Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

30results about How to "Meet the needs of rapid construction" patented technology

Water-rich weak surrounding rock long-and-big tunnel construction method

The invention discloses a water-rich weak surrounding rock long-and-big tunnel construction method. The method includes that a tunnel inclined shaft is arranged on one side of a main tunnel of a tunnel to be constructed, the main tunnel is divided into a tunnel entry section, a tunnel exit section and a middle connecting section connected between the tunnel entry section and the tunnel exit section, the middle connecting section is divided into an inclined shaft assisting construction entry section and an inclined shaft assisting construction exit section, and each of the tunnel entry section, the tunnel exit section, the inclined shaft assisting construction entry section and the inclined shaft assisting construction exit section is divided into multiple sections for construction. A construction method of each section includes: step 1, performing geological forecasting in advance, and when a debris flow formation exists ahead, entering a step 2, or else, entering a step 3; step 2, performing stability control construction; step 3, determining a primary supporting scheme; step 4, excavating the tunnel, and performing primary supporting construction; step 5, performing secondary lining construction on the tunnel. The water-rich weak surrounding rock long-big tunnel construction method is simple in step, reasonable in design, simple and convenient to construct, good in using effect, capable of meeting construction requirements of water-rich weak surrounding rock long-and-big tunnels, short in construction period and safe in construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP

Fast rail-exchanging vehicle for jointless track and rail-exchanging method

The invention relates to a fast rail-exchanging vehicle for a jointless track and a rail-exchanging method. The front and back ends of a travel mechanism of a fast rail-exchanging vehicle for a railway are provided with a guardrail recovering device; a crosstie-pressing device, a steel rail retraction device for clamping and moving a new steel rail and an old steel rail, a steel rail clincher and an operating position are arranged at intervals below the vehicle body between two bogies of the travel mechanism, the operating position is arranged according to the need; and the crosstie-pressing device and the steel rail clincher are arranged respectively close to the bogies at the two ends; and the vehicle can perform the marshalling operation together with the auxiliary vehicles, such as a fastener recovered vehicle, and the like. When the fast rail-exchanging vehicle for the railway is adopted for construction, the operation is divided into two parts of the old steel rail retraction operation and the new steel rail retraction operation which are synchronously carried out. The vehicle can reach the rail-exchanging speed of more than 2km/h, can be applied to the fast rail-exchanging need of the jointless track, complete the rail exchanging within 50 meters and is suitable for the construction needs of the section with less curve radius. The invention has the advantages of safety and high degree of automation.
Owner:株洲新通铁路装备有限公司

Railway construction machine guard rail hoisting device and rail replacing locomotive guard rail hoisting device

The invention relates to a railway construction machine guard rail hoisting device and a rail replacing locomotive guard rail hoisting device, comprising a guard rail hoisting apparatus and an anti-loosing device, wherein the guard rail hoisting apparatus is arranged below a railway construction machine, such as a rail replacing operation vehicle traveling mechanism vehicle body and can integrally lift and transversely move a railway construction machine vehicle body, and the anti-loosing device is arranged on each steering frame of a steel rail traveling machine to enable the steering frames and the vehicle body to be vertically fixed into a whole. The guard rail hoisting apparatus comprises an elongated supporting body, a guard rail suspension bracket and a control device, wherein the supporting body is fixedly suspended below the vehicle body through the guard rail suspension bracket, the control device is used for controlling the movement of the supporting body, a guard rail assembly is respectively arranged at both ends below the supporting body, the control device comprises two telescopic guard rail vertical oil cylinders and telescopic guard rail integral swinging oil cylinders, and the guard rail suspension bracket is provided with two downward stretching struts which are respectively hinged with both ends of the supporting body through two guard rail support rods. The invention enables a railway which needs to be born but is not completely fixed to be kept in an upright state in the construction process, farthest prevents the occurrence of a turning-way accident, and also enables the turning-way railway construction machine to rapidly hoist and safely reset.
Owner:株洲新通铁路装备有限公司

Complete solid-state beam current type reinforcing steel corrosion monitoring sensor and method for producing the same

