Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

186results about How to "Full potential" patented technology

Multi-microgrid interconnected operation coordinated scheduling optimization method in consideration of interaction response

The invention discloses a multi-microgrid interconnected operation coordinated scheduling optimization method in consideration of interaction response. The method comprises the following steps: initializing a system and acquiring a related parameter in the day-ahead optimization process, wherein each microgrid independently solves the respective optimization strategy according to the initialization information; and then performing information interaction in a microgrid cluster to share the respectively acquired optimal strategies, and updating the system state information, wherein a system control center judges whether the Nash equilibrium is achieved; entering the intra-day optimization stage, performing short-term prediction on the scenery output and load demand, inputting the short-termprediction data in single microgrid to establish an optimization model, performing rolling optimization on the system and solving the same; selecting all control variables in a control time domain asthe actual scheduling scheme after the solution is finished, waiting for the next optimization period, and repeating the above optimization process. Through the optimization method disclosed by the invention, the consumption capacity on the new energy by the microgrid and the system reliability in the fault can be effectively improved, and the economic benefit of the microgrid is increased to a certain degree.
Owner:ZHEJIANG UNIV OF TECH

Modeling method of generator excitation system

The invention provides a modeling method for a generator excited system which comprises the following steps: (1) obtaining the idle load characteristic of the generator, the idle load and the load characteristics of an exciting dynamo, the time constants of the generator and the exciting dynamo, the phase position and frequency characteristic of the generator excited system and the damping effects of low frequency oscillation by experiments; (2) building a field system model; (3) analyzing the obtained basic data to obtain normalized model parameters, building an original simulation model in a Matlab emulator to carry out step response simulation and carrying out corresponding corrections of the parameters in the model according to simulation calculation and field experiment errors until the errors meet the requirements; (4) transforming the parameters into practically useful model parameters in a power system analyzing program and carrying out further correction of the model parameters in the program according to the specific characteristics of the original model. The model parameters of the field system obtained by the invention have the advantage of enough precision, which can really reflect the performance indexes of the field system.
Owner:SHANDONG ELECTRIC POWER RES INST

Thermal power generating unit coal feed amount control method based on frequency modulation and peak regulation of power grid

The invention relates to a thermal power generating unit coal feed amount control method based on frequency modulation and peak regulation of a power grid. The method includes the following steps that a thermal power generating unit coal feed amount control loop interface based on frequency modulation and peak regulation of the power grid is added to a logical configuration coal feed amount control loop of an original coordination control system; logical configuration of a thermal power generating unit coal feed amount control loop based on frequency modulation and peak regulation of the power grid is carried out, and output of the logical configuration of the thermal power generating unit coal feed amount control loop based on frequency modulation is introduced to the thermal power generating unit coal feed amount control loop interface based on frequency modulation and peak regulation of the power grid to serve as feedforward signals for controlling the coal feed amount; the control system is put into actual operation, according to the real-time operation curve, relevant parameters of the thermal power generating unit coal feed amount control loop based on frequency modulation and peak regulation of the power grid are set online, and finally the expected control effect is achieved. By means of the existing DCS coordination control system, the real time performance is good, the on-site debugging process is simple, and project realization is facilitated. By judging the operating state of the unit, the coal feed amounts of the unit in different operation states are accurately controlled, fast load response of the unit participating in frequency modulation and peak regulation and the stability of main parameters are guaranteed, the labor intensity of operators is reduced, and the safety and the economical efficiency of operation of the unit are greatly improved.
Owner:STATE GRID CORP OF CHINA +2

Power distribution network planning method based on maximum power supply capacity

