spraying device; the high-pressure pump and the gearbox are connected, and a clutch is arranged between the high-pressure pump and atransmission shaft for locking; the gearbox drives the traveling wheels; a water tank is arranged behind the chock plate and internally provided with a liquid conveying pipe to be connected to the high-pressure pump; and the high-pressure pump is connected with the spraying heads through outputting pipes. According to the orchard sprayer, the operation efficiency is high, a pesticide sprinkling machine can sprinkle a pesticide for crops with different heights, the heights of spraying droplets can be subjected to stepless adjusting, starting and using are carried out simultaneously, thus the connecting time is shortened, the field operation efficiency can be advantageously improved greatly, and the labor intensity is reduced.
Owner:张新锋
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products