Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

52results about How to "Change stress state" patented technology

Mine vehicle axle wheel reductor planetary gear and manufacture method thereof

The invention relates to a mine vehicle axle wheel reductor planetary gear and a manufacture method thereof. The manufacture method comprises the following processing steps of: (1) forging to obtain a gear ring; (2) roughly turning; (3) carrying out preheat treatment; (4) finely turning; (5) carrying out ultrasonic flaw detection; (6) hobbing; (7) boring a plurality of oilholes in the wall of a planet wheel inner hole in the middle of the gear ring along the radial direction of the planet wheel inner hole; (8) carburizing for heat treatment; (9) performing plain grinding on two end faces of the gear ring to the required size and then grinding the planet wheel inner hole of the gear ring to the required size; (10) grinding the gear; (11) carrying out magnetic powder inspection; (12) strengthening shot peening at gear root; and (13) carrying out manganese phosphating. The planetary gear produced by adopting the manufacture method, disclosed by the invention has the advantages that the contact fatigue strength is better, the reliability is greatly enhanced and the service life is greatly prolonged; and according to the manufacture method provided by the invention, shot peening strengthening is adopted in processing the gear root, and the stress state of the gear root is changed, so that the gear root bending strength of the planetary gear is remarkably enhanced, the strength of the planetary gear is enhanced and the service life of the planetary gear is prolonged.
Owner:WUXI WEIFU CHINA ITAL GEAR

Gas pipe corrosion defect under-pressure repair method

The invention discloses a gas pipe corrosion defect under-pressure repair method. The gas pipe corrosion defect under-pressure repair method comprises performing surface cleaning on the pipe repair position; filling the pipe perforation leakage position or the outer surface corrosion position with a repairing agent; brushing the epoxy resin primer at the pipe surface position which needs to be wrapped, wherein the thickness of the epoxy resin primer is not less than 0.2 mm; enabling a carbon fiber band to wind the epoxy resin primer brushed pipe surface in a spiral mode, wherein the carbon fiber band winds the first to third layer, a special adhesive is bonded between the layers, and the drum rolling is adopted in the process of winding of the carbon fiber band to avoid the interlayer bulge; brushing the anticorrosive paint at the carbon fiber band wrapping position of the pipe surface. According to the gas pipe corrosion defect under-pressure repair method, the defects of the traditional repair method are overcome; the pipe corrosion and perforation defects are repaired in the running state of a gas pipe, the stress state of the pipe is not changed, the flame operation is not required, and accordingly the potential safety hazard is avoided and the service life is long; the stop operation is not required and accordingly the continuous production is ensured.
Owner:SHANGHAI JINYI INSPECTION TECH

Method and device for loading cell fluid stress on deformable curved surface and experimental platform

The invention discloses a method loading cell fluid stress on a deformable curved surface. A flowing cavity and a pressure cavity are isolated from each other through a transparent elastic membrane; biological cells are inoculated onto the surface of the transparent elastic membrane which faces the flowing cavity; the flowing cavity is full of a cell culture fluid; the transparent elastic membrane is deformed by applying a pressure through the pressure cavity; and the cell culture fluid is driven to circularly flow in the flowing cavity through a peristaltic pump, so that the biological cellsare subjected to the tangential stress and pressure of the fluid. The invention further provides a device for implementing the method. The device comprises a first cover plate, a first sealing gasket, a transparent elastic membrane, a second sealing gasket and a second cover plate from top to bottom, wherein a flowing cavity is formed among the first cover plate, the first sealing gasket and the transparent elastic membrane; and a pressure cavity is formed among the transparent elastic membrane, the second sealing gasket and the second cover plate. The shape of the bottom surface of the flowing cavity where the biological cells are positioned can be changed, and a fluid stress state in which the biological cells are kept is adjusted simultaneously, so that the shape and biological characteristic change rules of biological cells in different stress states are observed and detected.
Owner:HUAZHONG UNIV OF SCI & TECH

Active and passive coupling support system for large deformation mining roadway and construction method thereof

