Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

51results about How to "Increase construction area" patented technology

Super-strength polyurethane waterproof coating and preparation method thereof

InactiveCN102433061AElastomerImprove strong adhesionPolyurea/polyurethane coatingsSolventChlorinated paraffins
The invention relates to a super-strength two-component polyurethane waterproof coating which is made of petroleum resin. The polyurethane waterproof coating is prepared by the following method. The raw materials of the polyurethane waterproof coating comprise a component A and a component B, wherein the component A contains 60.0-70.0 parts of polyether diol, 10.0-20.0 parts of polyether polyol and 15.0-25.0 parts of chain extender by weight; and the component B contains 30.0-35.0 parts of chlorinated paraffin, 20.0-25.0 parts of vulcanizing agent, 5.0-10.0 parts of polyether polyol, 10.0-15.0 parts of petroleum resin, 15.0-20.0 parts of filler, 0.03-0.1 parts of assistant and 5.0-10.0 parts of solvent by weight. Since the petroleum resin is added into the raw materials of the super-strength two-component polyurethane waterproof coating and has unsaturated bonds which can be bonded with polyurethane in the generation process of the polyurethane to increase the length of molecular chains, the tensile strength and the elongation at break of the coating film are greatly improved and the mechanical properties are better than that of the product in which the petroleum resin is not added. At the same time, since the price of the petroleum resin is low, the material is convenient to obtain, the cost of the two-component polyurethane waterproof coating product is low and the economic benefit is greater.
Owner:BEIJING LIGAO WATERPROOF ENG CO LTD +1

Variable cross section tunnel excavation construction method based on climbing pilot tunnel

The invention discloses a variable cross section tunnel excavation construction method based on a climbing pilot tunnel. The variable cross section tunnel excavation construction method comprises thefollowing steps that 1, a small pilot tunnel climbing a slope and topping; topping from a small section to the center line direction of a large section tunnel by adopting a pilot tunnel mode, and digging the pilot tunnel obliquely upwards in an equal section manner until the pilot tunnel and an arch crown of the large section tunnel are positioned at the same elevation; 2, expanding and excavatinga transition section; continuing excavating the top of the pilot tunnel forwards to form the transition section; 3, excavating a standard section; excavating forwards from the transition section witha uniform section to form a working section of mechanical equipment; 4, excavating a transition section back; digging a middle step surface downwards on the horizontal plane of the transition section; 5, excavating the climbing section of the small pilot tunnel; expanding and excavating from the small pilot tunnel to the small section; and 6, excavating forwards from the variable cross section, forming a lower step surface, forming three steps, and constructing according to a three-step method. The construction time and cost are greatly reduced in variable cross section construction, and themethod can be widely applied to the field of building construction.
Owner:CCCC SECOND HARBOR ENG +1

Multifunctional hanging basket platform for building engineering wall surface design

The invention relates to a multifunctional hanging basket platform for building engineering wall surface design. The multifunctional hanging basket platform comprises a hanging support plate, hangingropes, an electric sliding block, a sliding plate, a hanging basket, supporting hanging ropes and an adjusting mechanism, the hanging ropes are arranged at the front end and the rear end of the upperside surface of the hanging support plate, the electric sliding block is installed on the middle of the left side surface of the hanging support plate, the sliding plate is installed on the left end of the electric sliding block, the hanging basket is distributed right below the sliding plate, both the front end and the rear end of the hanging basket are connected with the lower ends of the two supporting hanging ropes, the upper ends of the supporting hanging ropes are installed on the bottom of the sliding plate, an adjusting mechanism is connected between the two supporting hanging ropes atthe rear end of the hanging basket, and the adjusting mechanism is installed on the bottom of the rear end of the sliding plate. The multifunctional hanging basket platform can solve the problems that due to the long installation and disassembly period of an existing hanging basket in the early stage, the construction efficiency of a building wall surface is low, the hanging basket cannot be stably attached to the building wall surface, the stability of the building hanging basket is poor, the hanging basket cannot be quickly adjusted in angle when the hanging basket is deviated.
Owner:海南本源建筑安装工程有限公司

