Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11results about How to "Solve transportation difficulties" patented technology

Ventilation device for coal mine tunneling roadway

ActiveCN222526340USolve transportation difficultieseasy to useDust removalFire preventionWater savingMechanical engineering
The ventilation device comprises a base, a ventilation box and a first water pump, the ventilation box is fixedly connected to the top of the base, the first water pump is fixedly connected to the top of the ventilation box, the top of the base is further fixedly connected with a water treatment box, and the top of the water treatment box is fixedly connected with a second water pump. A replacement door is arranged on the side face of the water treatment tank, a water pumping cavity is formed in the water treatment tank and is separated from the water treatment tank through a sealing plate, a filter screen and a filter element are sequentially arranged in the water treatment tank from top to bottom, and the output end of the second water pump extends into the water treatment tank. The input end of the second water pump is connected with a filtering ball through a pipeline, the input end of the first water pump extends into the water pumping cavity through a pipeline, underground waste water can be effectively utilized for spraying and purifying underground air, use is convenient, and more water saving and environmental protection are achieved.
Owner:NINGXIA CHONGLI MASCH MFG CO LTD

Water plugging device for heading machine and heading machine

ActiveCN116517561BEasy to move forwardExtended service lifeTunnelsWater useWater flow
This invention provides a water-blocking device for a tunneling machine and a tunneling machine in the field of tunneling equipment technology. The water-blocking device for the tunneling machine includes a fixing member for fixing to the bottom of the shield body. A sealing member for sealing the gap between the bottom of the shield body and the tunnel wall is installed on the fixing member. The sealing member has a contact surface for contacting the tunnel wall. The water-blocking device also includes a control structure connected to the sealing member to control the contact surface's contact or detachment from the tunnel wall. The contact surface of the sealing member can seal the gap between the bottom of the shield body and the tunnel wall, preventing water from seeping into the tunnel, flowing water behind the tunnel, or water used for construction from flowing to the front of the shield body and mixing with the excavated rock. This prevents the excavated rock transported to the conveyor belt from having excessive moisture content, causing transportation difficulties and ensuring the normal excavation function of the conveyor belt. Excavation is not required by manual assistance, saving manpower and time. The contact surface of the sealing member can also detach from the tunnel wall, facilitating the tunneling machine's forward movement and avoiding excessive friction that could affect its service life.
Owner:CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD

A latch sleeve advance positioning method and advance positioning device

The application discloses a latch sleeve advance positioning method and advance positioning device, which comprises the following steps: designing an upper beam, marking the longitudinal center line and the transverse center line of the upper beam, assembling a latch support on both sides of the bottom of the upper beam, assembling a pair of upper pads at the bottom end of the upper beam, marking the longitudinal center line and the transverse center line of the latch support, locating the center of the latch hole of the latch support on the longitudinal center line, boring the latch hole of the latch support, placing the upper beam and the latch support assembly on the upper cover plate of the machine arm, installing the processed latch sleeve at the front end of the latch, and pushing the latch so that the latch sleeve is just pushed into the ear beam hole on the machine arm. According to the application, the processed latch sleeve is pushed into the ear beam holes on both sides of the machine arm along the installation path of the bridge crane support leg to be installed according to the upper beam and the latch support, and then is positioned and welded, so that the workload of welding and then processing the latch sleeve is reduced, and the coaxiality of the latch sleeves on both sides of the ear beam is further ensured.
Owner:JULI SLING STOCK CO LTD

Electric platform cart for transporting building blocks in construction site

The utility model relates to the technical field of building equipment, in particular to an electric platform cart for transporting building blocks in a construction site. The electric flat cart for transporting building blocks in the construction site comprises a cart body, wheels, a driving device, a starting mechanism and a braking mechanism, the vehicle body comprises a vehicle frame, a left handle and a right handle; the wheels are rotatably arranged on the frame, and the driving device is in transmission connection with the wheels; the starting mechanism is electrically connected with the driving device; the starting mechanism is arranged on the right handle, and the starting mechanism is controlled by rotating the right handle to enable the driving device to drive the wheels to rotate so as to drive the vehicle body to advance or retreat; the brake mechanism is connected with the wheels; the braking mechanism is arranged on the left handle, and the left handle is rotated to control the braking mechanism so that the wheels can stop rotating, and braking of the vehicle body is achieved. In this way, the building blocks can be easily excavated and transported, time and labor are saved, and operation is convenient.
Owner:POWERCHINA CHONGQING ENG CO LTD

