The invention discloses a complex-body-type high-flow-speed
flood discharge tunnel overflowing face lining mirror surface concrete construction method, and relates to the technical field of concrete construction technologies, and the method comprises the steps of manufacturability testing, shape automatic deformation formwork
machining, measuring and point placing,
steel bar manufacturing and installing, embedded part construction, concrete warehousing and pouring. 5 times of process tests and 4 times of
simulation are carried out on site, a composite steel formwork formed by compounding a steel plate with the thickness of 10 mm and a stainless steel plate with the thickness of 2 mm is adopted for pouring concrete on the side wall of the flood discharging tunnel, and the concrete construction parameters are as follows: the mark number is C9040W8F150, the
slump is 70-90 mm, loose laying is 0.45 m, initial vibration is 60 s, compound vibration is 45 s, and the interval is 20 min. Through a mirror concrete manufacturability test, accurate, flat, smooth and defect-free construction of the concrete body is realized, and the problem that the surface of the concrete is abraded and damaged by extremely fast
water flow in a high-flow-rate
flood discharge tunnel is solved; and a complete set of mirror surface concrete construction methods such as high side wall compound vibration, bottom plate five-step fine
surface finishing, curved surface bottom plate circulating
rollover and seamless connection of construction joints are created.