Device and method for supporting concrete strip of flexible formwork for tunnel laid coal conveying pipeline

The invention discloses a device and a method for supporting a concrete strip of a flexible formwork for a tunnel laid coal conveying pipeline. The device comprises the coal conveying pipeline, the flexible formwork, a concrete arch, fine earth, broken stones, anchor rods and sprayed concrete. A strip arch support comprises an anchor arch support and a bolting-wire mesh-shotcreting support, the anchor arch support structurally comprises the anchor rod, a compound arch and a flexible formwork arch, the compound arch and the flexible formwork arch are connected through the anchor rod to form a compound beam structure, bending resistance and stability of the flexible formwork arch are enhanced, the bearing capacity of the compound arch serves as an emergency capacity in design, and the bolting-wire mesh-shotcreting support structurally comprises an anchor rod, a reinforcing mesh and the sprayed concrete. Structural stability of the anchor arch support is better than that of an anchor bolt-spray support and a lining support, the support structure is high in construction speed, stable, high in strength and convenient to operate and is widely used for underground tunnel engineering, construction period is shortened, the formwork does not need to be removed, and cost is saved.
Owner:WUHAN DESIGN & RES INST OF CHINA COALTECH & ENG GROUP

A subgrade filling construction method utilizing aeolian sand

The invention relates to a subgrade filling construction method utilizing aeolian sand. The method includes 1) finishing preparatory work before construction; 2) clearing the surface of a subgrade, and rolling the subgrade surface before filling operation; 3) filling the subgrade with the aeolian sand; 4) spreading out and leveling a filler pushed and conveyed into a filling road segment, and controlling the loose laying depth by adopting a line hanging process; 5) arranging a cofferdam, digging a ponding facility in a lower wet section, arranging a water feeding pipeline and performing watering treatment; 6) performing mechanical rolling, after the subgrade is compacted, and spraying water on the surface to stabilize compaction; 7) measuring the field compaction density by adopting a cutting ring process, detecting the foundation coefficient of the subgrade, and if the field compaction density and the foundation coefficient in a detection result are unqualified, repeating the step 6)until the field compaction density and the foundation coefficient in a detection result are qualified; 8) repeating the step 3) to the step 7) until the subgrade is filled to a set standard height, and performing slope cutting; and 9) sealing and protecting the top surface and side slopes of the subgrade. The scientific and reasonable subgrade filling construction method utilizing the aeolian sandis provided and has advantages of capability of being energy saving and environmentally friendly, capability of reducing the cost, and the like.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

High-temperature anhydrite sand-free self-leveling mortar and preparation method thereof

The invention discloses high-temperature anhydrite sand-free self-leveling mortar and a preparation method thereof, the high-temperature anhydrite sand-free self-leveling mortar comprises the following components in parts by mass: 50 parts of high-temperature anhydrite, 0.05 part of fiber, 8.5-14 parts of an admixture, 19-20 parts of water and 0.75-1 part of a gypsum plastic stabilizer, and the high-temperature anhydrous gypsum is mixed-phase anhydrous gypsum prepared by heating dihydrate phosphogypsum at a high temperature, calcining and dehydrating, and the admixture is set as a cementing material for concrete meeting national standard requirements. The admixture is one or a mixture of more of Portland cement, fly ash, silicon powder, ground steel slag powder and mineral powder, the Portland cement is P.O42.5 ordinary Portland cement, the fly ash is II-grade fly ash, the silicon content of the silicon powder is greater than or equal to 90%, the ground steel slag powder is steelmaking slag ground steel slag powder, and the mineral powder is 95-grade mineral powder. According to the high-temperature anhydrite sand-free self-leveling mortar and the preparation method thereof, the high-temperature anhydrite sand-free self-leveling mortar has relatively high water resistance and high strength.
Owner:四川涅钰绿色新材料科技有限公司

MI mineral insulated armored heating cable and metal heat conduction board supporting floor heating system

