The invention discloses an ultra-large
wind power station and a construction method and a
piston ring
replacement method thereof, the
wind power station rotates through a fan
impeller, the fan
impeller rotates to drive an
air compressor in a cabin to work, high-temperature and high-pressure gas is produced, the high-temperature and high-pressure gas is input into an air
energy storage tank to be temporarily stored, and according to the requirement of a
power grid, the
piston ring is replaced. Energy generated by the fan
impeller and energy accumulated by the air
energy storage tank are output at the same time, high-temperature and high-pressure gas rushes into the
steam turbine and releases energy in the
steam turbine, the
steam turbine rotates to drive the generator to generate
electricity, and high-quality
electric energy is produced and connected with a
power grid; the
wind power station integrates energy obtaining,
air compression,
energy storage, power generation and power transformation, the wind
power station adjusts the electric quantity at any time, the problem that serious
time difference exists between the electric quantity produced by
renewable energy and the electric quantity consumed by power consumers in China is revolutionarily solved, the wind
power station is arranged for hundreds of thousands of square kilometers, and huge
electric energy is produced. The method has the
advantage of balancing the
electrical load of the
power grid.