The present invention discloses a device and construction method for
saline soil roadbed in seasonal frozen soil areas, belonging to the technical field of roadbed foundation, to solve the problem that
saline soil roadbed in seasonal frozen soil areas is susceptible to
frost heave, salt heave and
dissolution, and the problem that the
cushion layer is thick and difficult to compact when the traditional roadbed gravel soil is used as a permeable
barrier layer. The device includes an earthwork roadbed, a
heat stabilization facility, and a barrier facility. The barrier facility includes a medium-coarse sand lower protective layer, a modified desert sand
barrier layer, and a medium-coarse sand upper protective layer arranged in sequence from bottom to top; the
heat stabilization facility includes a bottom roadbed stabilization facility and an upper insulation facility. The bottom roadbed stabilization facility includes a
lime soil compaction pile and a
lime soil
cushion layer arranged in sequence from bottom to top. The method includes the construction of a bottom roadbed stabilization facility, a barrier facility, an earthwork roadbed and an upper insulation facility, and a
peripheral water-
retaining wall. The present invention can maintain the long-term water, heat, and salt stability of the roadbed through the combination of structure and construction method; the cost is low, the construction process is less, and the maintenance is simple.