The application discloses a self-elevating drilling platform
wharf pile driving positioning design method, comprising the following steps: S1, platform construction, before the platform is launched, an independent reference coordinate
system is established on the platform, a point on the X axis is determined as a direction point of the platform, and measurement data is obtained through a
measuring instrument; S2, according to the measured measurement data, a shape file of the platform is established by using navigation
software, and the origin of the reference coordinate
system, the direction point and the position of the three-
station pile are marked on the shape file; S3, the position of the designed three-
station pile is marked on the established CAD diagram, the design positions of the origin and the direction point are calculated, and a direction mark is made by connecting lines, so as to serve as a positioning background diagram; and S4, the navigation
software is used to establish a plan
survey line with the calculated positions of the origin and the direction point as the starting point and the ending point. The application solves the problem that the positioning error affects the later
engineering construction.