Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

43results about How to "Meet the needs of engineering construction" patented technology

Method for treating soft foundation

ActiveCN101831903AReduced bound waterSolve the problem that the water content is difficult to be lower than the critical point of 35%Soil preservationThermal energyVacuum pumping
The invention relates to a method for treating a soft foundation. The method comprises the following steps of: 1, inserting electrical bars into treated soft soil; 2, reserving vertical drainage channels in the treated soft soil and communicating the vertical drainage channels with vacuum-pumping equipment; and 3, starting up the electrical bars to heat the treated soft soil and simultaneously starting up the vacuum-pumping equipment to vacuumize for quickening the drainage of bound water of the treated soft soil. The invention also relates to another method for treating the soft foundation. The method is implemented by arranging the electrical bars in sand drains. Due to the adoption of the method, the bound water in the soft soil can be gasified so that the bound water is quickly drained out of the soft soil, and the difficult problem that the water content of the soft soil is difficult to be lower than the critical point of 35 percent is solved. The method effectively reduces the bound water of the soft soil, realizes controllable improvement of mechanical properties of the soft soil, and meets the requirements of engineering construction by controlling heat energy and heating time. Due to the adoption of the technical scheme of the method, the time limit for a project can be shortened by over 50 percent, the construction cost can be saved by over 30 percent, the quality can be greatly improved, and the construction is environmentally protective.
Owner:SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG CO LTD

Method for identifying and assessing needle-like ferrite pipe line steel tissues

ActiveCN101949810ASolve the difficulties that are difficult to analyze and identifyIncrease contrastPreparing sample for investigationMaterial analysis by optical meansQuality controlNational standard
The invention relates to a method for identifying and assessing needle-like ferrite pipe line steel tissues, which comprises the following steps: simplifying various ferrite tissues into ferrite and bainite; and by a heat dyeing experiment, enabling the different tissues and crystalline grains in the material to display the different contrast from white to yellow and brown, wherein the assessing of the needle-like ferrite pipe line steel banded tissue is divided into four levels. The measuring method for the ferrite crystalline grains of the needle-like ferrite pipe line steel comprises: a comparative method and a resection method are selected for the judging method of the ferrite crystalline grains; the comparative method is used for production inspection, if dispute exists, the resection method is the arbitration method; the comparative method is as follows: judging the grain size rank by comparing with a standard rating graph; and the resection method is as follows: assessing the grain size rank by counting the measureing segment of given length and number of the points of the grain boundary resection. The invention solves the problem that practical steel rolling tissue is difficult to analyze and identify, improves the contrast difference of phase and grain of components in the tissue, is convenient for tissue identifying and pipe line steel grain size assessing, makes up the defect of the national standard, and has reasonable and feasible quality control, check and evaluation on the line steel tissue.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Hydraulic walking pushing system pump stations

The invention discloses hydraulic walking pushing system pump stations. A main control center comprises a jacking, pushing and rectifying displacement standard setting unit, a jacking, pushing and rectifying real-time displacement data input receiving unit, a jacking, pushing and rectifying control unit, a jacking, pushing and rectifying executing unit and a PLC automatic control unit, wherein the jacking, pushing and rectifying displacement standard setting unit is used for inputting the displacement standard set values of jacking, pushing and rectifying; and the jacking, pushing and rectifying real-time displacement data input receiving unit is used for receiving real-time displacement data of jacking, pushing and rectifying. The hydraulic walking pushing system pump station has the advantages that the multiple pushing units are subjected to three-dimensional control through one main control system so as to achieve continuous and synchronous working, the control precision is high, and the manpower cost is reduced; the expandability and the universality are high, the pushing units can be increased or decreased by increasing or decreasing the pump stations and jacks, and accordingly the requirements for construction of engineering of different spans and different tonnages are met; components do not need to be temporarily reinforced, equipment can operate till construction is completed after being installed in one time and does not need to be disassembled halfway due to the fact the length of a steel strand is not enough, and the bridge building cost can be reduced; and a dynamic rectifying function is achieved, and the defect that the equipment only can move forwards while cannot move backwards in a common traction mode is overcome.
Owner:LIUZHOU QIAN BRIDGE ENG MATERIALS

