The invention relates to an 
offshore wind power digital twin test 
pile test 
system and an establishment method, the 
offshore wind power digital twin test 
pile test 
system comprises a loading mechanism, a 
data acquisition mechanism, a calculation and analysis platform and a digital twin model, the 
data acquisition mechanism is connected with the loading mechanism, and the calculation and analysis platform is connected with a jack of the loading mechanism and the 
data acquisition mechanism to form an on-site test 
pile test 
system, the digital twinborn model is a numerical 
simulation model constructed based on an on-site pile test system, 
model parameters are updated in real time by adopting on-site pile 
test data, and the digital twinborn model is established and operated on a 
computational analysis platform. High-precision design of an 
offshore wind power pile foundation structure is facilitated, a method is provided for understanding a stress 
deformation mechanism of a large-
diameter or super-large-
diameter pile body under the complex load working condition, meanwhile, stress 
visualization of soil around the pile and real-time analysis of stress deformation of the pile body are achieved based on numerical 
simulation of a digital twinborn model, and an existing offshore 
wind power pile foundation design method can be evaluated, checked and corrected.