The present invention is a walking jacking method for a large-span bottom-supported tie-bar steel
arch bridge; it includes making a jacking device: a jacking frame, an "L-shaped" jacking frame, a walking jacking device, a
cushion beam, a guide beam, an arch support, and a counterweight; jacking operation: completing the
assembly of the
arch bridge and the guide beam in the
assembly area, loading the walking jacking device, transferring the load, and removing the
assembly frame; continuing to jack the
arch bridge forward, when the bridge
tail is about to leave the
pier, adding a counterweight behind the bridge and laying it on the
tail bridge deck; continuing to slide until the
cantilever is maximum, at which time the end deflection is less than the cylinder
stroke of the walking jacking device, and removing the rear counterweight; continuing to jack until the designed position along the bridge axis is reached, and the guide beam is removed; the
pier device is turned 90 degrees, and the bridge body is slid vertically to the bridge to the designed position. The method assembles the steel arch bridge into a whole above the approach bridge in advance, and then uses "walking jacking sliding" to jack and slide the bridge to the designed position. This method can reduce the difficulty of construction and improve quality, safety and construction period.