The invention discloses a reinforcement structure for arch-covering-method underground excavation
subway station arch feet and a construction method. The reinforcement structure for the arch feet comprises two
layers of arch cover supports, arch foot piles distributed at the arch feet of the left and right sides of
subway station arch cover bodies and arch foot longitudinal beams, the arch foot longitudinal beams and the arch foot piles are integrally connected, and
pile bodies of the arch foot piles are distributed along the tangent line of the arch feet; each arch foot
pile is composed of asection steel framework and fine aggregate concrete which is poured into the section steel framework and
pile holes. The reinforcement structure is a reinforcement
system combining the arch foot pileswith the longitudinal beams, the longitudinal beams are connected with the arch foot piles and the first and second
layers of arch cover supports, the
structural integrity is good, the capacity of resisting local stress and deformation is high, and deep and thick smashed surrounding rock at the arch feet can be effectively reinforced and protected; in addition, according to the construction method of the reinforcement structure for the arch feet, the reinforcement range and implementation objects are flexibly selected, rock
layers of the arch feet for supporting arch covers are smashed, the integrity influence cannot be caused, and the advantages of an arch-cover method in the aspects such as project cost, construction working period, implementation efficiency and mechanical operation cannot be influenced.