The invention belongs to the field of soft soil foundation treatment, and relates to a biological
cement reinforced roadbed on an under-consolidation
silt blowing foundation and a construction method.Grille gravel piles in the roadbed penetrate through the under-consolidation
silt blowing foundation and are embedded into a lower horizontal bearing layer. A plastic drainage plate is driven into the under-consolidation
silt blowing foundation. A biological
cement-grille reinforced
cushion layer is flatly paved on the upper surface of the grille gravel piles. Non-woven geotextiles are laid on the upper surface and the lower surface of the biological
cement-grille reinforced
cushion layer. The non-woven geotextiles and a sealing film are sealed at the bottom of a tamped clay sealing
ditch. Roadbed filling soil is packed on the upper surface of the biological cement-grille reinforced
cushion layer and on the non-woven
geotextile. Biological waterproof
layers are arranged on the upper surface and the side surface of the roadbed filling soil. A soil layer is arranged on the biological waterproof layer on the roadbed side face, and slope protection
vegetation is planted to form a roadbedslope ecological waterproof
protection layer. The roadbed has the advantages of being reasonable in structure, high in
bearing capacity, short in construction period,
environmentally friendly and thelike, and is a green ecological structure worthy of popularization.