Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

72results about How to "Reduce processing work" patented technology

Video monitoring platform operation and maintenance management system

The invention relates to the technical field of video monitoring, and provides a video monitoring platform operation and maintenance management system comprising a video monitoring equipment data management unit, an automatic tour inspection unit, a data analysis unit and a form generation unit. The video monitoring equipment data management unit establishes a database of video monitoring equipment normal data and fault data and audits the data and data operation. The automatic tour inspection unit completes network detection through a communication protocol and completes automatic tour inspection and fault reason reporting. The data analysis unit processes and displays the normal data, the fault data and the online data of the complete cycle of the video monitoring equipment. The form generation unit utilizes a video weekly report template to import the video monitoring data and the fault reasons so as to generate a real-time video weekly report. The operation and maintenance management work of the equipment is facilitated for the equipment operation and maintenance personnel and the corresponding form can be automatically generated so that the document processing work can be reduced, the equipment fault and the fault reasons can be timely mastered and the work efficiency can be effectively enhanced.
Owner:SOUTHERN XINJIANG ELECTRICITY SUPPLY COMPANY OF STATE GRID XINJIANG ELECTRIC POWER +1

Intelligent controller for multifunctional anti-bedsore care bed

The invention discloses an intelligent controller for a multifunctional anti-bedsore care bed, which solves the problems of poor safety, high cost, inconvenient operation and the like of the prior control device for an anti-bedsore care bed, and has the advantages of friendly human-machine interface, convenient operation, perfect error protective measures, low manufacturing cost and the like. The structure comprises that a control panel circuit performs liquid crystal display and keystroke operation treatment; a master control board circuit receives an operating command from the control panel circuit through a master control core circuit, and an output drive circuit of the master control board is connected with a relay output board circuit; a signal input circuit detects the bed body position; the relay output board circuit receives a control signal from the output drive circuit to control the motion of a motor; simultaneously, a multi-motor operation detection circuit and a multi-motor fault detection circuit send the detected operation and fault signals to the signal input circuit; and the control panel circuit exchanges information with the master control board circuit through RS485 serial communication to form a master-slave mode control structure.
Owner:ENERGY RES INST OF SHANDONG ACAD OF SCI

Hydropower station grouting centralized intelligent monitoring system

The invention discloses a hydropower station grouting centralized intelligent monitoring system which comprises a grouting recorder, a communication network and a site monitoring center or rear central management center. The hydropower station grouting centralized intelligent monitoring system is characterized in that the site monitoring center or rear central management center comprises a global system for mobile communications (GSM) module which is connected with a mobile phone of a user through a general packet radio service (GPRS) network, the grouting recorder comprises an input port, an output port and a wireless launcher, and the site monitoring center or rear central management center comprises a wireless receiving device which comprises an antenna, a wireless transport module, a data storage device and a data processor. According to the hydropower station grouting centralized intelligent monitoring system, a wireless communication method is adopted, data of multiple grouting recorders is collected in a centralized mode and is summarized and reorganized, and full monitoring of conditions of a grouting construction area is achieved. Meanwhile, the hydropower station grouting centralized intelligent monitoring system can be connected with mobile phones of a supervising engineer and other related personnel through the GPRS network, and the conditions of the grouting construction area are convenient and accurate to know.
Owner:毛振刚

3D printing additive manufacturing method of kettle-shaped thin-wall part

The invention provides a 3D printing additive manufacturing method of a kettle-shaped thin-wall part. The 3D printing additive manufacturing method of the kettle-shaped thin-wall part comprises the following steps of modeling, specifically, through three-dimensional modeling software, a solid three-dimensional model is established to enable an opening of the kettle-shaped thin-wall part to face upwards; cutting, specifically, through three-dimensional design software, cutting treatment is performed on the solid three-dimensional model to obtain cutting characteristic data; slicing, specifically, through the three-dimensional design software, the cutting characteristic data are spliced in the Z-axis direction to obtain section contour data; filling, specifically, through filling software and the section contour data, path filling is performed on a printing area to obtain laser processing parameters and generate processing information; and scanning and processing, specifically, the kettle-shaped thin-wall part is obtained by printing through the processing information. The 3D printing additive manufacturing method of the kettle-shaped thin-wall part can be used for 3D printing of a thin-wall kettle body with a complex structure, the 3D printing efficiency is improved, the number of supporting structures in the 3D printing is reduced, the generated material waste is reduced, and the later processing work is reduced.
Owner:江西宝航新材料有限公司