InactiveCN102622711AImprove asset efficiencyPostpone constructionData processing applicationsLoad forecastingTransformer
The invention relates to a power distribution network planning method based on maximum power supply capacity, which comprises the following steps of: obtaining status quo power grid data and load forecast data; judging whether the distance between a new load and an existing substation is longer than a first threshold value; if the distance between the new load and the existing substation is more than the first threshold value, which indicates a blind area for power supply exists, taking Class C measures, and establishing a new substation; otherwise, calculating the maximum power supply capacity of the existing power grid; when the maximum power supply capacity is higher than the planned total load, the load of each main transformer is matched with the maximum power supply capacity and each load horizontally meets the requirements of safety verification of the main transformers N-1, stopping the process, otherwise, taking Class B and C measures to adjust the total power supply capacity; or taking Class A measures to adjust the distribution of loads among the main transformers. By adopting the method, the dependence on capacity-load ratio indicators can be reduced, the potential of the existing network can be fully utilized, the construction of power grids can be postponed, and the problems of land shortage and high cost for construction of power grids can be solved; and the allocation scheme of loads matched with the allocation of the maximum power supply capacity can be provided to achieve the purpose of fully utilizing the power supply capacity of the power grids.
Owner:TIANJIN UNIV

Flow characteristic correction method for steam turbine high pressure control valve of thermal power generating unit

ActiveCN104343475AGuaranteed stabilityMeet the requirements of FM and peak shavingMachines/enginesEngine componentsControl systemPower grid
The invention relates to a flow characteristic correction method for a steam turbine high pressure control valve of a thermal power generating unit. The flow characteristic correction method comprises the following steps: additionally arranging a flow characteristic correction control loop interface of the steam turbine high pressure control valve of the thermal power generating unit in the logical configuration comprehensive valve position control loop of an original steam turbine digital electric hydraulic control system; carrying out the logical configuration of a flow characteristic correction control loop of the steam turbine high pressure control valve of the thermal power generating unit, and outputting and introducing the logical configuration into the flow characteristic correction loop interface of the steam turbine high pressure control valve of the thermal power generating unit as the offset correction signal of a comprehensive valve position command; putting a control system into actual operation, setting relevant parameters of the flow characteristic correction control loop of the steam turbine high pressure control valve of the thermal power generating unit on line according to a real-time operation curve, and finally achieving a prospective control effect. The opening of the steam turbine high pressure control valve when the unit participates in frequency modulation and peak modulation corresponds to the linearity of main steam flow, so that the equipment potential is fully developed, and the stability of main parameters is guaranteed while the frequency modulation and peak modulation requirements of a power grid are met.
Owner:STATE GRID CORP OF CHINA +2

Fracturing process for removing breakdown fluid contamination

The invention relates to a mining technology for the petroleum, natural gas and the coal seam gas, in particular to a compression fracture process which avoids the fracturing fluid pollution and solves the problem that the fracture conductivity is reduced caused by the dense filter cake formed on the surface of the strata fracture by the thickener added in the fracturing fluid applied in all the compression fracture constructions found in the prior art. The construction steps include that the pad fluid is injected into the oil gas storage strata; the sand-laden fluid is injected continuously when the oil gas storage strata generates fractures; subsequently, the displacement fluid is injected; then the pump on the ground is stopped; 60 minutes later after the fracture closing time T3 and the pressure is lower than the fracture closing pressure P3, the oxidant solution such as the chlorine dioxide result solution, the potassium permanganate, the hydrogen peroxide solution or the persulphate which can degrade the polymers is injected into the fractures as the fracturing post pad fluid; finally, the displacement fluid is injected to extrude all the compression fracture post pad fluid to the strata fractures. The compression fracture process can radically avoid the pollution block of the fracturing fluid, exert the potential of the fracturing technology and increase the yield.
Owner:郝东 +1

