The present application relates to a kind of
lime-
soil compaction pile construction
system for collapsible
loess area, before construction, good technology, material, equipment and site preparation, such as familiar drawing, prepare soil and
lime, debug hole and ramming equipment, level site and surveying and setting out etc..During construction, first carry out test
pile to determine parameters, large-scale hole formation follows specific sequence and strictly controls
pile diameter, perpendicularity etc.;
Pile formation first clean bottom ram, then layered packing ramming, accurate operation by
control system;After pile formation, do well maintenance.Quality detection uses low-strain dynamic penetration method to detect pile integrity, plate load test to detect composite foundation
bearing capacity.The method is applied to a certain commercial complex project, construction is smooth, hole formation and pile formation quality meet the standards, efficiency is improved, construction period is shortened.