Ultrasonic degas method for quartz continuous melting furnace

The invention relates to an ultrasonic degas method for a quartz continuous melting furnace, which conducting the energy of an ultrasonic energy transducer to quartz melted slurry inside a crucible by an ultrasonic conducted rod. The ultrasonic conducted rod is provided with an A section and a B section; the A section is a conduit which is a hollow and is internally filled with high-temperature resistant silicon oil; the B section is a solid rod body; the inner end of the solid rod body of the B section is fixedly connected with the crucible into a whole; the outer end of the conduit of the A section is connected with the ultrasonic energy transducer; and a circulation cooling device is arranged outside the conduit of the A section. With special mechanical property and harmonic characteristic of ultrasound, the method is used to perform ultrasonic degas and ultrasonic bubble shredding and melting on bubbles of the quartz melted slurry in the quartz continuous melting furnace, thereby achieving the aim of degas. The degas method is simple and convenient, highly efficient and feasible; and the high-efficient degas mode means the reduction of the scrap rate, not only utilizes ore raw materials as much as possible and saves the cost for enterprises, but also reduces the treatment work for reducing wastes, and really embodies the production subject of saving energy and reducing emission.
Owner:HUAIHAI INST OF TECH

Cotton field soil plough layer reconstruction and matched cultivation method

The invention provides a cotton field soil plough layer reconstruction and matched cultivation method. The method comprises steps as follows: in a cotton planting area, before winter and after autumn harvest, 2-3 m<3> of organic fertilizer is applied to the cotton field soil surface per mu; a soil layer of 0-20 cm and a soil layer of 20-40 cm are exchanged by the aid of a rotary deep-tillage plough, and a soil layer of 40-60 cm is loosened; fertilizer is applied to the soil surface 7-10 days before the next cotton planting season, 15-20 kg of urea, 10-12 kg of diammonium phosphate and 20-25 kg of potassium chloride are applied per mu, irrigation is performed, and the irrigation amount per mu is 80-100 m<3>; rotary tillage, harrowing and smoothing are performed on soil in the cotton planting season, and a cotton variety with the growth period not shorter than 130 days is selected for seeding; pruning is not performed after buds appear on cotton plants, and the seedling reserving density is 3000-3200 plant/mu; irrigation is performed once between the bud stage to the initial flowering stage, and the irrigation amount is 40-50 m<3>/mu; 0.5-0.7 g of mepiquat chloride is sprayed per mu at the bud stage, 1.5-2.0 g of mepiquat chloride is sprayed per mu at the initial flowering stage, and 2.5-3.0 g of mepiquat chloride is sprayed per mu at the full-bloom stage. With the adoption of the method, physical and chemical properties of cotton field soil are improved, nutrients are balanced, and the cotton yield is increased.
Owner:COTTON RES INST HEBEI ACAD OF AGRI & FOREST SCI

Method for rapidly constructing protein mutant pichia pastoris expression library and application thereof

The invention relates to a method for rapidly constructing a protein mutant pichia pastoris expression library and application thereof, which can effectively solve the problems of rapidly constructing the protein mutant pichia pastoris expression library and realizing directional selection of required property optimization enzyme, and the method comprises the following steps: constructing a target gene into a pichia pastoris vector pGAPZalpha series vector to construct plasmids, carrying out a polymerase chain reaction to obtain a PCR product, adding saturated sodium acetate and ethanol into the PCR product, carrying out centrifugation, carrying out precipitation and drying at room temperature, adding sterile deionized water for dissolving, electrically transforming the PCR product into pichia pastoris GS115 competent cells according to a yeast transformation method, coating a YPDS culture medium plate containing bleomycin with the cells to screen positive clones, extracting yeast genome DNA, then sequencing the PCR product, calculating the base mutation rate and gene mutation rate, and realizing the rapid construction of protein mutant Pichia pastoris expression library. The method has the advantages that the method is easy to operate, the time and labor are saved, the working efficiency is high, the application range is wide, and the economic and social benefits are huge.
Owner:HENAN ACAD OF SCI INST OF BIOLOGY LIABILITY +1

