Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

100results about How to "The improvement effect is obvious" patented technology

Guide blade water flow measuring clamp and guide blade water flow measuring method

The invention discloses a guide blade water flow measuring clamp and a guide blade water flow measuring method. Improvements on aspects of a sealing pad, a clamp passage structure and a water inlet waterway control are made. The sealing pad is changed into a mode that a blade is integrally contained and sealed and cavity passage docking is reserved, so that effective sealing is realized and the objective of multi-passage measuring is realized; four corresponding water incoming passages are designed for a clamp corresponding to the blade according to the position of a hole of the blade to be suitable for water incoming systems of four cavities of the blade. By the guide blade water flow measuring clamp and the guide blade water flow measuring method, the four cavities of the blade can be communicated with the four water incoming passages of a measuring system simultaneously only by clamping and mounting the blade for one time, and when measuring any cavity of the blade, water flow value of the cavity can be acquired only by opening a control valve. The guide blade water flow measuring method is simple and convenient to operate and stable in data, and the guide blade water flow measuring clamp is timesaving, laborsaving and good in sealability.
Owner:AECC AVIATION POWER CO LTD

Drought-resisting and water-saving irrigation method for dry-hot valley slope garden

The invention relates to a drought-resisting and water-saving irrigation method for a dry-hot valley slope garden, belonging to the technical field of water-saving agriculture irrigation. The method comprises the step of: ditching along the row direction of the fruit trees in the garden, wherein the lengths of the ditches are the same with the lengths of each row of fruit trees, the depth of the ditches is 45-55 cm, the width of the ditches is 30-40cm, the ditches are parallel to the row direction of the fruit trees, the vertical distance between the ditches and the root parts of the trunks of the fruit trees is 50-60cm, membranes are arranged at two ends of the ditches for stopflow, straw bundles or cornstalk bundles are placed in the ditches, and the bundles are arranged 2-3cm higher than the ditch surface; measuring the water content in plough layer soil, wherein water is irrigated in the ditches when the water content of the plough layer soil is less than 30 percent, and water in the ditches permeates into the soil at the fruit tree roots to enable the water content of the plough layer soil to reach 50-60 percent; and laying a layer of straw or cornstalk on the moisture sides of the fruit trees, wherein the laying thickness is 2-5cm. The method has simple structure, simple and convenient operation, low cost, easily-obtained materials and strong adaptability and increases irrigation use ratio by 2.97 times compared with the traditional flooding.
Owner:INST OF QUALITY STANDARD & DETECTION TECH YUNNAN ACAD OF AGRI SCI

Time-lag-considering rotational-inertia compensation method suitable for wind turbine simulator

ActiveCN105673357AReproduce mechanical dynamic processSolve Oscillation ProblemsGeometric CADMachines/enginesTime lagInstability
The invention discloses an improved rotational-inertia compensation method considering a communication time lag and an acceleration time lag.The problem that when a present wind turbine simulator simulates a large-rotational-inertia wind turbine, instability and vibration occur is solved.The compensation method includes the steps that a wind turbine simulator is tested to determine the rotational inertia of the wind turbine simulator; a wind turbine model simulated by the wind turbine simulator is determined, and the rotational inertia of the wind turbine model is determined; the wind turbine simulator is tested to determine the step length of the communication time lag; a filter is added into a dynamic-torque compensation branch circuit of the wind turbine simulator according to the situation; the parameters of the digital filter are adjusted, and the wind turbine simulator stably runs.By means of the compensation method, the instability problem, caused by the communication time lag and the acceleration time lag, of the WTS is solved, the WTS can stably simulate the large-rotational-inertia wind turbine in the mode that the influence of the time lag is eliminated, and a user is assisted in conducting a control experiment of the wind turbine in the laboratory environment.
Owner:NANJING UNIV OF SCI & TECH

Cross-process callback execution method and device, equipment and storage medium

The invention discloses a cross-process callback execution method, device and equipment and a storage medium, and the method comprises the steps: responding to an interface call request, and recognizing a parameter which is correspondingly carried by a programmed annotation and represents a callback method; constructing a callback proxy object for a callback method based on the parameters, and generating callback feature information; initiating interface calling by calling an interface proxy object pre-constructed by a service process, and transmitting calling running information and callbackfeature information required by running of the interface proxy object to the service process, so the service process calls the callback proxy object through the callback feature information when running an instance object of the interface proxy object; executing callback; and responding to the interface calling request according to result data returned after the service process runs the instance object. According to the method and the device, the problem of effective and efficient calling of the callback method in cross-process communication is solved, the hardware operation efficiency duringcross-process callback is improved, and the related program development efficiency is improved.
Owner:广州方硅信息技术有限公司

Full-speed range position sensorless improvement control method of large-power hub motor