The invention discloses a MI mineral insulated armored heating cable and a metal heat conduction board supporting floor heating system. The MI mineral insulated armored heating cable comprises a damp-proof layer, an insulation layer, a mirror heat reflection film layer, a metal heat conduction plate layer, a MI mineral insulated armored heating cable layer, a support mesh, a heat storage layer anda floor decoration layer which are sequentially laid from the bottom layer; the MI mineral insulated armored heating cable layer is externally connected to a power supply and the connection portion with the grafting end of the power line is a cold end; the MI mineral insulated armored heating cable layer comprises a sheath tube, an insulator, a metal alloy heating wire; the insulator is disposedinside the sheath tube, and the metal alloy heating wire is disposed inside the sheath tube. The invention fully separates the conduction of heat from the power supply access end, ensures the long service life of the heating cable and is stable in heat generation. The invention greatly shortens the traditional heating and heating time and heat conduction time, and the construction is simple, energy-saving and efficient.
Owner:翁刚峰

Form auto-lifting system and method for slip-form construction of thin-walled hollow high piers

The invention discloses a form auto-lifting system for slip-form construction of thin-walled hollow high piers; the system comprises a platform truss, a hydraulic console and a plurality of climbing poles arranged in a pier stud structural range symmetrically relative to the centers of pier studs, the top of the platform truss is provided with an F-shaped lift rack at each climbing pole, a ball jack sleeving the corresponding climbing pole is mounted on the corresponding F-shaped lift rack, the ball jacks are connected to a hydraulic system through an oil circuit, a steel form is connected to each F-shaped lift rack, the hydraulic console includes a PLC (programmable logic controller), a miniature pressure sensor is embedded in the surface of each steel form in contact with concrete, the tops of probes of the miniature pressure sensors are flush with the surfaces of the steel forms, and the miniature pressure sensors are 20-30 cm away from the lower edges of the steel forms; the miniature pressure sensors are connected to the PLC through transmission wires. The hydraulic console lifts the steel forms synchronously according to surface strength of concrete so as to automatically lift the whole slip form.
Owner:中铁十八局集团第五工程有限公司 +1

Scaffold with safety protection mechanism and building method

The invention relates to a scaffold with a safety protection mechanism. The scaffold comprises a base, wherein a supporting column is vertically arranged on the base; an outward extending rod is horizontally arranged on the supporting column; a sleeve sleeves and is in sliding connection with the outward extending rod; a first air cylinder connected with the sleeve is arranged on the outward extending rod in the length direction of the outward extending rod; two abutting rod sets used for abutting against the inner wall of a wall are arranged at the end, close to the supporting column, of theoutward extending rod in a longitudinal symmetry mode relative to the outward extending rod. The abutting rod sets comprise a plurality of abutting rods, each abutting rod is rotationally connected with the end, close to the supporting column, of the outward extending rod, a plurality of supporting rods rotationally connected with the abutting rods are rotationally connected to the sleeve in the circumferential direction, the supporting rods are used for adjusting the angle between the two abutting rod sets, and a scaffold plate is arranged at the end, away from the supporting column, of the outward extending rod. The scaffold has the effect of improving the safety of constructors in the scaffold mounting process.
Owner:鹏程建设集团有限公司

Shared construction platform for single pile and high pile cap foundation steel pipe pile planting of offshore wind power plant

The invention discloses a shared construction platform for single pile and high pile cap foundation steel pipe pile planting of an offshore wind power plant. The construction platform comprises a toplayer platform, a middle layer platform and a lower layer platform which are arranged on six auxiliary pile sleeves, and the six auxiliary pile sleeves are arranged in a regular hexagonal manner by connecting lines; the top layer platform comprises a top ring beam and two pairs of cantilever beams; the top ring beam is connected with the six auxiliary pile sleeves through six radial main beams, and the periphery of the top ring beam is provided with an inner channel main beam, a middle channel main beam and a top outer channel main beam which are all in a regular hexagon shape; the two pairs of cantilever beams are connected with the six auxiliary pile sleeves, so that the plane outer contour of the top layer platform is in a rectangular shape; the middle layer platform and the lower layerplatform are the same in structure and size, and each platform comprises a ring beam and an outer channel main beam which is in a regular hexagon shape and is connected to the six auxiliary pile sleeves; the ring beam is connected with the six auxiliary pile sleeves through six connecting beams; and the top layer platform, the middle layer platform and the lower layer platform are each provided with a single pile guiding protective cylinder and a high pile guiding truss. According to the invention, the construction platform not only can improve the verticality of the protective cylinder, butalso can reduce resource investment.
Owner:CCCC THIRD HARBOR ENG +2

