Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

75results about How to "No seepage" patented technology

Phase change material microcapsule coated by thermoset phenolic resin and preparation method thereof

The invention discloses a phase change material microcapsule coated by thermoset phenolic resin and a preparation method thereof. The capsule uses a phase change material as a capsule core and the thermoset phenolic resin as the capsule wall. The mass ratio of materials of the microcapsule is that 20-75% of the phase change material, 0.5-3% of an emulsifying agent, 2-10% of a catalyst, 20-60% of thermoset phenolic resin prepolymer and 0.2-10% of a reaction terminating agent. The preparation method comprises heating and melting the phase change material, mixing the phase change material with the emulsifying agent, distilled water and the catalyst to form emulsion, heating the emulsion to 40 DEG C to 80 DEG C, dropwise adding the thermoset phenolic resin prepolymer, keeping constant temperature for 20-100minutes after finishing dropwise adding, adding the reaction terminating agent, adjusting the potential of hydrogen (pH) to about 7.0 with organic acid or inorganic acid, vacuumizing to evaporate moisture, and obtaining the phase change material microcapsule coated with the thermoset phenolic resin. The particle diameter of the phase change material microcapsule ranges from 0.5mum to 4mum. The phase change material microcapsule can be used for manufacturing building materials, thermal storage thermoregulation textiles, crop growth protection agents and the like.
Owner:李雨杉

Novel connecting structure for subway tunnel and extended station and construction method of novel connecting structure

InactiveCN107476340AEnsure safetyImprove the phenomenon of uneven stress on the structureArtificial islandsUnderwater structuresInternal forcesSegment structure
The invention relates to a novel connection structure between a subway tunnel and an extended station and a construction method thereof, belonging to the technical field of underground construction. Including tunnel pipe gallery, load-bearing columns, top connection block, bottom connection block, concrete plastering layer and waterproof layer, through strengthening reinforcement, it can meet the large internal force borne by the shield tunnel segment in the process of expanding the transfer station , so as to ensure the safety of the segment. By using the top connection block and the bottom connection block, the connection node has sufficient rigidity and reduces the deformation of the node. The third bottom plate is installed on the bending support of the second bottom plate, eliminating the second The settlement difference between the bottom plate and the first bottom plate makes the connection structure and force between the two very balanced, which solves the connection problem between the rigid transfer station main structure and the flexible segment structure. The shape of the special shield segment of the invention is consistent with that of the shield segment of the common subway interval tunnel, and can be produced by using the same mold as the shield segment of the ordinary subway interval tunnel.
Owner:SHENYANG JIANZHU UNIVERSITY

Manufacturing method for PCB for charging pile

The invention discloses a manufacturing method for a PCB for a charging pile. The manufacturing method comprises the following steps: S1, earlier-stage processing is carried out; S2, copper depositionis carried out; S3, blue glue pasting is carried out: a gold-plated area and a non-gold-plated area are preset on the PCB, a to-be-gold-plated bonding pad to be gold-plated is arranged on the presetgold-plated area, blue glue is pasted on the non-gold-plated area, and a copper layer is exposed in the gold-plated area; S4, first micro-etching and blue glue tearing off are carried out: the copperlayer in the gold-plated area is subjected to micro-etching, and the blue glue in the non-gold-plated area is torn off: S5, ink printing is carried out: the preset gold-plated area is covered by the ink and is then baked, and after exposure and development, the bonding pad to be gold-plated is exposed; S6, a dried film is selected and gold plating is carried out: the two sides of the PCB are covered with the dried film, the bonding pad to be gold-plated is exposed and developed, and gold plating is carried out after nickel plating is carried out on the bonding pad to be gold-plated; S7, film stripping and ink stripping are carried out; S8, second micro-etching is carried out; and S9, post-processing is carried out. According to the method, the conditions of gold infiltration and circuit infiltration and corrosion are avoided, the product quality is ensured, the production efficiency is improved, and the prepared PCB can bear large current.
Owner:VICTORY GIANT TECH HUIZHOU CO LTD

Semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure and construction method thereof

