The utility model belongs to the field of trolley, especially a bridge shed integrated inner and outer mould trolley, aim at the low efficiency of the existing bridge shed construction: template needs repeatedly dismounting, transport, the erection and removal process of full hall
scaffold can easily cause safety accidents;
Scaffold material and labor cost are high, the problem that field
assembly precision is difficult to control, present the following scheme, it includes inner mould trolley and outer mould trolley, the inner mould trolley includes inner frame stand, the lateral work platform is fixedly installed to the side of inner frame stand, a plurality of inner frame stand are fixedly connected through longitudinal scissors and longitudinal connecting beam between the side, in the utility model, inner mould trolley and outer mould trolley work cooperatively, realize the full process
automation of bridge shed construction, through the mechanism such as
vertical cylinder in stand, side mould upper translation cylinder, realize the quick stripping and translation of template,
common rail walking mechanism: inner mould trolley and outer mould trolley
common rail design, outer mould trolley can demould in advance and walk independently, avoid construction conflict.