The invention discloses a construction method of a vibrating dense macroporous
pervious concrete pavement. The construction method comprises the following construction steps that: S1, construction isprepared, namely materials are prepared, and concrete equipment and a mold frame for pavement laying are constructed; S2, formworks are installed on the construction pavement, the formworks define a long-strip-shaped rectangular shape, meanwhile, stirring is conducted to manufacture concrete, concrete raw materials are poured into the formworks, and the concrete is paved; S3, sandstone spreading is conducted, even spreading is conducted, a
vibration motor on the outer side of the formwork is used in cooperation, manual secondary sandstone spreading is conducted, 2 kg / m<2> of sandstone is adopted, and
surface finishing and calendaring are conducted through a
slurry extracting
machine; S4, leveling
machining is conducted, and face pressing treatment is conducted; S5, after the strength of the concrete reaches 100%, ground
polishing and curing and brightening treatment are conducted; and S6, form removal is conducted, joint
cutting machining is conducted, then cleaning and maintenance areconducted, and
machining is completed. In the concrete paving process, sand and stone are thrown for the second time and permeate into concrete, gaps are generated,
water seepage is facilitated, theconstruction process is simple, the construction speed is high, and the efficiency is high.