The present invention provides a total solid beam contraction type steel corrosion monitoring sensor and a preparation method thereof. The total solid beam contraction type steel corrosion monitoring sensor comprises three graphite beam contraction rings, three total solid reference electrode, two sensor fixing racks, three sets of beam contraction protecting casing and three sets of PVC tubes used for packing the total solid reference electrodes and leading out the conducting wire. The invention uses finite elements for analyzing the arrangement characteristic of potential wire in solid dielectric of concrete, and at the same time adopts a long-lifetime and total solid reference electrodes which are developed independently for realizing the control to the area of working electrode in the corrosion monitoring process with the electrochemistry method. Finally the total solid beam contraction type corrosion sensor which has reasonable structure and is suitable for the application of actual project is designed out. A designing concept of ''plug and play'' is adopted in the designing process of sensor. The fast construction requirement can be satisfied, and the laying process of the sensor is greatly simplified.
Owner:HARBIN INST OF TECH

Novel combined concrete protection wall for manual rectangular anti-slide digging pile and installation method of novel combined concrete protection wall

The invention provides a novel combined concrete protection wall for a manual rectangular anti-slide digging pile and an installation method of the novel combined concrete protection wall. The anti-slide pile protection wall is formed by one section of rectangular protection wall or by connecting more than one sections of rectangular protection walls in a vertical manner; each section of rectangular protection wall includes one or more sub-protection walls; the sub-protection walls are divided into two types of middle sub-protection walls and corner sub-protection walls; the sub-protection walls are connected with each other; convex blocks are arranged at the front sides of the middle sub-protection walls, and concave blocks are arranged at the back sides; the corner sub-protection walls are provided with convex blocks only at the front sides or at the back sides; the later sub-protection walls are connected with the previous concave blocks through the convex blocks; steel plates are embedded in the middles of the sub-protection walls; and holes are formed in the upper and lower sides of the sub-protection walls for accepting in reinforcements. The anti-slide pile protection wall is simple in structure, reasonable in design and fast in construction speed, is prefabricated according to the size of an anti-slide pile, is simple in assembly, is easy to guarantee the quality, and can satisfy the demands of quick construction.
Owner:WUHAN SURVEYING GEOTECHN RES INST OF MCC

River channel intelligent management and control system

The invention discloses an intelligent riverway management and control system, which belongs to the technical field of intelligent riverway pipelines, and is characterized by comprising an infrastructure layer, a data layer, a service layer and an application layer, wherein the infrastructure layer comprises a development environment system, a database management system, an operating system, a network environment and hardware equipment; the infrastructure layer provides a server, a switch, a terminal, safe and stored software and hardware, a place and a network communication environment for the data layer, the service layer and the application layer, wherein the data layer is a service basic database and is used for storing basic data, and the data layer provides IoT data support for different application systems; the service layer comprises an equipment monitoring perception service, an equipment connection management service, a model and monitoring data exchange service and an authority control service; the application layer comprises an intranet portal website and an extranet portal website; and the infrastructure layer, the data layer, the service layer and the application layer perform data interaction in sequence through a data exchange system.
Owner:HEBEI RES INST OF INVESTIGATION & DESIGN OF WATER CONSERVANCY & HYDROPOWER

Isolation negative pressure shelter for infectious disease prevention and control

The invention belongs to the technical field of medical facilities, and particularly relates to an isolation negative pressure shelter for infectious disease prevention and control. The isolation negative pressure shelter comprises a base and a cover plate group, wherein a wall body group is mounted between the base and the cover plate group, the wall body group comprises a fixed wall, a movable wall and two foldable side wall groups, a door frame is arranged on the fixed wall, and a sealing door is mounted in the door frame. The base comprises two underframe groups and a plurality of supporting plates detachably mounted between the two underframe groups, each side wall group comprises a plurality of side wall plates which are hinged in sequence, the fixed wall and the movable wall are parallel to each other, a first fixing structure is arranged between the side wall plates and the underframe groups, and the cover plate group comprises a first cover plate, a second cover plate and a plurality of third cover plates. The third cover plates are sequentially connected between the first cover plate and the second cover plate, and a second fixing structure is arranged between the cover plate group and the wall body group. The negative pressure shelter aims to solve the problems that due to the structural defects of an existing negative pressure shelter, assembling is complex, the construction time is long, and the rapid construction requirements during epidemic outbreak are difficult to meet.
Owner:中国人民解放军火箭军特色医学中心

Modular prefabricated reinforced concrete hollow pier structure and assembly method thereof