Prefabricated part composite cement soil wall and construction method thereof

ActiveCN101666085AReduce dosageGood cross-section mechanical propertiesBulkheads/pilesMaterials scienceCement
The invention relates to the field of a novel space enclosing structure in a design and construction method of deep foundation, in particular to a prefabricated part composite cement soil wall and a construction method thereof. The prefabricated part composite cement soil wall comprises a plurality of cement soil piles which are internally provided with cement soil; the adjoining cement soil pilesare occluded with each other; and each cement soil pile is internally inserted with a strip-shaped prefabricated part. The construction method of the prefabricated part composite cement soil wall comprises the following steps of: locating and setting lines; excavating guide ways; setting drillers; locating the drillers and constructing the cement soil piles; setting locating frames for the piles;and inserting the prefabricated parts. The invention effectively reduces the construction cost on the basis of meeting the force requirement of the space enclosing structure of trenches and guaranteeing the security. The invention belongs to a novel space enclosing structure form with low cost, less environmental impact, safety and high efficiency, and can perfect the space enclosing structure form in the field of underground construction, so as to further meet the requirement of engineering construction.
Owner:SHANGHAI CONSTRUCTION GROUP

System and method of flocculation combined with vacuum preloading for treatment of blown fill foundation

The invention discloses a flocculation combined vacuum prepressing system for treating blow-filled soil foundation, which comprises a treatment area, a vertical drainage plate, a transverse drainage plate and a vacuum pump, wherein the vertical drainage plate and the transverse drainage plate are respectively connected with the vacuum pump through a drainage pipe, the processing area covered withgeomembrane and geotextile. A stirring device is arranged on one side of the processing area, comprising a tank body, wherein the upper end is provided with an inlet, the lower end is provided with aconveying pipe, a conveying pump is arranged on the conveying pipe, the first motor is arranged at the upper end of one side of the tank body, the second motor is arranged at the lower end of the other side of the tank body, a first rotating shaft connected with a first motor and a second rotating shaft connected with a second motor are arranged in the tank body, an electric push rod is arranged at the lower part of the first rotating shaft, the second rotating shaft and the electric push rod are both provided with stirring rods. The system enables a mixture to be stirred more uniformly. The invention also discloses a method for treating the filling soil foundation by combining flocculation and vacuum prepressing.
Owner:WENZHOU UNIVERSITY

Walking pushing system

The invention discloses a walking pushing system. A power device comprises a plurality of hydraulic pump station single bodies. Each hydraulic pump station single body is provided with a unit radial plunger pump capable of achieving multi-port and multi-pressure output, and each hydraulic pump station controls at least two pushing units. A main control center sends a command to each hydraulic pump station single body and controls each hydraulic pump station to work. Each pushing unit comprises a lifting device and a pushing device, wherein a lifting jack is fixed to the lifting device, and the upper portion of the lifting jack and a spherical plate are connected into a spherical concave-convex groove connection structure or an arc-shaped concave-convex groove connection structure. The walking pushing system has the advantages that continuous and synchronous working is achieved by achieving three-dimensional control over the multiple pushing units through one main control system, the control precision is high, the labor intensity is relieved, and the labor cost is reduced; the structure is compact and simple, disassembly and assembly are easy, the cost is low, and the working space is small; equipment does not need to be dismounted till the work is completed after being mounted once, and the defect that only advancing can be achieved and retreating cannot be achieved by a conventional pulling way is overcome; and a dynamic deviation correcting function is achieved, and deviation correction can be conducted in time in the advancing process.
Owner:GUIZHOU ROAD & BRIDGE GRP +1

Method for reinforcing dredger fill by sealing and vacuumizing secondary overlaid clay

The invention discloses a method for reinforcing dredger fill by sealing and vacuumizing secondary overlaid clay. The method comprises the following steps that: a drain board is directly hit into a dredger fill foundation, wherein the upper end of the drain board is close to a mud surface of the dredger fill; the drain board is connected with a vacuumizing hose by a quick joint, and the drain board is hit again till the quick joint is hit below the mud surface by 60cm to 80cm; a vacuumizing system and a water collecting pipe system are arranged by taking the mud surface of the dredger fill above the quick joint as a primary sealing layer, and then the primary sealing layer is reinforced by being pre-pressed and vacuumized at a stable vacuum degree; and when the vacuum degree decreases, and the primary sealing layer is subjected to cracking and gas leakage, a mud layer as high as 60cm to 80cm is formed by filling a cofferdam in a reinforced area and then is taken as a secondary sealing layer, and the secondary sealing layer is filled and reinforced by being pre-pressed by vacuum till the secondary sealing layer is reinforced to reach a design standard. The method has the advantages of being simple in construction, being capable of being directly used for reinforcing dredger fill which is formed by reclamation projects and almost has no bearing capacity, and being capable of saving construction funds.
Owner:TIANJIN UNIV

