The invention relates to the field of water injection and dust prevention of fully mechanized
coal mining faces, in particular to a constant-flow injection and extraction combined
coal seam water injection method. The method specifically comprises the following steps: A, constructing a water injection
drill hole in a
coal seam, and arranging
water diversion monitoring points on a roadway wall surface and in the coal seam; b, coal seam water injection is conducted in all the construction
drill holes at the constant flow Q, and the time when water drops start to be hung on the wall at the wall face monitoring points is observed and recorded; c, when the water injection time reaches the latest time when water drops are hung on the wall, a water injection
system is closed, water injection is stopped, and an extraction control valve is started; d, observing and recording the
peak value appearing time of the monitoring points in the coal seam; and E, when the extraction time reaches the third
peak value stabilization time, the extraction
system is closed, extraction is stopped, and a control valve of the water injection
drill hole is opened. Circularly and intermittently injecting water until the accumulated time reaches the theoretical water injection time. According to the method, the
osmotic pressure in the
drill hole is enhanced through constant-flow water injection, then the
wetting area is enlarged in an injection and extraction combined mode, and the gas emission amount and the dust production amount of the fully-mechanized
coal mining face are reduced.