The invention discloses a storage tank supporting leg construction process, and relates to the technical field of storage tank construction. The problem that existing storage tank supporting leg construction is poor in quality is solved. According to the technical scheme, the construction process comprises the following steps of A, the storage tank supporting leg manufacturing procedure; and B, the storage tank supporting leg lifting procedure including the substeps of checking before steel part mounting, b, part mark marking, c, cable wind rope and anchor arranging, d, scaffold preparing, e,cup bottom adjusting, f, steel column mounting, g, steel column correcting including 1, column foundation elevation, 2, alignment of longitudinal and transverse cross lines, and 3, column body perpendicularity correction, h, cross beam mounting, and i, cross beam correcting including 1, elevation adjusting and cross beam perpendicularity correcting. Through actual elevation measuring, longitudinaland transverse cross line alignment, level gage operation and the manner of plumb hanging by a crane, the mounting precision of steel columns and cross beams can be improved, and the storage tank supporting leg construction quality is improved.