Column-pile combined cover nut and use method thereof

The invention relates to a column-pile combined cover nut and a use method thereof. The column-pile combined cover nut is formed by splicing at least two cover nut valve bodies, wherein each valve body is composed of an arc-shaped sleeve body, a fan-shaped sleeve cover connected with the upper side of the arc-shaped sleeve body, and an upper raised head connected with the center of the fan-shaped sleeve cover, a pin hole is formed on the arc-shaped sleeve body and is matched with a locating pin at a metal cap of the top of a prestress pipe pile. The column-pile combined cover nut further comprises at least one arc-shaped hoop sleeved outside the arc-shaped sleeve bodies of the cover nut valve body, so as to hoop the cover nut valve bodies together; and anti-slip barrier strips are also arranged outside the arc-shaped sleeve bodies to limit the arc-shaped hoops. The column-pile combined cover nut also comprises a head frame which is used for binding the upper raised heads of the cover nut valve bodies together and is locked on the fan-shaped sleeve covers through fastening bolts; and each fan-shaped sleeve cover is provided with a locking device connected with a steel column. The column-pile combined cover nut can make the best of the prestress pipe pile, so as to achieve the purpose of one pile with two functions, and realizes the purposes of shortening construction period, reducing construction cost and improving social benefit.
Owner:福州市第三建筑工程公司

Pipeline material cloud elastic cutting, labeling and processing automatic guidance system and method

InactiveCN105528673AImprove energy efficiencyTowards professional material preparation needsResourcesMaterials preparationAutomatic guidance
The present invention discloses a pipeline material cloud elastic cutting, labeling and processing automatic guidance system and method, belonging to the technical field of project material preparation and especially the pipeline project material preparation optimization system and method. Based on the operation requirements of flexible, customized, recognized and guided project application material use, the cloud operation processing novel mode of project material preparation is established, especially for the elastic pipeline, elastic cutting label and processing operation requirements, a new automatic guide system is established, the material preparation processing operation is facilitated, and the pipeline material preparation requirement is satisfied. According to the system, a material preparation information guide can be provided for material preparation staff to be clear about operation information, a control process is checked through a system operation, the material preparation task certainty is ensured, the production is in accordance with the automatic guide application function material use of a work application requirement, the project application requirement is satisfied, the projection material use management and application material control blind point is solved, and the application efficiency is improved.
Owner:巫协森

Cast-in-place externally prestressed concrete-filled steel pipe pile and construction method thereof and support pile wall

The invention discloses a cast-in-place externally prestressed concrete-filled steel pipe pile, which comprises a steel pipe, a concrete layer cast-in-place in the steel pipe and multiple prestressed tendons arranged on the steel pipe, wherein the prestressed tendons are arranged along the direction of the axis of the steel pipe, and comprise top sections, middle sections and bottom sections; the middle sections are positioned outside the steel pipe; the top sections and the bottom sections penetrate through the wall of the steel pipe and enter into the steel pipe; the upper end of the steel pipe is opened, and the bottom end of the steel pipe is provided with a sealed structure. The invention also provides a construction method of the concrete-filled steel pipe pile and a support pile wall with the concrete-filled steel pipe pile. In the way, the external prestressing technology is adopted by the cast-in-place externally prestressed concrete-filled steel pipe pile, a pile body can be restrained better, the tensile resistance is provided, and deformation of the support pile wall in the excavation process of a foundation pit is effectively limited; in addition, field fabrication can be performed, transport costs are reduced, on the premise of guaranteeing safety and reliability of a foundation pit support, the cost is reduced, the construction period is shortened, and construction is convenient.
Owner:JIANGSU DINGDA BUILDING NEW TECH +1

Method for treating soft foundation

The invention relates to a method for treating a soft foundation. The method comprises the following steps of: 1, inserting electrical bars into treated soft soil; 2, reserving vertical drainage channels in the treated soft soil and communicating the vertical drainage channels with vacuum-pumping equipment; and 3, starting up the electrical bars to heat the treated soft soil and simultaneously starting up the vacuum-pumping equipment to vacuumize for quickening the drainage of bound water of the treated soft soil. The invention also relates to another method for treating the soft foundation. The method is implemented by arranging the electrical bars in sand drains. Due to the adoption of the method, the bound water in the soft soil can be gasified so that the bound water is quickly drained out of the soft soil, and the difficult problem that the water content of the soft soil is difficult to be lower than the critical point of 35 percent is solved. The method effectively reduces the bound water of the soft soil, realizes controllable improvement of mechanical properties of the soft soil, and meets the requirements of engineering construction by controlling heat energy and heating time. Due to the adoption of the technical scheme of the method, the time limit for a project can be shortened by over 50 percent, the construction cost can be saved by over 30 percent, the quality can be greatly improved, and the construction is environmentally protective.
Owner:SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG CO LTD