The invention discloses a full-speed range position sensorless improvement control method of a large-power hub motor, and belongs to the field of a motor control method. The full-speed range positionsensorless improvement control method comprises the following steps of S1, building an MTPA and weak flux control-based hub motor vector control system; S2, building a position sensorless identification system of an MRAS combined with position sensorless; S3, designing a variable-weight weighing switching method; S4, building a given torque-based position sensorless permanent-magnet synchronous motor vector control system; S5, building a simulation model of the position sensorless permanent-magnet synchronous motor vector control system, and performing simulation verification; S6, improving and designing the switching method; S7, testing convergence of two switching algorithms during abrupt running, and performing algorithm simulation; and S8, verifying the identification performance of the improved algorithm within a full-speed range. By switching of two position identification algorithms, the working zone of the two algorithms is reduced on the basis of ensuring identification accuracy, and software and hardware resources are saved.
Owner:ARMOR ACADEMY OF CHINESE PEOPLES LIBERATION ARMY

GNSS (global navigation satellite system) pseudo-range multi-path eliminating method based on adaptive filtering

A GNSS (global navigation satellite system) pseudo-range multi-path eliminating method based on adaptive filtering includes: based on pseudo-range observed value and carrier observed value of a receiver, acquiring a sequence of code carrier deviation adjacent epoch differential components to obtain a segmented frequency spectrum, and performing sliding window averaging to obtain a continuous spectrum; performing a discrete and adaptive abnormal spectral peak band search to obtain an abnormal spectral peak band frequency-domain range; performing interpolation on the abnormal spectral range to obtain a segmented spectrum with no abnormal peak influence; performing Fourier inversion to obtain corrected code carrier deviation adjacent epoch differential components; performing differencing to obtain a CMCD modified differential sequence, integrating to obtain a CMC modified differential sequence with un-corrected initial phase, and using an initial phase and fluctuation range to perform initial phase modification to obtain a pseudo-range with periodic multi-path eliminated. The method herein is suitable for various observation environments; abnormal spectral peaks under different environments are extracted adaptively; a pseudo-range with no periodic multi-path influence is provided for a user; the error fluctuation influence of GNSS pseudo-ranges under non-ideal observation conditions is greatly decreased.
Owner:WUHAN UNIV

Production method for selenium-enriched rice

The invention relates to a production method for selenium-enriched rice. The production method comprises the following steps: preparing a selenium-enriched organic liquid fertilizer; improving a ricefield when the rice field overwinters; applying the selenium-enriched organic liquid fertilizer to rice from breeding, raising rice seedling and planting processes for management. In the embodiment process, the rice field is improved by means of a biofertilizer formed by combining crop straws, animal feces and chitin and the selenium-enriched organic liquid fertilizer composed of organic selenium,organic matters and chitin when the rice field overwinters. The soil of a used land is conditioned to be neutral with biological bacterial manure, the improving effect of the soil is obvious, and then the selenium-enriched organic liquid fertilizer is sprayed to the land, so that a selenium-free plot is changed to selenium-enriched soil within a short time, and therefore, the phenomenon that a natural high-selenium soil resource at present is extremely scanty is overcome effectively, and selenium-enriched agricultural products are developed quickly. Meanwhile, the prepared selenium-enriched organic liquid fertilizer is low in cost, high in selenium and organic matters and obvious in using effect.
Owner:田东县合乐源农作物农民专业合作社

Axial induced velocity calculation method of rotor system inducing flow field based on finite state

The invention discloses an axial induced velocity calculation method of a rotor system inducing flow field based on a finite state, and relates to the axial induced velocity calculation method of therotor system inducing flow field. The invention aims to solve the problems that the existing calculation method is hard to pay both attentions to rapid calculation and rapid convergence at the same time. The process includes steps of firstly, acquiring coordinates of inner testing point sets of an upper space of a rotor plane under an ellipse coordinate system; secondly, setting a maximum harmonicparameter, solving corresponding matrix parameters according to the maximum harmonic parameter, and solving formulas as shown in the description according to corresponding coefficients and corresponding matrix parameters; thirdly, solving formulas as shown in the description; fourthly, solving the axial induced velocity of the induced flow field at the upper testing point of the rotor plane; fifthly, calculating the axial induced velocity of the induced flow field at the upper testing point of the rotor plane according to a reconstruction model; sixthly, calculating the axial induced velocityof the induced flow field at the upper testing point of the rotor plane according to optimized reconstruction model. The invention is applied to the field of induced velocity calculation of the rotorsystem.
Owner:HARBIN INST OF TECH

Integral ballast bed track structure for medium and low speed maglev transportation

Integral track bed track structure for medium and low speed maglev transportation to accurately realize height adjustment, distance adjustment and longitudinal telescopic adjustment at each fastener node. It includes: support adjustment units arranged at intervals along the extension direction of the track beam, each support adjustment unit includes a left reinforced concrete connector, a right reinforced concrete connector, and a steel truss and a long steel bar connecting them as a whole; the integral track The bed slab is integrated with the track beam through the connecting structure; the angle steel member and the supporting steel plate are detachably installed on the outer side of the left reinforced concrete connector and the right reinforced concrete connector through the high-strength bolts fixed at both ends of the full-length steel bar , the F-shaped rail is fixedly installed on the top plate of the angle steel member through a fastener system; the side plate of the angle steel member is provided with a side plate oblong hole corresponding to the position of the full-length steel bar, and the side plate oblong hole extends vertically. The top plate of the angle steel member The top plate is separated with long round holes, and the top plate long holes extend along the line direction.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products