The present invention provides a bridge
system conversion structure and construction method based on a corrugated steel web
composite structure. By using a prefabricated composite
assembly section and a steel-concrete hoisting section, the existing T-shaped
rigid frame bridge simply supported hanging hole
system can be quickly converted into a continuous
system. At the same time, a corrugated steel web-UHPC steel-concrete composite beam is used to replace a traditional concrete hanging beam, thereby reducing the
dead weight of the structure. In conjunction with the conversion of the system, the
bending moment at the root of the T-frame is greatly reduced, and the
structural safety redundancy is improved. A steel top plate + inverted V-shaped shear key ultra-
high performance concrete composite
bridge deck system is adopted, which can greatly reduce the
dead weight and solve the
cracking problem compared with a concrete
bridge deck. Compared with a steel
bridge deck, the top plate stiffening rib can be omitted and the steel plate thickness can be reduced, and the overall durability is good. During construction, factory
prefabrication and on-site installation are adopted, thereby avoiding complex on-site steel-concrete combined section construction, and there is no need to set up temporary supports in the water. The overall hoisting and connection
assembly are pre-connected to achieve rapid installation in a short time, and the construction process is simple.