InactiveCN110242335AControl Control Large DeformationHigh strengthMine roof capsAnchoring boltsSupporting systemCoupling
The invention discloses an active and passive coupling support system for a large deformation mining roadway. The active and passive coupling support system comprises mine I-beam brackets for supporting surrounding rock of a roadway along a roof and two sides of the roadway and matched with the inner surface of the surrounding rock of the roadway, a metal mesh is arranged between the surrounding rock of the roadway and a mine I-beam; W steel strips are arranged on the inner surface of the metal mesh in a laying mode, high-strength trays are arranged on the outer surfaces of the W steel strips; anchor rods on the roof and the two sides of the roadway penetrate through the trays, the W steel strips and metal mesh to be driven into the surrounding rock of the roadway from the inner surface of a stopping roadway; the inner surface, extending out of the roadway, of the surrounding rock of the roadway is fixed by the high-strength trays; trimming beams are arranged on the two sides of the roadway, anchor cables on the two sides of the roadway penetrate through the trimming beams, the W steel strips and the metal mesh from the inner surface of the stopping roadway to be driven into the surrounding rock of the roadway, and the inner surfaces, extending out the inner surface of the surrounding rock of the roadway, of the anchor cables are fixed by the trimming beams; the anchor cable at the top of the roadway penetrates through the trays, the W steel strips and the metal mesh from the inner surface of the stopping roadway to be driven into the surrounding rock of the roadway; and the inner surfaces, extending out the surrounding rock of the roadway, of the anchor cables are fixed by the tray. The invention further discloses a construction method of the active and passive coupling support system.
Owner:SHANDONG UNIV OF SCI & TECH

Plate incremental forming device and method based on overlaid double-layer auxiliary materials

ActiveCN110369607ANo heightNo workabilityShaping toolsHigh surfaceStressed state
The invention relates to a plate incremental forming device based on overlaid double-layer auxiliary materials. The plate incremental forming device comprises an upper auxiliary material, a lower auxiliary material and a tool head matched with the upper auxiliary material, and the upper auxiliary material and the lower auxiliary material are arranged on the two sides of a base material. Lubricating layers are arranged between the base material and the upper auxiliary material and between the base material and the lower auxiliary material. The tool head exerts pressure to the upper auxiliary material, so that the upper auxiliary material, the base material and the lower auxiliary material deform. A plate incremental forming method based on the device comprises the steps that 1) the lubricating layers are arranged on the upper surface and the lower surface of the base material and are attached to the upper auxiliary material and the lower auxiliary material, and a piled material is obtained; 2) the edge of the piled material is clamped and fixed, and processing is carried through the tool head; and 3) and the piled material is taken down, all the layers are separated, and the processed material is obtained. Compared with the prior art, it can be guaranteed that no residual height or processing mark exists on the surface of the base material, and high surface quality is achieved;and according to the plate incremental forming device based on the overlaid double-layer auxiliary materials and the plate incremental forming method, the stress state of base material forming can bechanged, friction force is reduced, and the forming limit of the base material is improved.
Owner:SHANGHAI JIAO TONG UNIV

A liquefied foundation treatment device increasing the gas content of underground water and a construction method

InactiveCN104895044ADisadvantages of Avoiding InjuryChange stress stateSoil preservationWater flowEngineering
The invention provides a liquefied foundation treatment device increasing the gas content of underground water and a construction method. The liquefied foundation treatment device comprises water pipes, geotechnical cloth, an external use water suction pump and a gas generation device. The two water pipes are water pipes with holes and include a water suction pipe and a water inlet pipe; the geotechnical cloth is wrapped around the outer layers of the water pipes. The parts with holes of the water suction pipe and the water inlet pipe are located in a liquefied foundation. The water suction pipe, the external use water suction pump, the gas generation device and the water inlet pipe are connected successively and form a closed water flow system together with the liquefied foundation. The lift of the external use water suction pump is greater than the length of the water suction pipe, so that deep underground water of the water suction pipe can be pumped out. The external use water suction pump pumps underground water in the liquefied foundation out; the pumped underground water is charged with bubbles by the gas generation device; then the water is fed to the liquefied foundation through the water inlet pipe. The liquefied foundation treatment device can reduce the saturation of the liquefied foundation without damaging the foundation structure and wasting resources.
Owner:HOHAI UNIV

