The invention relates to an
offshore wind power digital twin test
pile test
system and an establishment method, the
offshore wind power digital twin test
pile test
system comprises a loading mechanism, a
data acquisition mechanism, a calculation and analysis platform and a digital twin model, the
data acquisition mechanism is connected with the loading mechanism, and the calculation and analysis platform is connected with a jack of the loading mechanism and the
data acquisition mechanism to form an on-site test
pile test
system, the digital twinborn model is a numerical
simulation model constructed based on an on-site pile test system,
model parameters are updated in real time by adopting on-site pile
test data, and the digital twinborn model is established and operated on a
computational analysis platform. High-precision design of an
offshore wind power pile foundation structure is facilitated, a method is provided for understanding a stress
deformation mechanism of a large-
diameter or super-large-
diameter pile body under the complex load working condition, meanwhile, stress
visualization of soil around the pile and real-time analysis of stress deformation of the pile body are achieved based on numerical
simulation of a digital twinborn model, and an existing offshore
wind power pile foundation design method can be evaluated, checked and corrected.