The utility model relates to an operation
system for constructing a preformed hole stiffening core composite
pile. The operation
system comprises drilling equipment, a circulating
slurry pump, a
slurry conveying
pipe, a crane and at least two circulating pools. The drilling equipment is used for drilling preformed holes, the circulating
slurry pump can rotate forwards and reversely, and the circulating
slurry pump communicates with a
drill rod of the drilling equipment; the at least two circulating pools are sequentially communicated, the first circulating
pool in the at least two circulating pools is a head-end circulating
pool, and the last circulating
pool is a
tail-end circulating pool; the first end of the slurry conveying
pipe is connected with the circulating
slurry pump, the second end of the slurry conveying
pipe can be communicated with any one of the at least two circulating pools, and a discharging opening is formed in the head-end circulating pool and used for being communicated with a preformed hole; the crane is used for hoisting the prefabricated core
pile. The operation
system has the advantages that waste mud and
muck generated in the hole forming process of preformed holes can be effectively recycled, and the operation system can be suitable for preformed hole stiffening core composite
pile construction in soft soil areas and areas with thick and hard clay
layers or rock stratums at the same time.