Prefabricated plate beam erecting method

The invention discloses a prefabricated plate beam erecting method, and relates to the field of prefabricated plate beam installation construction. The prefabricated plate beam erecting method comprises the steps that S1, two parallel trusses are arranged on two adjacent bridge piers along the direction of a bridge, meanwhile a track used for allowing a beam-shifting trolley to walk is arranged on the top faces of the two trusses, and the beam-shifting trolley is erected on the track; S2, a beam transporting vehicle transports a prefabricated plate beam to a first position, and the prefabricated plate beam is kept to be parallel to the bridge direction; S3, the beam-shifting trolley hoists the prefabricated plate beam to be close to one end of a second position, and meanwhile the prefabricated plate beam and the beam-shifting trolley are driven to move together along the direction of the bridge till the prefabricated plate beam reaches to the second position; S4, the prefabricated plate beam is placed on the second position; and S5, a next prefabricated plate beam is transported by the beam transporting vehicle to the first position, and the step S2, the step S3 and the step S4 are circulated till construction of all prefabricated plate beams of the two adjacent bridge piers is completed. According to the prefabricated plate beam erecting method, construction is convenient, and using of large bridging hoisting equipment in the bridge erecting process is effectively reduced.
Owner:THE 2ND ENG CO LTD MBEC +1

Design method of dual-polarization orbital angular momentum state multiplexing metasurface

The invention discloses a design method of a dual-polarization orbital angular momentum state multiplexing metasurface, and belongs to the field of electromagnetism. The method specifically comprisesthe following steps of firstly, designing an anisotropic unit of a dual-polarization reflection metasurface, simulating a unit structure, and establishing a corresponding relation between the size ofthe unit structure and a reflection phase; secondly, designing a metasurface for a beam of dual-polarized electromagnetic waves, modulating incident waves into vortex electromagnetic waves, deflectingthe vortex electromagnetic waves to the direction perpendicular to the metasurface, and calculating the conditions needing to be met by the reflection phase of the metasurface; on the basis, modulating multiple beams of dual-polarized electromagnetic waves with different incident angles into vortex electromagnetic waves at the same time and deflecting to the same direction perpendicular to the metasurface, and calculating the conditions needing to be met by the reflection phase of the metasurface when the coaxial output is achieved; and finally, setting the incident directions of the multiplebeams of electromagnetic waves, and modeling in combination with the phase distribution condition of each unit of the metasurface to obtain the dual-polarization orbital angular momentum state multiplexing metasurface for verification. According to the present invention, the unit structure is simple, and functions are easy to achieve.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Analysis method of vehicle sound insulation weak position based on sound transmission testing

The invention belongs to the technical field of wheel type vehicle sound insulation performance testing, and particularly relates to an analysis method of a vehicle sound insulation weak position based on sound transmission testing, and the method comprises the following steps: step A, arranging a volume sound source in a frequency range of 30-20000HZ in an area where ears of a driver and passengers are located in a vehicle body; B, determining receiving points of all sound transmission paths outside the vehicle body according to the sound source position of the noise, and arranging receivingmicrophones at the receiving points; step C, taking the volume sound source as a reference, testing a sound transfer function ATF = Qa / p of a microphone from the interior of the vehicle to each receiving point, wherein Qa being the volume velocity of the sound source, and p being the sound pressure of the receiving point; and step D, calculating the sound insulation quantity of each receiving point according to the sound transfer function, comparing the sound insulation quantity of each receiving point according to the frequency range of the noise, and determining the receiving point with theminimum sound insulation quantity as the weak point of the sound insulation performance of the vehicle body according to a reciprocity method. According to the scheme, the problem that the weak position of the sound insulation performance of the vehicle cannot be quickly and accurately found in the prior art is solved.
Owner:CHINA AUTOMOTIVE ENG RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products