Construction load detection method and system for aluminum alloy formwork assembling system

The invention belongs to the technical field of buildings, and discloses a construction load detection method and system for an aluminum alloy formwork assembly system, and the method comprises the steps: determining a construction load parameter value of the aluminum alloy formwork assembly system; calculating a concrete side pressure load; calculating a floor plate load value; calculating and checking an aluminum alloy template; performing floor and beam aluminum alloy formwork calculation and checking through floor and beam aluminum alloy formwork overall strength and rigidity checking, local rib plate and panel strength and rigidity checking, floor main keel strength and rigidity checking and floor main keel pull rod strength checking; calculating an aluminum alloy template support system and a material distributor equivalent support; and judging whether the standard is met, and if so, passing the detection. The construction load of the aluminum alloy formwork assembly system can be effectively detected, it is ensured that the strength and rigidity of related formworks meet the standard requirements, the safety of formwork engineering is improved, operation errors are avoided,and the popularization of the formwork system is better facilitated.
Owner:中电建路桥集团有限公司

Full-prefabricated assembled structure bridge suitable for grassland wetlands and construction method thereof

The invention discloses a full-prefabricated assembled structure bridge suitable for grassland wetlands and a construction method thereof; the full-prefabricated assembled structure bridge includes anumber of precast capping beams, wherein a plurality of linearly distributed notches are formed in the precast capping beams, two inserting holes are formed in each notch, the axes of the two inserting holes are respectively inclined towards two opposite outer sides of the precast capping beam from top to bottom, a matched prefabricated pipe pile is inserted into each inserting hole, and the top ends of the prefabricated pipe piles and the corresponding inserting holes are fixed through cast-in-place concrete; an upper structure is laid on every two adjacent precast capping beams and is a small prefabricated box beam or a prefabricated superposed beam. The assembled structure bridge and the construction method are used for solving the problems that in the prior art, an annual effective construction period of an grassland wetland area is short, the seismic intensity is high, the ecology is fragile and the like, and construction of a traffic network is restricted; the purposes of avoiding pollution of a traditional pile hole filling pile foundation to an underground water system and reducing the influence on the grassland wetland ecological environment with a high environmental sensitivity are achieved.
Owner:四川省交通勘察设计研究院有限公司

Foundation pit supporting structure and construction method

The invention belongs to the technical field of building engineering construction, and discloses a foundation pit supporting structure and a construction method, and the foundation pit supporting structure comprises an underground diaphragm wall and an MJS construction method cutoff wall. The underground diaphragm wall extends in the circumferential direction of the foundation pit. The MJS construction method cutoff wall extends in the extending direction of the underground diaphragm wall, the top end of the MJS construction method cutoff wall is in waterproof sealing connection with the bottom end of the underground diaphragm wall, and the MJS construction method cutoff wall is used for cutting off a confined water layer. When the length of a reinforcement cage or the height of a crane cannot meet the requirement due to the limitation of a construction site, and the depth of the underground diaphragm wall cannot meet the requirement for separating the confined water layer, the MJS construction method cutoff wall is spliced below the underground diaphragm wall and extends in the extending direction of the underground diaphragm wall, and the MJS construction method cutoff wall is spliced below the underground diaphragm wall. The top end of the MJS construction method cutoff wall is in waterproof sealing connection with the bottom end of the underground diaphragm wall, so that the MJS construction method cutoff wall is matched with the underground diaphragm wall to cut off the confined aquifer, and the engineering construction requirement is met.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Assembly gravity type retaining wall structure and construction method thereof

The invention discloses an assembly gravity type retaining wall structure and a construction method thereof. The technical problems that a traditional gravity type retaining wall is large in structuresize, long in cast-in-place and maintenance time, and construction quality cannot guarantee are solved, and the requirement for construction of railway subgrade engineering in a plateau mountainous area is met. The structure involves a foundation and a gravity type retaining wall body located on the foundation, the gravity type retaining wall body is composed of an assembly type wall body and a backfill material filling an inner cavity of the assembly type wall body, the assembly type wall body is formed by vertically assembling a multiple layers of splicing unit, each layer of splicing unitcomprises framework plates which are arranged at intervals in the line direction and soil retaining plates which are front-back arranged at intervals in the vertical line direction, the framework plates and the soil retaining plates are connected to form a continuous box body through clamping grooves, the every two adjacent layers of splicing units are connected through the clamping grooves in theframework plates and the soil retaining plates, and the bottom of the lowermost splicing unit is fixedly connected with the foundation.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products