Energy-storing flywheel rotor loop manufactured by winding steel wires

The invention discloses an energy-storing flywheel rotor loop manufactured by winding steel wires, and belongs to a flywheel energy-storing component. By adopting a steel wire winding prestress technology and a composite material fiber filament winding technology, a rotor hub and a composite material loop are in interference fit to assemble a flywheel rotor for solving the problems of insufficient rigidity of a hub material and the compatibility of deformation between the hub and a composite material layer. The rotor hub comprises a metal hub matrix and a steel wire prestress winding layer, the metal hub matrix is disc-shaped or cylindrical, the metal hub matrix and the steel wire pre-stress winding layer are wound and fastened by prestress from inside to outside, the innermost layer is the metal hub matrix, and the outer layer is the steel wire prestress layer. The energy-storing flywheel rotor loop manufactured by winding the steel wires disclosed by the invention has the advantages that the stress state of the flywheel hub is changed, the strength of the metal hub is greatly improved, the use performance of the hub is improved, the inside and outside radius ratio of the flywheel rotor is increased, the compatibility of deformation of the hub and a rim is improved, the energy storage density of the flywheel is improved, and the manufacturing cost of the rotor is obviously reduced.
Owner:UNIV OF SCI & TECH BEIJING

Pressure relief and monitoring method for continuous large deformation of deep roadway coal side

The invention discloses a pressure relief and monitoring method for continuous large deformation of deep roadway coal sides. The pressure relief and monitoring method mainly aims at solving the problems that continuous large deformation of two sides of a deep roadway and damage of a support system have to be expanded, brushed and repaired all the time to guarantee functions of the roadway, and themaintenance cost is greatly increased. According to the pressure relief and monitoring method for continuous large deformation of the deep roadway coal sides, large pressure relief hole groups parallel to the axial direction of the roadway are arranged in the deep areas of the two sides of the roadway, surrounding rock deformation energy can be partially released, the bearing stress peak values of the two sides can be greatly transferred to the deep part, and meanwhile a large compensation space is provided for continuous migration of deep coal bodies to the roadway space; the pressure reliefholes are drill holes having different numbers and manners and constructed by arranging drill sites on two sides of the roadway, and have different diameters by means of radial hydraulic jet flow ormechanical hole expansion; and stress and deformation monitoring systems are arranged on the two sides of the roadway, when stress and deformation are increased, that is, after the hole groups are closed, the pressure relief hole groups are implemented again, long-time effective monitoring and control of deep coal roadway surrounding rocks are achieved, and the roadway maintenance work amount andcost are greatly reduced.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Method for testing wrinkling performance of plate based on uniaxial tension of perforated sample

The invention provides a method for testing the wrinkling performance of a plate based on uniaxial tension of a perforated sample. A circular inner hole is machined in the geometric center of a sampleto change the stress distribution in the uniaxial tension process of a plate, and the wrinkle resistance of a flat plate sample in different stress states is obtained. The sample can be strip-shaped,square or circular. The method specifically comprises the following steps of: (1) determining the shape and size of a sample; (2) analyzing uniaxial tension deformation of the sample by utilizing numerical simulation, and determining the diameter d of an inner hole according to stress distribution and the wrinkling height h; (3) processing the sample according to the shape and the size; (4) stretching the sample at a constant speed v on a universal testing machine; and (5) detecting and recording the wrinkling amount H of the sample. According to the method, by adjusting the size of the innerhole, the wrinkle resistance of the plate can be analyzed within a large dependent variable range, the wrinkle characteristic closer to the actual situation is obtained, no special clamp or device isneeded, and the method is simple, easy to implement and high in repeatability.
Owner:HBIS COMPANY LIMITED HANDAN BRANCH COMPANY +2

Anchor cable structure and anchor cable frame beam construction method

The invention relates to an anchor cable structure and an anchor cable frame beam construction method. The anchor cable structure comprises a guide cap, an anchor cable component, tightening rings, agrouting pipe, expansion rings, an anchorage device, a concrete anchor inclined support and an anchor head, the anchor cable component is divided into a free section and an anchoring section, the topend of the anchor cable free section is arranged on a reinforced concrete frame through the anchorage device, the bottom end of the anchoring section is fixedly connected with the guide cap, and the anchor cable component comprises a steel strand and a steel strand casing pipe. A free section of the steel strand is an oiled coating steel strand, an anchoring section of the steel strand is an exposed steel strand, the steel strand is bound into a steel strand bundle through the evenly-arranged tightening rings, the grouting pipe is arranged in the center of the steel strand bundle, the expansion rings are evenly arranged on the anchoring section of the anchor cable component, the concrete anchor inclined support is arranged at the outer side of the reinforced concrete frame, and the anchorhead is a concrete closed anchor head. A PVC pipe is arranged at the outer side of the free section of the anchor cable component in a sleeving manner, spiral ribs are arranged in frame beams, and gaps are formed between the anchor cable component and the side walls of anchor holes. The slope stress state and the stable state can be changed, and the stability is improved.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Laser ultrasonic method-based steel rail temperature stress calibration platform

