Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

67results about How to "Huge social benefits" patented technology

Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways

The invention discloses a reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways. The expanded and excavated stations are simply supported frame wall column type double-layer subway stations in structural forms. The reversed construction method includes retaining soil and water by the aid of piles in rows and waterproof curtains or underground diaphragm walls, and resisting lateral deformation of soil mass; excavating the soil mass between openings of parallel shield tunnel segments and constructing cross passages; grouting and reinforcing the soil mass above tunnels, building foundation pit excavation supporting structures and short supporting piles of station bodies and connecting the tops of the foundation pit excavation supporting structures and the short supporting piles with the outer piles in the rows or the outer underground diaphragm walls by connecting beams; constructing the structures of the station bodies by the aid of cover and excavation top down processes, filling the station bodies with the soil mass and recovering road surfaces. Foundation pit slopes can be supported by the aid of composite soil nailing supporting technologies in excavation procedures. The reversed construction method has the advantages that the reversed construction method is reasonable and feasible, is high in operability and has important engineering application value and an important development prospect, and huge economic, social and environmental benefits can be brought by application of the reversed construction method.
Owner:BEIJING UNIV OF TECH

Filling paste prepared from salt deposit exploitation tail salt and consolidated filling method thereof

The invention discloses filling paste prepared from salt deposit exploitation tail salt. The filling paste is characterized in that: tail salt prepared by performing ore dressing processing on sylvite or carnallite ore is taken as a filling substrate; the filling substrate mainly comprises NaCl and MgCl2, and hemihydrate gypsum CaSO4 1/2H2O is taken as a cementing material; NaCl serving as an aggregate for solidifying the filling substrate is added as required, and the concentration of a filling material is adjusted by controlling the adding amount of NaCl; and paste of which the mass concentration is 81-88 percent is formed by mixing and stirring the filling substrate with the cementing material. The invention further discloses a filling method for using the filling paste. High-concentration paste is prepared by using the tail salt and the cementing material, the paste filling material is solidified through a physical-chemical reaction after being pumped to an underground worked out section, and a filling body with certain strength can be formed without dehydration in a stope. Softening damage to ore columns and wall rock caused by water contained in filling slurry is avoided, and the ecological environments on the ground surface and the periphery of a mining area are protected effectively.
Owner:BLUESTAR LEHIGH ENG INST CO LTD

Method for raising seedlings of Pinus kesiya var.langbianensis by efficient twig cuttage propagation

The invention relates to a method for raising seedlings of Pinus kesiya var.langbianensis by efficient twig cuttage propagation, particularly relates to a method for obtaining Pinus kesiya var.langbianensis by low-cost and efficient cuttage, which directly adopts mountain red soil (raw soil) as matrix and belongs to the technical field of cuttage seedling raising. Since mountain red soil (raw soil) has certain permeability, good water retaining capacity and less harmful bacteria, the method directly adopts mountain red soil as matrix for raising seedlings of Pinus kesiya var.langbianensis by twig cuttage, so as to increase the rooting rate and survival rate of the seedlings of Pinus kesiya var.langbianensis obtained by twig cuttage. The invention relates to a low-cost asexual propagation technology for Pinus kesiya var.langbianensis by twig cuttage. By use of the method provided by the method, the propagation coefficient is high, the seedling raising is not affected by seed size, the raised seedlings have relatively stable traits, the individual plant in a cutting orchard can provide 50-70 coppice shoots, and the ear length is 10 cm. The method has wide prospect of industrialization. The capacity of supplying Pinus kesiya var.langbianensis seedlings is greatly improved by virtue of the generalization and application of the method, and great economic, social and ecological benefits are generated.
Owner:PUER INST OF FORESTRY SCI