Construction method for overflowing surface lining mirror surface concrete of complex high-flow-rate flood discharge tunnel

The invention discloses a complex-body-type high-flow-speed flood discharge tunnel overflowing face lining mirror surface concrete construction method, and relates to the technical field of concrete construction technologies, and the method comprises the steps of manufacturability testing, shape automatic deformation formwork machining, measuring and point placing, steel bar manufacturing and installing, embedded part construction, concrete warehousing and pouring. 5 times of process tests and 4 times of simulation are carried out on site, a composite steel formwork formed by compounding a steel plate with the thickness of 10 mm and a stainless steel plate with the thickness of 2 mm is adopted for pouring concrete on the side wall of the flood discharging tunnel, and the concrete construction parameters are as follows: the mark number is C9040W8F150, the slump is 70-90 mm, loose laying is 0.45 m, initial vibration is 60 s, compound vibration is 45 s, and the interval is 20 min. Through a mirror concrete manufacturability test, accurate, flat, smooth and defect-free construction of the concrete body is realized, and the problem that the surface of the concrete is abraded and damaged by extremely fast water flow in a high-flow-rate flood discharge tunnel is solved; and a complete set of mirror surface concrete construction methods such as high side wall compound vibration, bottom plate five-step fine surface finishing, curved surface bottom plate circulating rollover and seamless connection of construction joints are created.
Owner:CHINA ENENG GRP THIRD ENG BUREAU CO LTD +1

Device and method for strengthening lower tower liquid conveying by utilizing air extractor and air separation equipment

PendingCN121953237AImprove start-up efficiencyGuaranteed uptimePipeline systemsProcess engineeringAir separation
The invention relates to a device and method for strengthening lower tower liquid conveying through an air extractor and air separation equipment. The vacuum generator unit is configured to be connected with a liquid outlet pipeline of a lower tower of the air separation equipment; the vacuum generator unit comprises a Venturi ejector and a hot gas introduction valve; the venturi ejector comprises a contraction section, a throat pipe section and a diffusion section which are communicated in sequence; the contraction section is configured to be communicated with a lower tower liquid outlet pipeline and is used for inputting lower tower liquid; the throat pipe section is communicated with the hot gas leading-in valve and is used for inputting hot gas through the hot gas leading-in valve; the diffusion section is communicated with the liquid conveying main pipeline, and the liquid conveying main pipeline is configured to be communicated with the upper tower feeding hole. Local vacuum is formed through hot gas injection, the resistance of a conveying pipeline is reduced while partial vaporization of liquid is achieved, efficient enhancement of liquid conveying of the lower tower of the air separation equipment is achieved, the problem that liquid is difficult to convey to the upper tower when the working pressure of the lower tower is low in the air separation start-up and operation process is solved, and application and popularization are facilitated.
Owner:XINJIANG ZHUNENG CHEMICAL CO LTD

Large-width gallery bridge unit capable of being disassembled and packaged and construction method of large-width gallery bridge unit

The invention discloses a large-width gallery bridge unit capable of being disassembled and packaged and a construction method thereof.The large-width gallery bridge unit comprises a roof unit, a ground unit, stand columns and curtain wall units, the roof unit comprises two roof subframes, and roof cross beams of the two roof subframes are detachably connected; a supporting piece is detachably fixed below the connecting position of the roof cross beam; a pin shaft is rotationally arranged on the supporting piece; vertex angle pieces are arranged at the four corners of the roof frame, a tensioning device is arranged in each vertex angle piece, the tensioning devices on the two sides are connected through a steel strand, and the steel strand penetrates through the lower portion of the pin shaft; the ground unit comprises two ground subframes, and ground cross beams of the two ground subframes are detachably connected; four corners of the ground frame are provided with external corner fittings; the two ends of the stand column are detachably connected with the top corner piece and the outer corner piece correspondingly. The curtain wall unit is installed on the outer vertical face of the large-width gallery bridge unit. The ultra-wide gallery bridge unit can be transported in a split mode, spliced and tensioned, and the problems that the ultra-wide gallery bridge unit is difficult to transport and the splicing rigidity is reduced are solved.
Owner:YANGZHOU LIDUO STEEL STRUCTURE ENG +1