Building wall surface spraying robot based on machine vision

The invention relates to the field of intelligent robots, and particularly relates to a building wall surface spraying robot based on machine vision. The building wall surface spraying robot comprisesa movable carrying table, a lifting table, a spraying mechanism, a vision detection mechanism and a uniform coating mechanism, wherein the lifting table is vertically arranged on the movable carryingtable and used for driving the spraying mechanism to do lifting motion in the vertical direction; the spraying mechanism is used for executing spraying work of a wall surface; the vision detection mechanism is arranged on the lifting table, located on the side portion of the spraying mechanism and used for controlling and switching the working modes of the spraying mechanism according to the state of the wall surface; and the uniform coating mechanism is arranged on the side portion of the spraying mechanism and used for uniformly smearing newly-sprayed paint after the spraying mechanism sprays the paint on the building wall surface. According to the building wall surface spraying robot based on machine vision, different spraying modes are adopted according to different positions of the wall surface, meanwhile, the newly-sprayed paint is uniformly smeared after the paint is sprayed on the building wall surface, and the spraying effect is better.
Owner:山东鼎安升机器人有限公司

A soil repair construction device

The invention discloses a construction device for soil remediation. The device comprises a rack and further comprises a material scattering unit and a walking unit, wherein the material scattering unit is fixedly installed on the upper portion of the rack; the walking unit is fixedly installed at the bottom of the rack; and the material scattering unit comprises an installation plate, a supportingshell, a storage bin, a connecting cylinder, a cylindrical shell, a sealing cover, a first motor, a conveying shaft, a spiral blade and three linear blades. According to the invention, a constructionarea in unit time can be effectively increased; construction efficiency is effectively improved; granular chemicals in the storage bin can be prevented from spilling out; rainwater can be prevented from entering the storage bin through a feeding hopper to soak the granular chemicals, so the problem that the granular chemicals cannot be thrown out from the interior of the cylindrical shell due tomelting can be effectively solved; the walking unit is adopted for driving the device to walk, so the labor intensity of constructors can be effectively reduced; and a prepared protective layer can prevent the situation that a large number of the granular chemicals adhere to the inner wall of the storage bin and are difficult to clean.
Owner:江苏环保产业技术研究院股份公司

Construction auxiliary platform for landscaping engineering

The invention discloses a construction auxiliary platform for landscaping engineering. The construction auxiliary platform comprises a foundation bottom plate, a cab is fixedly connected to the left side of the upper end face of the foundation bottom plate, a console is fixedly connected to the right side of the bottom of an inner cavity of the cab, a driver seat is fixedly connected to the left side of the inner cavity of the cab, vehicle doors are rotationally connected to the front side wall and the rear side wall of the cab, and the front portions of the left sides and the right sides of the vehicle doors are fixedly connected with handles. The right portion of the upper end face of the foundation bottom plate is provided with a rotating disc, a rotating piece is connected with a clamping piece in a clamped manner, the front side and the rear side of the lower end face of the foundation bottom plate are fixedly connected with motorized bins, and the middle portions of the front ends face and the rear end faces of the motorized bins are rotationally connected with wheels through axles. The invention relates to the technical field of construction auxiliary platforms. According to the construction auxiliary platform for landscaping engineering, the problems that an existing construction auxiliary platform is poor in flexibility and low in working efficiency and cannot guarantee construction safety in the using process are solved.
Owner:苏州尚雷克装饰工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products