Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

57results about How to "Conducive to on-site construction" patented technology

Process for reducing heavy metals with reinforcement nanometer iron based on circulating flow field during soil remediation

The invention relates to a process for reducing heavy metals with reinforcement nanometer iron based on a circulating flow field during soil remediation, belonging to the technical field of soil remediation. The process comprises the following steps: (1) dissolving CMC into distilled water, vibrating and heating in an oxygen insulation container at constant temperature, introducing nitrogen to the CMC solution, mixing by adding an FeSO4.7H2O solution into the CMC solution, uniformly, dropwise adding NaBH4 solution, and vibrating at constant temperature with uniform speed to prepare a stable nanometer zero-valent iron suspension; (2) drilling a feeding well in a soil region; (3) injecting the stable nanometer zero-valent iron suspension into an inlet pipe by using a circulating pump, temporarily stopping injection till the suspension enters an injection well and an extraction well, extracting from the extraction well, injecting into the injection well and stopping injection till 24 hours; (4) extracting a reduction liquid from the extraction well and injecting into the injecting well, carrying out constant temperature treatment on the reduction liquid with a heating rod and a temperature control instrument, and adjusting the pH value of the reduction liquid by adding an acid-alkali buffer solution. The process disclosed by the invention has the advantages of promoting nanometer zero-valent iron to reduce heavy metals in soil, eliminating the toxicity of heavy metal ions and the like.
Owner:北京煜环天地工程项目管理咨询有限公司

Roadway support structure capable of achieving multi-grade energy consumption collaborative yield and splicing method

The invention relates to a roadway support structure capable of achieving multi-grade energy consumption collaborative yield and a splicing method. The roadway support structure is composed of a D-C shaped support, a D shaped connecting sleeve, a slidable groove-shaped friction energy consumption yield connecting piece and a low yield strength energy consumption yield steel block. In the yield energy consumption process, the defect that a traditional yield position is only limited at a node is overcome, and a stereoscopic and scientific multi-grade collaborative yield system composed of the low yield strength energy consumption yield steel block, an alloy spring inside the low yield strength energy consumption yield steel block and the slidable groove-shaped friction energy consumption yield connecting piece. The slidable groove-shaped friction energy consumption yield connecting piece arranged in the support overcomes the defects that a traditional support node is relatively weak in rigidity and small in yield range, the rigidity at the support node is strengthened, the yield range is wide, the yield amount is more sufficient, and the support structure is stabler. At the same time, the slidable groove-shaped friction energy consumption yield connecting piece can be recycled and reused.
Owner:JIANGSU VOCATIONAL INST OF ARCHITECTURAL TECH

Intelligent seismic sensor

The invention discloses an intelligent seismic sensor. The intelligent seismic sensor comprises a data collection device and a power supply device for supplying power to the data collection device, and the data collection device is detachably connected with the power supply device. The data collection device comprises a first shell, a detector and a control panel. The power supply device comprisesa second shell, a second accommodation cavity is formed by the second shell, and the first shell is detachably connected with the second shell. The power supply device further comprises a power supply, and the power supply is accommodated in the second accommodation cavity, fixedly connected with the second shell and electrically connected with the control panel and the detector. The power supplydevice further comprises an external expanding interface, and the external expanding interface is formed in the second shell. The intelligent seismic sensor further comprises an adapter panel, and the adapter panel is electrically connected with the control panel, the detector and the external expanding interface separately. The technical purpose is to solve the technical problem that an existingintelligent seismic sensor is inconvenient to carry in the on-spot operation process, and construction is hindered.
Owner:MIANYUAN TECH SHENZHEN CO LTD

Asphalt polyurethane waterproof coating suitable for cement base layer and preparation method and application of asphalt polyurethane waterproof coating

The invention discloses an asphalt polyurethane waterproof coating suitable for a cement base layer and a preparation method and application of the asphalt polyurethane waterproof coating. Raw materials of the asphalt polyurethane waterproof coating comprise asphalt, a compatilizer, a water removal agent, a catalyst, filler and a terminated polyurethane prepolymer, wherein the terminated polyurethane prepolymer is prepared through a reaction of a compound which is shown in a formula (I) and a polyurethane prepolymer, and the terminated polyurethane prepolymer contains no isocyanate-terminatedgroups; and the preparation method comprises the following steps: preparing the terminated polyurethane prepolymer firstly, and then mixing the terminated polyurethane prepolymer with the remaining raw materials so as to obtain the coating. The invention further discloses application of the waterproof coating in construction of an asphalt waterproof coiled material on the cement base layer. The waterproof coating has a safe preparation process, the coating can be coated directly on the cement base layer with high content of water when the coating is in use, and a reaction is performed betweenthe hydrolyzed coating with silicate in the cement, so that the bonding force on the wet base layer is improved; and excellent bonding strength can be formed between the coating and the asphalt waterproof coiled material, particularly a short time of surface drying and hard drying and moderate viscosity are achieved, the heating step before construction can be avoided basically, and on-site construction is facilitated.
Owner:JIANGSU CANLON BUILDING MATERIALS