The invention relates to a semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure and a construction method thereof. The semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure comprises a semi-prefabricated UHPC cover beam shell and a prefabricated pier stud located under the semi-prefabricated UHPC cover beam shell; the semi-prefabricated UHPC cover beam shell is of an uncovered shell-shaped structure with the hollow interior; a pier stud after-pouring groove is vertically formed in the top of the prefabricated pier stud from top to bottom; a through hole which is coaxial with and is matched with the pier stud after-pouring groove is formed in the bottom of the semi-prefabricated UHPC cover beam shell in a penetrating manner, and the through hole is located at the center of the bottom of the semi-prefabricated UHPC cover beam shell; a plurality of pier stud longitudinal ribs are embedded into the prefabricated pier stud, and the upper ends of the pier stud longitudinal ribs all vertically and upwards extend to penetrate through the through hole and go into the semi-prefabricated UHPC cover beam shell; and a cover beam steel reinforcement cage is arranged in the semi-prefabricated UHPC cover beam shell. The semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure is simple and reasonable in structure and good in durability.
Owner:FUZHOU UNIV

Convenient-to-clean sputum suction device for pneumology department

The invention discloses a convenient-to-clean sputum suction device for a pneumology department, and relates to the technical field of sputum suction devices for the pneumology department, and aims tofully clean sputum adhered to a sputum suction collection box. The sputum suction device specifically comprises a box body, two cover plates are connected to the outer wall of one side of the box body through hinges, the sputum aspiration collection box is arranged on the outer wall of the top of the box body, a graduated scale is arranged on the inner wall of one side of the sputum aspiration collection box, three connectors are fixed to the outer wall of one side of the sputum aspiration collection box through bolts, a liquid outlet pipe is fixed to the outer wall of one side of the sputumsuction collection box through screws, a sealing cover plate is slidably connected to the outer wall of the top of the sputum suction collection box, a water disc is welded to the outer wall of the bottom of the sealing cover plate, and two or more flushing heads are fixed to the outer wall of the bottom of the water disc through bolts. Water in the water tank can be pressurized through a pressurepump, meanwhile, an insertion hole is formed in the outer wall of the top of the sealing cover plate, and the water in the water tank can be rapidly guided into the water disc through a flushing pipe.
Owner:李瑞

Water pump dedicated motor

The invention discloses a w synchronization ring comprising a shell and a motor body. The motor body is installed in the shell. One end of the shell is provided with a front end cap. The motor body isinternally provided with an output shaft, and one end of the output shaft penetrates through the shaft hole of the front end cap. The shaft hole of the front end cap is internally provided with a sealing shaft ring and a bearing. The output shaft penetrates through the sealing shaft ring and the bearing. The sealing shaft ring is composed of an outer fixed ring and an inner sealing ring, and theouter fixed ring sleeves the periphery of the inner sealing ring. The two ends of the contact inner ring wall of the outer fixed ring and the inner sealing ring are provided with rotating grooves. Rolling balls are flexibly inlaid between the rotating grooves. The sealing shaft ring is arranged in the shaft hole of the front end cap through which the output shaft penetrates, the sealing shaft ringis composed of the outer fixed ring and the inner sealing ring and the inner sealing ring can rotate on the inner ring wall of the outer fixed ring under the effect of the rolling balls without waterseepage so that the sealing performance can be guaranteed without influencing rotation of the output shaft.
Owner:海宁梅尔环境科技有限公司

Method for determining control index of double-layer continuous reinforced concrete pavement reinforcement ratio

ActiveCN109930456ASolve the problem of control index of reinforcement ratioSolve the problem that there is no control index for the reinforcement ratio of double-layer CRCPRoads maintainenceReinforced concreteEconomic benefits
The invention discloses a method for determining the control index of a double-layer continuous reinforced concrete pavement reinforcement ratio. The method is characterized in that the method comprises the following steps of step one, initializing the reinforcement ratio of the upper and lower layers of steel bars and the positions of the reinforcement; step two, according to the calculation formula of a transverse crack width variation value delta bj under different reinforcement positions, calculating the transverse crack width variation value delta bj under different reinforcement positions; step three, according to the calculation formula of the transverse crack width variation value delta b'j under different reinforcement ratios, calculating the transverse crack width variation valuedelta b'j under the different reinforcement ratios; step four, according to the delta bj and delta b'j values, determining a double-layer CRCP transverse crack width control value bj, wherein the double-layer CRCP transverse crack width control value bj is the double-layer CRCP reinforcement ratio control index. According to the method, the reinforcement ratio control index can be used for the reinforcement ratio design, which has important significance for scientifically and rationally designing the double-layer CRCP reinforcement ratio, the reinforcement ratio is an important index for determining the performance and economy of the double-layer CRCP, and the method has significant social and economic benefits.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Plastic package stator rust-proof treatment device and using method thereof