The invention discloses a modular prefabricated reinforced concrete hollow pier structure and anassembly method thereof. The structure includes a cast-in-place cushion cap, transverse-assembly pier segments, vertical prestressing bars and assembly cap beams. Each transverse-assembly pier segment includes left and right asymmetric assembly sections, a middle assembly section and a steel bar connector, wherein the left and right asymmetric assembly sections are connected with the middle assembly section through the steel bar connector and finish rolling thread steel. The transverse-assembly piersegments are vertically overlapped with staggered joints and connected with the vertical prestressing bars, and the vertical prestressing bars are tensioned in multiple stages, and the assembly cap beams are divided into several sections and connected through transverse prestressing bars. According to the lifting capacity and construction mode of construction equipment, the height and transverseblock size of the transverse-assembly pier segments can be divided, installation is easy, horizontal and vertical assembly and connection are reliable, construction is convenient, and the transportation and assembling problems of prefabricated components of a modular prefabricated reinforced concrete hollow pier in complex mountainous environment can be solved.
Owner:BEIJING UNIV OF TECH

High-heat-insulation heat preservation plate and preparation method thereof

The invention discloses a high-heat-insulation heat preservation plate. The high-heat-insulation heat preservation plate comprises a first base plate and a second base plate, the two ends of one sideof the first base plate are connected with first connecting plates, one side of each first connecting plate is connected with a first sliding plate, the two ends of one side of the second base plate are provided with first clamping grooves, and one side of each first clamping groove is provided with a first sliding groove. The first base plate and the second base plate can be preliminarily splicedby inserting second connecting plates and second sliding plates at the two ends of one side of a protruding block into second clamping grooves in the inner walls of corresponding first grooves and corresponding second grooves, the first connecting plates and the first sliding plates on one side of the first base plate are inserted into the first clamping grooves in one side of the second base plate, the one side of the first base plate is tightly attached to one side of the second base plate, thus the first base plate and the second base plate can be spliced and mounted secondly, the first base plate and the second base plate can be spliced, so that splicing, mounting and demounting are convenient, the splicing efficiency is high, and the requirement for rapid construction can be met.
Owner:江门市鹏美绿家厨卫科技有限公司

Construction method for rapid underwater repair of leakage cracks of concrete faced rockfill dam and repair structure of construction method

InactiveCN111535253AEliminate the effects of bond strengthFast constructionEarth-fill damsRock-fill damsEmergency treatmentMarine engineering
The invention discloses a construction method for rapid underwater repair of leakage cracks of a concrete faced rockfill dam. The construction method for rapid underwater repair of the leakage cracksof the concrete faced rockfill dam comprises the following steps in sequence: step 1, washing is carried out from top to bottom along the cracks to ensure that the concrete base surface is washed out;step 2, the concrete base surface is washed again; step 3, even painting of a underwater epoxy cement prime coat is carried out along the cracks from top to bottom; step 4, underwater rapid sealing materials are rolled into a cylindrical shape, the materials are bagged and sent underwater; step 5, the cylindrical underwater rapid sealing materials are pressed tightly along the cracks, and it is guaranteed that the middle is thick and the two sides are thin after pressing; step 6, after a flexible surface protection layer is spread underwater along the cracks, a fixed structure is used for fixing the flexible surface protection layer to the concrete base surface; step 7, after all procedures are completed, the treatment area is checked. The construction method for rapid underwater repair of the leakage cracks of the concrete faced rockfill dam has the advantages of simple materials, rapid construction, and capability of meeting rapid construction requirements during underwater emergency treatment. The invention further discloses a rapid underwater repair structure for the leakage cracks.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES

Construction Method of Long Tunnel with Rich Water and Weak Surrounding Rock

The invention discloses a water-rich weak surrounding rock long-and-big tunnel construction method. The method includes that a tunnel inclined shaft is arranged on one side of a main tunnel of a tunnel to be constructed, the main tunnel is divided into a tunnel entry section, a tunnel exit section and a middle connecting section connected between the tunnel entry section and the tunnel exit section, the middle connecting section is divided into an inclined shaft assisting construction entry section and an inclined shaft assisting construction exit section, and each of the tunnel entry section, the tunnel exit section, the inclined shaft assisting construction entry section and the inclined shaft assisting construction exit section is divided into multiple sections for construction. A construction method of each section includes: step 1, performing geological forecasting in advance, and when a debris flow formation exists ahead, entering a step 2, or else, entering a step 3; step 2, performing stability control construction; step 3, determining a primary supporting scheme; step 4, excavating the tunnel, and performing primary supporting construction; step 5, performing secondary lining construction on the tunnel. The water-rich weak surrounding rock long-big tunnel construction method is simple in step, reasonable in design, simple and convenient to construct, good in using effect, capable of meeting construction requirements of water-rich weak surrounding rock long-and-big tunnels, short in construction period and safe in construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP CORP LTD

Complete solid-state beam current type reinforcing steel corrosion monitoring sensor and method for producing the same

