The invention provides a manufacturing process of two-in-one composite plastic woven cloth, wherein a portal frame, a motor, a coating roller, an annular sliding chute, discharging devices, swing devices and a heat conduction cylinder are matched to complete operation. In the existing coating process, in general, a resin solution is directly poured onto the woven cloth, coating is carried out through the coating roller, and due to the fact that the concentration of the resin solution is high, it is difficult for the resin solution to drip, the single pouring amount of the resin solution is always unequal, and the pouring amount cannot be effectively controlled; and the temperature of the resin solution in hot melting state is higher, the phenomenon of cooling and solidification often occurs when the resin solution to be poured out is cooled, and when the resin solution is poured onto the woven cloth, the amount of the resin solution at each position of the woven cloth is unequal, and consequently the thickness of each position of a rolling layer of the woven cloth is uneven during rolling of the coating roller, With the manufacturing process of the two-in-one composite plastic woven cloth, the above problems can be solved.