The invention discloses a method for constructing soil of a plough layer on a coarse sand earth surface by heavy metal polluted sediment. The method comprises the following steps of step 1), loosening the coarse sand surface to be regulated, and levelling the ground; step 2), laying the heavy metal polluted sediment on the coarse sand surface; step 3), sprinkling stabilizers on the heavy metal polluted sediment; step 4), performing rotary tillage for the first time; step 5), performing dry-wet alternating treatment for 15 days, and exposing to the sun for 7 days, and then performing rotary tillage for the second time, wherein the rotary tillage direction is opposite to that of the second time; after rotary tillage, the water mass fraction of a mixture of the sediment, the coarse sand and the stabilizers is naturally reduced to be 25-30%, performing alternating treatment and rotary tillage for the third time, wherein the rotary tillage direction is vertical to that of the second time; step 6), after performing rotary tillage for the third time, planting leguminous green manure for one crop, performing rotary tillage for the fourth time and returning the green manure to the field, and after two months, obtaining the soil of the plough layer. The heavy metal stabilization effect of the soil of the plough layer obtained by the method is obvious, and the heavy metal content of the planted vegetable crops conforms to the national standard.