The invention relates to the field of
oil field underground
workover treatment, in particular to a drilling and
grinding method under pressure. The problem that an existing drilling and
grinding method cannot protect stratum energy and cannot be applied to a high-pressure well is mainly solved. Comprising the following steps: S1, construction preparation; s2, drilling and
grinding parameters are determined; s3, drilling and grinding construction, wherein all part structures of a drilling tool are connected and put into a well; when the
tripping-in distance is 2-3 m away from the fish top, the drilling tool is moved up and down, and circulation is established; lowering a drilling tool while circulating, pressurizing for 1-2t of a fish finding head, and marking the depth of a tubular column on an operation table; the
pipe column is lifted by 2-3 m, the displacement is adjusted, and the
pipe column is lowered for milling while the
pipe column is rotated; the milling shoe is lifted up by 3-5 m for up-down redressing every time 1-2 m of milling is carried out; and stopping milling, lifting the drilling and grinding tool away from the well bottom, and pulling out the milling tubular column after drilling and grinding are finished. When the under-pressure drilling and grinding method is used for an abnormal high-pressure well, the stratum energy can be kept, long-term overflow and
pressure reduction are avoided, the well
repair time efficiency is improved, meanwhile, environmental
pollution is reduced, and green well repair is achieved.