Novel technique for producing mandrel bar

The invention relates to a technique for manufacturing a tube rolling tool of hot rolling seamless steel tube, in particular to a technique for manufacturing a rolling machine mandril of a PQF which belongs to the processing technique of workpiece. The invention provides a novel technique for manufacturing the mandril of a tube rolling; the technical scheme adopted by the technical problem of the invention is as follows: refining a steel ingot-forging and blooming-rolling and shaping-surface rough machining-hardening and tempering processing-fine machining and polishing-surface plating. The technique is characterized in that the rolled mandril has the advantages of smoother surface, less bending degree of a blank as well as a small size tolerance. The technique is characterized in that the basic body of the mandril has a high temperature obdurability and the surface of the mandril has excellent wear-resistance. The technique has the beneficial effects that: the manufacturing technique of the mandril is more reasonable; the potential of a device is fully exerted; the yield rate and the production efficiency are high; the cost is low; the quality of the mandril is excellent; the social benefit is remarkable; besides, the manufacture technique brings broad prospects for manufacturing the mandril of the tube mill.
Owner:赵金发

Capturing circuit and writing control method of 10G EPON (10 Giga Ethernet Passive Optical Network) message

The invention discloses a capturing circuit and a writing control method of 10G EPON (10 Giga Ethernet Passive Optical Network) messages. The writing control method comprises the following steps: receiving EPON messages interacting among 10G EPON OLT (Optical Line Terminal) and ONU (Optical Network Unit) through an optical module and a 10G SERDES (Serializer/Deserializer); combining and triggering message capturing according to set conditions after the decoding at a PCS (Physical Coding Sub-layer); writing the captured message into capturing cache, wherein the steps and formats for storing the capturing frames are as follows: writing 128bit frame data at an even number clock period while a frame envelope is valid; and writing the frame head byte number, the frame end byte number, the reaching time, the frame error indication, CRC (Cyclic Redundancy Check) verification error indication and frame boundary symbol of the frame within a clock period at the frame end. With the adoption of the capturing circuit and the writing control method, continuous EPON messages of 10 G can be captured and analyzed rapidly and precisely; the storage space of the captured message is reduced through specific triggering and screening conditions; the performance and the use efficiency of the remote scheduling are improved; and the inter-compatibility of factories of different equipment is enhanced.
Owner:FENGHUO COMM SCI & TECH CO LTD +1

Ordered charging and discharging control method considering user evaluation based on fuzzy control technology

The invention discloses an electric vehicle ordered charging and discharging control method considering user evaluation based on fuzzy control. The method comprises the following steps: S1, constructing an ordered charging and discharging framework based on fuzzy control; S2, the EV control terminal acquiring new access state information at the beginning stage of each time period; S3, sequentiallybringing all the electric vehicles into a queue waiting for obtaining a next-stage charging and discharging instruction according to the time sequence; S4, comparing a calculation result of the fuzzycontroller with a set constraint condition, and making a charging and discharging plan of the target electric vehicle again based on the constraint condition; S5, if the queue is emptied, uploading the updated power grid load state to a distribution network operator and waiting for the start of the next control time period; and S6, determining whether the ordered charging and discharging controltasks of all the control time periods in one day have been completed or not at present, and if so, ending the charging and discharging control task of the day. According to the method, the user evaluation is improved, and the purposes of reducing the power grid load fluctuation rate and performing peak clipping and valley filling are further achieved.
Owner:ZHEJIANG UNIV OF TECH

Ethylene rectification tower sensitive plate temperature control system and control method thereof

The invention relates to an ethylene rectification tower system belonging to an ethylene device and a control method thereof. The invention provides a sensitive plate temperature control system and a control method thereof by combining the process operation characteristics in an ethylene rectification production process, comprehensively using latest technology in chemical engineering and automatic control science and adopting nonlinear control theory. The system and the method perform balancing control of the temperature deviation of discharged materials of two reboilers by arranging a temperature balancing control circuit and online adjustment of the flow rate of a heating medium entering the two reboilers and a load distribution proportion, ensure the gas and liquid phase balance in an ethylene rectification tower, stabilize the temperatures of a control sensitive plate and the discharged materials, overcome external disturbance caused by changes in the temperature and pressure of the heating medium, lay a firm foundation for the stable operation of the whole rectification tower and the 'optimized' operation of product quality, fully use the DCS in the ethylene device and the potential of operational equipment, and effectively utilize raw material and energy.
Owner:EAST CHINA UNIV OF SCI & TECH

