A construction method for water-cutoff-free maintenance of
aqueduct connecting seams includes the steps that an
enclosure device is installed on an
aqueduct for sealing, the
enclosure device covers over half of the width of the
aqueduct on a projection surface, a construction area in the
enclosure device is cleaned, the connecting seams are
cut, chiseled and washed, then
water stop belt replacement, concrete backfilling and connecting seam filling and sealing are carried out, and the operation is repeated on the other side of the aqueduct. The enclosure device only cuts off the construction area of the aqueduct connecting seams and does not influence the smoothness of
water flow in the aqueduct; the connecting seams are dug, internal
water stop belts are replaced, a PTN
sealant is reliablein connection and sealing, and the service life is greatly prolonged. The aqueduct connecting seams are constructed section by section, the continuity of the
water stop belts in the connection seamsis guaranteed, the leakage problem of connecting points is avoided, and the service life can be guaranteed just by ensuring the
corrosion resistance of the water stop belts.