The invention discloses a laser ultrasonic method-based steel rail temperature stress calibration platform, which comprises a steel rail fixing device, a steel rail tension and compression device, a laser ultrasonic excitation device and a laser ultrasonic receiving device, wherein the steel rail tension and compression device comprises steel rail locking mechanisms, oil cylinders and reversing valves, the front end and the rear end of the steel rail are respectively fixed with one steel rail locking mechanism, the oil cylinders are arranged between the same sides of the front steel rail locking mechanism and the rear steel rail locking mechanism, an oil port of a rod cavity of each oil cylinder is connected with the reversing valve via an oil pipe, an oil port of a rodless cavity of each oil cylinder is connected with the reversing valve via an oil pipe, and the reversing valve is connected with a hydraulic power unit via a pipeline. Tension or compression is applied to the steel rail via the steel rail tension and compression device, the stress state of the steel rail is changed, ultrasounds are excited on the surface of the steel rail by the laser ultrasonic excitation device, the laser ultrasonic receiving device receives ultrasonic signals, and the receiving time under different stresses is marked. Pulse laser is adopted to excite the ultrasounds, a coupling agent is not needed, a non-contact mode is provided, requirements on the surface of the steel rail are low, the detection speed is quick, and the efficiency and the precision are high.
Owner:WENZHOU UNIVERSITY

High-precision zirconium alloy plate rolling method

The invention discloses a high-precision zirconium alloy plate rolling method. The method comprises the steps that 1, a zirconium alloy slab is polished until the intra-plate difference is 0.15-0.25 mm; 2, the polished zirconium alloy slab passes through a working roller of a reversible plate rolling mill and is clamped by a hydraulic clamp, and then a hydraulic cylinder provided with a tension sensor is used for making the polished zirconium alloy slab generate and keep tension; and 3, reciprocating tension rolling is carried out and the tension in the rolling process of the zirconium alloy slab is simultaneously controlled to obtain a zirconium alloy plate material. According to the method, the hydraulic cylinder with the tension sensor, a displacement sensor and the plate rolling mill are cooperatively used, the zirconium alloy plate is subjected to reciprocating tension rolling, and the deformation resistance of the working roller and the zirconium alloy plate is reduced by accurately adjusting the tension during rolling, so that the phenomenon of uneven rolling of the zirconium alloy plate and surface scratches and cracks caused by moving and sliding of the zirconium alloy plate are avoided, and the precision of the surface of the zirconium alloy plate is improved.
Owner:西安西部新锆科技股份有限公司

Coal mine impact ground pressure and harmful gas comprehensive prevention and treatment system and method

The invention discloses a coal mine impact ground pressure and harmful gas comprehensive prevention and treatment system and method. Firstly, according to roof lithology and pressure characteristics of a coal mining work face, a target rock layer of horizontal well staged fracturing is determined, according to the target rock stratum and coal seam work face characteristics, a well spacing manner of a horizontal well is determined, the horizontal well is drilled, in the horizontal well, a target rock stratum and a coal seam are subjected to fracturing, through fracturing, the target rock stratum and the coal seam form an inter-communication net-shaped fracture, a ground pump drainage system is built, harmful gas in the coal seam is subjected to pump drainage, the horizontal well is mountedin the target rock stratum, in the horizontal well, the target rock stratum and the coal seam are subjected to fracturing, the inter-communication net-shaped fracture is formed in the target rock stratum and the coal seam, fracturing pressure relief of the target rock stratum is achieved, the stress state of a coal seam roof is changed, happening of an impact ground pressure accident is avoided, and meanwhile, release and pump drainage of harmful gas in the coal seam can be achieved.
Owner:陕西省煤层气开发利用有限公司

Indoor experiment simulation device and method for geological fault mechanics behaviors of triaxial tester