Universal automatic pallet applying equipment suitable for different types of building block forming machines

The invention discloses universal automatic pallet applying equipment suitable for different types of building block forming machines. The universal automatic pallet applying device is characterized in that a pallet storage conveying frame, a pallet lifting device, a pallet pushing device, a conveying bridge and a pallet moving device of a building block forming machine are arranged in a plane in matched manner and form a 'U' shape, and each device comprises a body, a transmission mechanism, an adjusting mechanism and an electric system. The equipment further comprises a control system with PLC (programmable logic controllers). The control system is connected with circuits of the electric systems to control power mechanism and the transmission mechanisms so as to allow a pile of pallets on the pallet storage conveying frame to be conveyed to the pallet lifting device, the pallet pushing device conveys the pallets one by one to a pallet box of a pallet conveyor. The universal automatic pallet applying equipment can be positioned and adjusted according to different sizes of the pallets, so that the universal automatic pallet applying equipment is suitable for different types of building block forming machines. The universal automatic pallet applying equipment has the advantages that the universal automatic pallet applying equipment is capable of achieving full-automatic, semi-automatic and manual control and is high in universality, automatic pallet applying is achieved, work efficiency is increased, labor intensity is lowered, investment is saved, production cost is lowered and the like.
Owner:山东高唐华通液压机械有限公司

Automatic transporting device for pallets for building block forming machine

The invention discloses an automatic transporting device for pallets of a building block forming machine. In the automatic transporting device, a pallet conveying rack (4) is in a 'T'-shaped plane arrangement with a pallet transporting rack (3) and in an 'n'-shaped arrangement with a pallet moving device (2). Blocks formed by a block forming machine (1) are carried away by a transport cart (C). When a front pallet (T) contacts a transport starting travel switch (ZDX) of the pallet moving device (2), a transport motor (8) is started to enable the pallet transporting rack (3) to convey the pallet (T) to the pallet moving device (2); when the front pallet (T) contacts a transport-stopping and conveying-starting travel switch (ZSX), the transport motor (8) stops, a conveying motor (20) starts and pallet conveying rack (4) conveys the pallet (T) to the pallet transporting rack (3); and when the pallet (T) contacts a conveying stop travel switch (STX), the conveying motor (20) stops and a new pallet (T) is placed on the pallet conveying rack (4). Thus, that pallets (T) are placed on all stations of a transmission mechanism is ensured, and the automatic transporting device orderly operates with the production of the block forming machine (1) to form an automatic circulating system. The automatic transporting device has the advantages of stable and reliable operation, time and labor conservation, low cost and high efficiency.
Owner:山东高唐华通液压机械有限公司

Variable speed wind turbine generator participation system frequency modulation method

The invention discloses a variable speed wind turbine generator participation system frequency modulation method. The method comprises the steps that firstly, a wind turbine generator group is grouped to obtain multiple wind turbine generator sets; the frequency control dead zone and system frequency offset of each wind turbine generator set are set; then, when the system frequency offset exceeds the frequency control dead zone, wind turbine generator frequency control is triggered, and the frequency modulation operation mode is entered; the frequency modulation increment and frequency modulation time sequence of each wind turbine generator set are calculated; the frequency modulation increment and the frequency modulation time sequence are issued to each wind turbine generator set; finally, whether the system frequency of each wind turbine generator set exceeds the minimum point or not is judged; if yes, the wind turbine generator set exits from the frequency modulation operation mode; if not, according to the frequency modulation time sequence, frequency modulation operation is performed till the end. According to the variable speed wind turbine generator participation system frequency modulation method, on the basis of the wind power plant participation system frequency modulation time sequence control strategy, the wind turbine generator sets are coordinated for frequency modulation active power increment and time sequence exit, and the potential of variable speed wind turbine generator participation system frequency modulation is sufficiently excavated.
Owner:TSINGHUA UNIV +3