Railway ballastless track bed steel bar resistance testing method

The invention discloses a railway ballastless track bed steel bar resistance testing method which comprises the following steps: firstly, connecting upper and lower steel bar frames in a ballastless track bed slab and erection bars for connecting the upper and lower steel bar frames by using insulating clamps, horizontally penetrating measuring iron wires into the upper and lower steel bar framesrespectively, enabling the measuring iron wires to be tightly attached to all longitudinal steel bars in the layer respectively, and reserving a measuring end; two measuring end buttons of a direct-current 500V megger are respectively connected with a copper wire, one measuring end button is connected with a probe, and the other measuring end button is connected with a measuring iron wire; and shaking the megger, enabling a detector to respectively touch each transverse steel bar and each erection bar of the upper-layer or lower-layer steel bar frame to be detected by the probe, and recordingresistance values of the transverse steel bars and the erection bars. The detection method provided by the invention is simple, is beneficial to field construction, saves time for ballastless track bed slab construction, and improves the construction efficiency of the ballastless track.
Owner:ZHENGZHOU ENG CO LTD CHINA RAILWAY SEVENTH GRP +1

Elevation difference type seismic isolation structure of building and surrounding site of building

The invention relates to an elevation difference type seismic isolation structure of a building and a surrounding site of the building in the field of construction engineering. According to the technical scheme, the elevation difference type seismic isolation structure includes a seismic isolation joint, and a first civil engineering component and a second civil engineering component which are located on both sides of the seismic isolation joint, the first civil engineering component overhangs a first bridging piece in the direction of the seismic isolation joint in a cantilevered mode, spans the seismic isolation joint, and is placed on the upper part of the second civil engineering component, and the width of the first bridging piece satisfies the maximum deformation width covering the seismic isolation joint; and a gap is left between the first bridging piece and the second civil engineering component, and the gap is filled with a flexible material. According to the elevation difference type seismic isolation structure, the safety of the seismic isolation joint of the building and the surrounding site of the building is fully ensured, various complex working conditions are adapted, the usual normal use function of the building and the surrounding site of the building is met, normal use of the building and the surrounding site of the building and quick maintenance after the earthquake can still be ensured when the larger earthquake occurs within the design intensity range, and meanwhile, the advantages of universality and standardization are achieved.
Owner:EAST CHINA ARCHITECTURAL DESIGN & RES INST

Synergetic operating device with integration of inner pipelines and longitudinal maintenance ladders in LNG storage tank

ActiveCN104358998AMeet the process layout requirementsMeet the needs of troubleshootingPressure vesselsLaddersLNG storage tankStorage tank
The invention discloses a synergetic operating device with integration of LNG storage tank inner pipelines and longitudinal maintenance ladders. The synergetic operating device comprises three LNG storage pipelines and longitudinal maintenance ladders which are arranged in an LNG storage tank, wherein the three LNG storage tank pipelines are arranged at the bottom of the LNG storage tank; connection lines in the horizontal direction are triangular; the three LNG storage tank pipelines are parallel to one another; a plurality of annular connection parts are welded on the LNG storage tank pipelines; three annular connection parts, arranged on the same plane, on the three LNG storage tank pipelines are connected with one another in a welding mode by virtue of horizontal connection parts; the longitudinal maintenance ladders are arranged on two adjacent horizontal connection parts; each longitudinal maintenance ladder comprises two parallel vertical pull rods and a plurality of step beams which are connected among the vertical pull rods. According to the synergetic operating device, the maintenance ladders and the pipelines are combined into an integrated structure; the safety of the structure is improved; the stress of the single pipeline constraint position is alleviated; the site construction is facilitated; the construction period can be shortened.
Owner:CHINA NAT OFFSHORE OIL CORP +1