The present invention provides a total solid beam contraction type steel corrosion monitoring sensor and a preparation method thereof. The total solid beam contraction type steel corrosion monitoring sensor comprises three graphite beam contraction rings, three total solid reference electrode, two sensor fixing racks, three sets of beam contraction protecting casing and three sets of PVC tubes used for packing the total solid reference electrodes and leading out the conducting wire. The invention uses finite elements for analyzing the arrangement characteristic of potential wire in solid dielectric of concrete, and at the same time adopts a long-lifetime and total solid reference electrodes which are developed independently for realizing the control to the area of working electrode in thecorrosion monitoring process with the electrochemistry method. Finally the total solid beam contraction type corrosion sensor which has reasonable structure and is suitable for the application of actual project is designed out. A designing concept of ''plug and play'' is adopted in the designing process of sensor. The fast construction requirement can be satisfied, and the laying process of the sensor is greatly simplified.
Owner:HARBIN INST OF TECH

Railway construction machine guard rail hoisting device and rail replacing locomotive guard rail hoisting device

The invention relates to a railway construction machine guard rail hoisting device and a rail replacing locomotive guard rail hoisting device, comprising a guard rail hoisting apparatus and an anti-loosing device, wherein the guard rail hoisting apparatus is arranged below a railway construction machine, such as a rail replacing operation vehicle traveling mechanism vehicle body and can integrally lift and transversely move a railway construction machine vehicle body, and the anti-loosing device is arranged on each steering frame of a steel rail traveling machine to enable the steering framesand the vehicle body to be vertically fixed into a whole. The guard rail hoisting apparatus comprises an elongated supporting body, a guard rail suspension bracket and a control device, wherein the supporting body is fixedly suspended below the vehicle body through the guard rail suspension bracket, the control device is used for controlling the movement of the supporting body, a guard rail assembly is respectively arranged at both ends below the supporting body, the control device comprises two telescopic guard rail vertical oil cylinders and telescopic guard rail integral swinging oil cylinders, and the guard rail suspension bracket is provided with two downward stretching struts which are respectively hinged with both ends of the supporting body through two guard rail support rods. Theinvention enables a railway which needs to be born but is not completely fixed to be kept in an upright state in the construction process, farthest prevents the occurrence of a turning-way accident, and also enables the turning-way railway construction machine to rapidly hoist and safely reset.
Owner:株洲新通铁路装备有限公司

Three-point positioning, measuring, setting and placing device and rapid batch placing method

The invention relates to the technical field of building equipment, in particular to a three-point positioning measuring, setting and placing device and method. The three-point positioning measuring, setting and placing device comprises a first rod piece, a second rod piece, a third rod piece and a placing seal; the shortest distance between the point position of a to-be-measured setting point and the upper, lower, left and right edges of the building unit is a first distance a, the second shortest distance between the point position of the to-be-measured setting point and the upper, lower, left and right edges of the building unit is b, and the second edge is perpendicular to the first edge. A point position of a setting point to be measured and a certain point of the first edge are connected to form an oblique line, an included angle alpha between the oblique line and the first rod piece is 30-60 degrees, the length of the oblique line is c, the length of the first rod piece is a, the length of the second rod piece is b, an included angle alpha between the third rod piece and the first rod piece is alpha, and the length of the third rod piece is c. The device provided by the invention has the advantages of high speed of measuring and setting points, small error and capability of reducing material waste.
Owner:中建六局华南建设有限公司

A kind of high thermal insulation board and preparation method thereof

The invention discloses a high heat insulation board, which comprises a first base plate and a second base plate, a first connecting plate is connected to one side and two ends of the first base plate, and a second connecting plate is connected to one side of the first connecting plate. A slide plate, first slots are opened at both ends of one side of the second substrate, and a first slide slot is opened at one side of the first slot. In the present invention, the first substrate and the second substrate can be preliminarily connected by inserting the second connecting plate and the second sliding plate at the two ends of one side of the protrusion into the second locking groove on the inner wall corresponding to the first groove and the second groove. For the splicing, the first connecting plate and the first slide plate on the side of the first substrate are inserted into the first slot on the side of the second substrate, and the first substrate and the side of the second substrate are closely bonded. The base plate and the second base plate are spliced ​​and installed in the second step to complete the splicing of the first base plate and the second base plate, thereby facilitating splicing installation and disassembly, high splicing efficiency, and meeting the needs of rapid construction.
Owner:江门市鹏美绿家厨卫科技有限公司