Construction method for utilizing permanent and temporary combination of middle plate as supporting system in underground excavation arch cover method

According to the underground excavation arch cover method, the construction method utilizing the permanent and temporary combination of the middle plate and serving as the supporting system adopts an open excavation and underground excavation partition collaborative operation mode, and through the permanent and temporary combination design of the top plate, the middle plate and the bottom plate of internal facilities, the supporting arch cover, the unit top plate, the unit middle plate, the unit bottom plate and other structures serve as temporary supports in the construction stage; the operation stage is directly converted into a permanent structure, dismantling of a temporary support and material waste in a traditional open excavation method are avoided, consumption of building materials such as steel and concrete is remarkably reduced, meanwhile, manpower and time cost of the dismantling procedure is reduced, and comprehensive economic benefits are obviously improved. The method can flexibly adapt to the scene that existing buildings exist around the foundation pit, and the influence on the surface buildings is reduced to the maximum extent through reasonable division of the open excavation area and the underground excavation area.
Owner:CHINA RAILWAY SHISIJU GROUP CORP +1

A charging system suitable for a drone

ActiveCN224589387USolve the difficulty of outdoor chargingSolve transportation difficulties
This utility model provides a charging system suitable for drones, relating to the field of charging technology, including: a charging mechanism; the charging mechanism includes a charging shell, inside which a conveyor belt is arranged, the conveyor belt can rotate counterclockwise or clockwise by a driving mechanism, several charging platforms are arranged on the conveyor belt, each charging platform has a recessed charging port on its left or right side, and an electronic rotating mechanism is arranged at the bottom of the charging platform for tilting the charging platform to the left or right at a certain angle; a power receiving mechanism; the power receiving mechanism includes a power receiving base, the top of which has a spring buckle for locking onto the drone, and a telescopic charging rod is arranged on the left or right side of the power receiving base. This utility model can simultaneously solve the problems of difficult outdoor charging and transportation of drones.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU

Outdoor assembly type transformer firewall

The utility model provides an outdoor assembly type transformer firewall, which is characterized in that light steel keels are laid in an area where the firewall needs to be arranged around a transformer, and fireproof rock wool boards are filled in gaps of the light steel keels; double-layer fireproof gypsum boards are laid on the two sides of the fireproof rock wool board respectively and fixed to the light steel keel through self-tapping screws; the fireproof wall can be applied to the outdoor transformer, all components are prefabricated and assembled components, the structure is simple, construction is easy, the construction progress is fast, the problem that transportation of conventional building wall materials, concrete and other building materials with large self weight in remote areas or complex terrains is difficult is solved, on-site dry operation can be achieved, and on-site fire operation is not needed; particularly, under the condition that the transformer is installed and the firewall is constructed later, the influence on the installed transformer caused by construction procedures such as large-range operation and masonry on a construction site and open fire welding of reinforcing steel bars can be reduced.
Owner:NORTHEAST ELECTRIC POWER DESIGN INST CO LTD OF CHINA POWER ENG CONSULTING GRP

Anti-vibration supporting frame for ultrahigh altitude tower drum

ActiveCN224282147USolve transportation difficultiesprecise positioningWind motor supports/mountsTowersTowerControl theory
The utility model relates to the technical field of supporting frames, in particular to an anti-vibration supporting frame for an ultrahigh altitude tower drum. According to the technical scheme, the tower drum supporting frame mainly aims at solving the problems that an existing tower drum supporting frame is not adaptive to extreme working conditions such as strong wind, low temperature and complex vibration in an ultrahigh altitude area due to structural design and material selection, vibration resistance is insufficient, materials are prone to losing efficacy, and the stability of a tower drum is difficult to guarantee. The multiple sets of connecting rings are arranged on the outer side of the inner supporting frame, flange plates are installed on the side faces of the connecting rings, and the flange plates are connected with the tower drum through bolts; the connecting assembly is installed in the inner supporting frame and used for connecting multiple sections of tower barrels; and the buffering mechanism is arranged on the connecting assembly and used for improving the bearing capacity. The supporting frame effectively overcomes the defects of an existing supporting frame under the ultrahigh altitude extreme working condition, guarantees stable operation of the tower drum, reduces safety risks and improves power generation efficiency.
Owner:NAT ENERGY GRP TIBET ELECTRIC POWER CO LTD NAGQU BRANCH +2