A pectin-stabilized nano-zero-valent iron restoration process for groundwater

The invention relates to a technology for repairing underground water by virtue of pectin-stabilized nanoscale zero-valent iron and belongs to the underground water repairing technology in the field of environmental pollution control. The technology is mainly used for solving the problems of large addition, poor flowability and large influence caused by the pH value of the suspension, existing when the only addition of CMC (Carboxyl Methyl Cellulose) is adopted as a dispersing agent. The process for repairing underground water by virtue of pectin-stabilized nanoscale zero-valent iron comprises the following steps: (1) preparing a mixed stabilizer from pectin powder and sodium carboxymethylcellulose; (2) preparing a stabilized nanoscale zero-valent iron suspension; (3) injecting the stabilized nanoscale zero-valent iron suspension prepared in the step (2) into an adding well by virtue of a suspension inlet pipe; and (4) after the injection in the step (3) is completed, placing packed columns carrying stabilized nanoscale zero-valent iron in the adding well and fixedly arranging the packed columns carrying stabilized nanoscale zero-valent iron in the adding well for a long time, wherein the radius of influence of each packed column carrying stabilized nanoscale zero-valent iron is 2.0-3.0m and the replacement period is 30-50 days.
Owner:北京煜环天地工程项目管理咨询有限公司

Temporary operation platform system and construction method thereof

The invention discloses a temporary operation platform system and a construction method thereof. The system comprises a set of splicing standard sections, an operation platform connected to the tops of the standard sections, bearing parts connected between the operation platform and the standard sections, connecting pieces connected to the standard sections in the vertical direction in a spaced mode, and attaching pieces connected between the standard sections and an attaching structure. The operation platform comprises a left operation platform body and a right operation platform body, each of the left operation platform body and the right operation platform body comprises a bottom platform piece connected to the tops of the standard sections, adjustable check pieces and a fixed check piece, wherein the adjustable check pieces and the fixed check piece are perpendicularly connected to the upper portion of the bottom platform piece. In construction, by arranging the bottom platform pieces, the fixed check pieces and the adjustable check pieces, convenient and fast installation and circulation can be achieved, and construction materials and time can be saved; and through the designof stretching rods and fixed rods in the bottom platform pieces and the adjustable check pieces, adjustment can be conveniently carried out according to the dimension needed by the construction platform on the basis of meeting the bearing and side fence demands, and field construction is facilitated.
Owner:CHINA CONSTR SECOND BUREAU INSTALLATION ENG

Preparation method of waterborne polyurethane coating with good corrosion resistance

The invention discloses a preparation method of a waterborne polyurethane coating with good corrosion resistance, and particularly relates to the technical field of anticorrosive coatings, and the prepared waterborne polyurethane coating has excellent corrosion resistance, good acid and alkali resistance, scratch resistance, strong adhesive force and high hardness; he method comprises the following steps: carrying out ball milling treatment on graphene oxide and 3, 5-diamino-1, 2, 4-triazole at high temperature, so that on one hand, amino in the 3, 5-diamino-1, 2, 4-triazole can react with anepoxy group on a graphene oxide sheet layer, and a large conjugated system is formed by cyclic conjugation of the 3, 5-diamino-1, 2, 4-triazole and the graphene oxide; the flow of electrons is facilitated, and the electrical conductivity is enhanced; on the other hand, the 3,5-diamino-1,2, 4-triazole provides amino and triazole with stronger activity, nitrogen atoms in the triazole can be complexed with cobalt ions added subsequently and oxygen atoms in calcium titanate, so that more metal ions are introduced to the surface of the graphene oxide to form a conductive network in a high polymer matrix, and the corrosion resistance of the obtained coating is improved.
Owner:ANHUI XINDALU SPECIAL PAINT CO LTD

Carbon fiber rod, power cable and manufacturing method of carbon fiber rod

The invention provides a carbon fiber rod, a power cable and a manufacturing method of the carbon fiber rod, and relates to the technical field of power cables. The carbon fiber rod comprises a steel core special-shaped carbon rod; and the steel core special-shaped carbon rod comprises a dispersible steel wire rope and a plurality of bonded special-shaped carbon rods, the steel wire rope is arranged in the center of the plurality of special-shaped carbon rods and is stranded with the plurality of special-shaped carbon rods, the plurality of special-shaped carbon rods are tightly twisted in a circumferential manner, and the gap between the surfaces of the adjacent special-shaped carbon rods is zero, gaps between the plurality of special-shaped carbon rods and the steel wire rope are filled with an adhesive, and the outer layers of the plurality of special-shaped carbon rods are coated with insulating layers. In the prior art, a twisted composite reinforcing core is formed by twisting round carbon rods, a compression type strain clamp cannot be used, and if a resin pouring joint technology is adopted, the overall length is large. With the carbon fiber rod, the power cable and the manufacturing method of the carbon fiber rod adopted, the above technical problems can be solved.
Owner:ZHONGFU CARBON FIBER CORE CABLE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products