Assembly type conical special-shaped steel pipe column foot with restorable function and assembly method

The invention discloses an assembly type conical special-shaped steel pipe column foot with a restorable function and an assembly method. The column foot comprises a box-shaped foundation, a conical special-shaped steel pipe short column, an I-shaped steel column, semi-arc angle steel, prestressed cables and special-shaped soft steel ring springs; and the box-shaped foundation is connected with the semi-arc angle steel through high-strength bolts, the conical special-shaped steel pipe is provided with vertical long circular bolt holes and connected with the semi-arc angle steel through high-strength bolts configured with the special-shaped soft steel ring springs, the outer side conical curved surface pipe wall is tightly combined with the inner side conical curved surface of the semi-arcangle steel to form a wedge-shaped friction pair, the special-shaped soft steel ring springs are tightly combined with the contact faces, the conical special-shaped steel pipe short column and the I-shaped steel column are connected through high-strength bolts, and the box-shaped foundation and the I-shaped steel column are connected through the prestressed cables to achieve a self-resetting function. According to the column foot and the method, the assembly degree is high, the use function of the column foot can be rapidly recovered by replacing a small number of damaged elements after an earthquake, meanwhile, the self-resetting function is achieved, and a replaceable structure system and a self-resetting system are combined.
Owner:CHONGQING UNIV

Adjustable 3D printing colored cement-based mixture

The invention discloses an adjustable 3D printing colored cement-based mixture. The mixture is characterized by comprising a dry mixed material and an auxiliary material, and the dry mixed material comprises, by weight, 50-200 parts of white cement; 10-80 parts of mineral powder; 0.09-0.42 part of cellulose ether; 0.01-0.3 part of fiber; 0-50 parts of a pigment; and 60-560 parts of medium sand; and the auxiliary material and the dry mixture are mixed according to a certain proportion to prepare the adjustable 3D printing colored cement-based mixture. By controlling the proportion of cellulose ether, white cement, mineral powder, medium sand, fiber and pigment in the components of the 3D printing cement-based mixture, the adjustable 3D printing colored cement-based mixture is prepared, and the effects of improving the operability of 3D printing cement, meeting the rapid construction requirement and facilitating popularization and application of the 3D printing technology can be achieved.
Owner:CHINA RAILWAY 23RD BUREAU GRP RAILTRANSIT ENG CO LTD

Shield machine

ActiveCN113446021BImprove mobilityAvoid the adverse phenomenon of delay in the design periodUnderground chambersTunnel liningControl systemElectrical connection
The invention provides a shield machine, which includes a first heavy truck, a second heavy truck, a third heavy truck, a fourth heavy truck and a fifth heavy truck, the first heavy truck is provided with a reaction force frame and a main engine system, the reaction frame is connected with the host system and can drive the host system to move; the second heavy truck is equipped with a control system; the third heavy truck is equipped with a hydraulic system; the fourth heavy truck is equipped with an injection system; the fifth heavy truck is equipped with an injection system; The heavy truck is provided with a power supply system; wherein, the power supply system can be electrically connected with the control system, the control system can be electrically connected with the hydraulic system and the injection system, and the control system can control the actions of the hydraulic system and the injection system. The shield machine of the present invention occupies a small space, is convenient for production, manufacturing and assembly, does not need to configure a production workshop with complex functions, can start excavation at any time, enhances the flexibility of the shield machine, and effectively reduces processing and manufacturing costs and assembly and debugging time.
Owner:CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD

A seamless track fast track changing operation vehicle and its track changing method

The invention relates to a fast track changing vehicle for a seamless line and a fast track changing operation method. The front and rear ends of the running mechanism of the fast railway changing track working vehicle are provided with guard rail recovery devices, and the vehicle between the two bogies of the running mechanism There are pillow pressing devices, rail retracting devices for clamping and moving new rails and old rails at intervals under the body, rail positioning devices, and operating positions set according to needs. The pillow pressing devices and rail positioning devices are respectively close to the two ends Bogie settings. It can also be combined with auxiliary operation vehicles such as fastener recovery vehicles. Using the above-mentioned railway rapid rail change operation vehicles for construction, it is divided into two parts: the old rail retraction operation and the new rail retraction operation, and the two operations are carried out at the same time. It can achieve a rail changing speed of more than 2km / h, can meet the needs of fast track changing on seamless lines, complete track changing within 50 meters, and adapt to the construction needs of road sections with small curve radius. It has the advantages of safety and high degree of automation. advantage.
Owner:株洲新通铁路装备有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products