The invention relates to the technical field of intelligent processing equipment, and especially relates to a plastic package stator rust-proof treatment device and a using method thereof. The plasticpackage stator rust-proof treatment device comprises a shell, a conveying mechanism, a tray, a dust blowing seepage prevention mechanism and a coating mechanism and is characterized in that the shellis a rectangular hollow box body; the conveying mechanism is arranged in a lower area in the shell and is composed of a synchronous belt mechanism driven by a servo motor, and the tray is arranged onthe synchronous belt mechanism; the tray is a rectangular flat plate, and a plurality of countersunk head through holes are uniformly distributed in the rectangular flat plate to serve as plastic package stator placement grooves; the dust blowing seepage prevention mechanism is arranged below the conveying mechanism; and the coating mechanism is located above the conveying mechanism and right faces the dust blowing seepage prevention mechanism. The device and the method have the beneficial effects that rust-proof treatment can be performed under a condition that an inner cavity of the plasticpackage stator is kept clean all the time, and meanwhile a rust-proof liquid can be prevented from permeating into a bearing chamber of an end cover.
Owner:蔡国政

Waterproof wheel edge system for engineering mixer truck

The invention relates to a waterproof wheel edge system for an engineering mixer truck. The system comprises an axle housing body, wherein the left end of the axle housing body is provided with a hub;the hub is sheathed with a brake drum; the outer wall of the right end of the axle housing body is connected with a space ring assembly; and the space ring assembly and the axle housing body are sealed through an O ring. The system can solve the following problems of an existing mixer truck waterproof wheel edge in a practical use process: 1) in an existing waterproof wheel edge, an independent hub oil seal is adopted to carry out a waterproof operation, dynamic lubrication sealing can not be realized in a use process, a situation of water leakage is liable to happen, and a waterproof effectis lowered; 2) after the hub and the axle housing body are simply isolated by the space ring, installation and connection are carried out, and a gap between the hub and the axle housing body needs tobe subjected to additional sealing processing; 3) a connection position between a half shaft and the hub is not subjected to the sealing processing; and 4) the brake drum and the hub are connected through a butt joint way, so that a stabilization effect is poor, and daily protection and maintenance is troublesome.
Owner:TAIZHOU SHENZHOU TRANSMISSION TECH

Water valve joint of automobile air conditioner radiator

The invention discloses a water valve joint of an automobile air conditioner radiator. The water valve joint comprises a pipe body, a water tank joint and a tightening button; one end of the pipe body is fixedly connected with a water valve connection pipe; the other end of the pipe body is fixedly connected with a joint inner pipe; two pipe body grooves are formed in the periphery of the joint inner pipe; a small rubber ring is connected in each pipe body groove in a sleeving manner; the pipe body, at one end of the joint inner pipe, is fixedly connected with a water tank connection; two joint grooves are formed in the inner side of the water tank connection, close to the end point; a large rubber ring is adhered in each joint groove; one end of the water tank joint is fixedly connected with three steel strips; and one end of each steel strip is fixedly connected with the tightening button. According to the water valve joint, one end of the pipe body is fixedly connected with the joint inner pipe and the water tank connection, and the outer side of the joint inner pipe and the inner side of the water tank connection are connected with the small rubber rings and the large rubber rings in the sleeving manner respectively, so that water cannot leak due to strong sealing performance when passing through the part, mounting and disassembly are also convenient, scales cannot be retained when the water valve joint is disassembled for cleaning during maintenance, and a great amount of expenses are saved for an automobile owner.
Owner:诺贝特空调(盐城)有限公司

Super-weather-resistant composite waterproof roll and preparation method thereof

The invention provides a super-weather-resistant composite waterproof roll. The super-weather-resistant composite waterproof roll is prepared from diisodecyl phthalate, epoxypropane glyceryl polyether, a tackifier, castor oil alkyd resin and zinc stearate. A preparation method disclosed by the invention comprises the following steps: carrying out plastifying at a temperature of 78 DEG C for 10 minat first, then performing mixing at a temperature of 85 DEG C for 30 min, and then carrying out cooling to 65 DEG C at a speed of 2 DEG C / min. According to the waterproof roll in the invention, lithium-based bentonite is used as an inorganic wear-resistant material, and then a certain amount of aluminate is added to improve the compatibility among components; and with the preparation method, obtained pellets are smooth, low in roughness coefficient, small in fluid resistance and high in uniformity, and the super-weather-resistant composite waterproof roll with integrated wear resistance, compression resistance, tensile properties and flexibility is obtained.
Owner:郑月友
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products