Precast expanding pile as well as construction method and construction mechanical equipment thereof

The invention relates to a precast expanding pile as well as a construction method and construction mechanical equipment thereof in the field of pile foundation engineering. The construction method of the precast expanding pile of the invention comprises the following steps of: sedimentating a hollow precast pile (2) into a preset depth, wherein the bottom of the hollow precast pile (2) is connected with a pile plug (1); moving away the pile plug (1) and pouring an immature pile body material into the hollow precast pile (2); squeezing the immature pile body material into a soil body at the lower part of the hollow precast pile (2) to form a pile bottom expanding segment (4); and repeating the steps until the pile bottom expanding segment (4) satisfies the requirement. The precast expanding pile obtained through the construction comprises the hollow precast pile (2) at the upper part, the pile bottom expanding segment (4) at the lower part and the pile plug (1) at the bottom, and high-efficiency construction equipment is developed, the pile in the form is convenient to construct, has reliable quality, greatly improves the bearing capacity of the end parts of the precast piles, such as PHC (Prestress High Cement ) tubular pile, hollow square piles, and the like which are widely applied at present and can be used as an pulling and compression resistant bearing pile with high bearing capacity and low manufacture cost.
Owner:张继红

Alternating-current and direct-current interconnected power grid Thevenin equivalent parameter online calculation method

The invention discloses an alternating-current and direct-current interconnected power grid Thevenin equivalent parameter online calculation method. The method includes the steps that equivalent impedance or equivalent current source processing is conducted on a direct-current power transmission unit in an alternating-current and direct-current interconnected power grid according to PMU measurement values to obtain a primary correction admittance matrix; equivalent impedance processing is conducted on the load of current state load nodes in the alternating-current and direct-current interconnected power grid to obtain a secondary correction admittance matrix after equivalent impedance processing; load impedance at the current state load node in the alternating-current and direct-current interconnected power grid is cut off, and a node admittance matrix for open-circuit voltage is calculated according to the secondary correction admittance matrix; according to the node admittance matrix for open-circuit voltage and node state information of all nodes in the current state, a node voltage equation for open-circuit voltage is calculated; Thevenin equivalent impedance is calculated, and accordingly all Thevenin equivalent parameters of researched load nodes in the alternating-current and direct-current interconnected power grid can be obtained.
Owner:SHANDONG UNIV

Electric vehicle group scheduling method based on load classification

ActiveCN110472785ATravel needs are not affectedStrong schedulabilityForecastingElectric vehicle charging technologyAutomotive engineeringCharge type
The invention discloses an electric vehicle group scheduling method based on load classification. The method comprises steps of carrying out load prediction and electric vehicle behavior prediction; establishing a charging type electric vehicle load group scheduling objective function and a charging type electric vehicle load group scheduling constraint condition in G2V and V2G modes; optimizing the economic benefit of the power exchange type electric vehicle load aggregator in the G2B mode and the economic benefit of the power exchange type electric vehicle load aggregator in the B2G mode tothe maximum, and establishing a power exchange type electric vehicle load group scheduling objective function and a power exchange type electric vehicle load group scheduling constraint condition in the G2B mode and the B2G mode; determining an electric vehicle load classification scheduling method and charging and discharging schemes for rechargeable electric vehicle batteries; adopting a batterycharging, discharging and battery replacing scheme of the battery replacing type electric automobile; and enabling the aggregator to purchase and sell electricity from the power grid and optimizes the economic benefit of the aggregator. According to the method, the potential of the demand side is fully excavated, and certain guiding significance is achieved for large-scale electric vehicle accessto the power grid in the future.
Owner:XI AN JIAOTONG UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products