The invention belongs to the technical field of geotechnical engineering, and particularly relates to an indoor experiment simulation device and method for geological fault mechanics behaviors of a triaxial tester. According to the indoor experiment simulation device for the geological fault mechanics behaviors of the triaxial tester, a guide groove is formed in a connecting pressing plate, so that water can be led into the surface of a sample; and when the triaxial tester applies pressures in three directions, different stresses can be generated in the three directions by the sample, and a stress state of the sample can be changed by adjusting the pressure in each direction. In an experiment process, the pressure applied to water on the surface of the sample in the guide groove can be adjusted, so that a nature state can be simulated. According to the experiment method disclosed by the invention, a three-direction unequal stress environment can be realized by three groups of pressureheads of the triaxial tester, and a seepage field under a real condition is simulated through the guide groove in the connecting pressing plate, so that indoor experiment simulation of a stress-seepage environment where a real fault is located can be realized.
Owner:SICHUAN UNIV +1

Plate forming device and forming method capable of reducing minimum bending radius of plates

ActiveCN107243529AEasy to pushReduce the tensile stress valueShaping toolsBend radiusMechanical engineering
The invention discloses a plate forming device and forming method capable of reducing the minimum bending radius of plates. The device comprises a convex mould, a concave mould, a side pressing ring, a pressure plate and a power supply system, wherein the side pressing ring is arranged above the concave mould; an expanding coil is embedded into a circular bead of the concave mould; one side, away from the circular bead, of the upper part of the concave mould is embedded with a first side pushing coil; a second side pushing coil is arranged on a position, which corresponds to the first side pushing coil, of the side pressing ring; a third side pushing coil is embedded into a position, below the circular bead, of the concave mould; a fourth side pushing coil is embedded into the lower part of the convex mould; the lower corner of the pressure plate is embedded with an inflecting coil which prevents a bending angle of the plate from reverse deformation; and the power supply system supplies power to the expanding coil, the first side pushing coil, the second side pushing coil, the third side pushing coil, the fourth side pushing coil and the inflecting coil. The forming device can reduce the minimum bending radius value of the plate, prevents the outer layer of the plate from bending and cracking, and can inhibit the plate from rebounding.
Owner:CENT SOUTH UNIV

Device and method for preparing high-density twin crystal material

The invention discloses a device and method for preparing a high-density twin crystal material. The device for preparing the high-density twin crystal material comprises a fixing device used for fixing a sample, a transmitting device arranged in front of the sample and a recovery device arranged behind the sample. The fixing device comprises a through hole matched with the size of the outer edge of the sample. The transmitting device comprises a flying sheet which is matched with the shape of the sample and is parallel to the sample, an elastic support used for supporting the flying sheet to move towards the sample and a gun barrel allowing the elastic support to fly. The recovery device comprises a buffer layer arranged on the rearmost portion. A window connected with the sample is arranged behind the sample, and the material of the window is the same as that of the sample. Compared with a traditional gas gun device, the structure is simple, operation is convenient, the stress state generated when the sample is bumped is changed, energy consumption generated in the use process is low, and the metal material with high-density twin crystals can be obtained more easily even though the speed is low. The interior of an obtained product is not damaged, and unfavorable conditions that grains are refined and structures are generated are also avoided.
Owner:SOUTHWEST JIAOTONG UNIV

A sheet metal forming device and forming method capable of reducing the minimum bending radius of the sheet metal

The invention discloses a plate forming device and forming method capable of reducing the minimum bending radius of plates. The device comprises a convex mould, a concave mould, a side pressing ring, a pressure plate and a power supply system, wherein the side pressing ring is arranged above the concave mould; an expanding coil is embedded into a circular bead of the concave mould; one side, away from the circular bead, of the upper part of the concave mould is embedded with a first side pushing coil; a second side pushing coil is arranged on a position, which corresponds to the first side pushing coil, of the side pressing ring; a third side pushing coil is embedded into a position, below the circular bead, of the concave mould; a fourth side pushing coil is embedded into the lower part of the convex mould; the lower corner of the pressure plate is embedded with an inflecting coil which prevents a bending angle of the plate from reverse deformation; and the power supply system supplies power to the expanding coil, the first side pushing coil, the second side pushing coil, the third side pushing coil, the fourth side pushing coil and the inflecting coil. The forming device can reduce the minimum bending radius value of the plate, prevents the outer layer of the plate from bending and cracking, and can inhibit the plate from rebounding.
Owner:CENT SOUTH UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products