Open-cut station body structure and construction method thereof

The invention discloses an open-cut station body structure and a construction method thereof. A station body is of a two-layer double-column three-span box-shaped structure. The construction method includes the steps that a site is leveled, a precipitation well is dug, precipitation is carried out, foundation pit drainage measures are taken, and cast-in-situ bored piles are arranged; a foundationpit is dug to the depth 0.7 m below a first support, pile top crown beams are arranged, and the first steel support is erected; the foundation pit continues to be dug downwards to the bottom of the foundation pit, a second support and a third support are sequentially erected, and waist rails are put in time; a bottom plate concrete structure is poured, side wall waterproof layers are arranged, andpart of side walls are poured; inverted supports are arranged, the third steel support is detached, and a remaining side wall structure on the second floor underground and a middle plate structure onthe first floor underground are poured; and the second steel support is detached, a side wall and top plate structure on the first layer underground is poured, a top plate waterproof layer is arranged, timely backfill is carried out, backfill is carried out to the position of the first steel support, the first steel support and the inverted supports are detached after a soil layer is compacted, backfill is carried out to the ground, and a station plate structure and other internal components are arranged.
Owner:BEIJING MUNICIPAL CONSTR

Fabricated concrete composite wallboard structure

The invention provides a fabricated concrete composite wallboard structure. The fabricated concrete composite wallboard structure comprises an outer wallboard arranged towards the outside of a building, an inner wallboard arranged towards the inside of the building, and a reinforcing rib located between the outer wallboard and the inner wallboard, wherein the outer wallboard, the reinforcing rib and the inner wallboard are tied to form a whole body via a net rack; a functional compound layer is adhered to the outer surface of the outer wallboard; a part extending out of the outer wallboard, the reinforcing rib and the inner wallboard of the net rack is combined with cast-in-place concrete to form a hidden beam; a core hole used for reducing self weight of the structure is formed in the reinforcing rib along a vertical direction; a pipeline channel arranged along an axial direction of the core hole and used for laying pipelines is arranged in the core hole; and/or the core hole is also filled with core hole filling materials used for preserving heat and insulating heat; a pipeline box corresponding to the pipeline channel is pre-buried in the inner wallboard. Through type and quantity of the core hole filling materials, different heat preservation requirements in southern and northern regions are met; type and thickness of sound absorbing layers can be adjusted to meet the sound insulation requirement of the building, so that the application range of the multifunctional fabricated concrete composite wallboard is extended.
Owner:CENT SOUTH UNIV +1

Method for preparing microbial oil by fermenting cassava starch and preparing biomouldsel from microbial oil

The invention relates to a method for preparing microbial oil by fermenting cassava starch and preparing biodiesel from the microbial oil and belongs to the field of biological energy sources. The method comprises the method for preparing the microbial oil and the method for preparing the biodiesel from the microbial oil and comprises the following steps of: fermenting dermoid Trichosporon B3 serving as an oil producing strain and cassava starch saccharified liquid serving as a carbon source in batches under a certain culturing condition to culture microbes, and drying and extracting to obtain the microbial oil; and performing transesterification reaction on the microbial oil serving as a raw material under the action of a catalyst to obtain the biodiesel, wherein the by-product is glycerine. The method has the advantages that: the cassava starch serving as the carbon source is fermented to prepare the microbial oil, so the cassava starch resource is fully used and the raw material cost for preparing the microbial oil is reduced; a process for transferring the microbial oil into the biodiesel is built; and the method is easy and convenient to operate and control, is environment-friendly, and has good industrial application prospect.
Owner:JIANGXI NORMAL UNIV

Method for manufacturing composite material of metal/ceramic layer structure

The invention discloses a method for manufacturing a composite material of a metal/ceramic layer structure. The method for manufacturing the composite material of the metal/ceramic layer structure adopts the following technologies: 1, bonding alloy preparation: the bonding alloy is Al-Zn-Fe-Ti alloy and comprises the following components in percentage by mass: 5%-40% of Zn, 0.5%-10% of Fe, 2%-20% of Ti, and the balance is Al; the bonding alloy is composed of a high melting point phase and a low melting point phase, is in solid phase under the normal temperature and is in solid-liquid phases with solid phase being 60%-80% and liquid phase being 40%-20%; and the melting point of the bonding alloy, the interface reaction phase and the phase composition can be adjusted by utilizing the contents of added composition elements of Zn, Ti and Fe; and 2, composite material preparation: heating ceramic and metal to a processing temperature simultaneously, then making the bonding alloy carry out a recombination reaction with the ceramic and the metal, making the ceramic and the metal be in composite molding together under the condition that the temperature is 80-120 DEG C higher than the melting point of the high melting point phase of the bonding alloy, and the composite material of the metal/ceramic structure can be formed by demoulding.
Owner:TIANJIN GONGDA GALVANIZING EQUIP CO LTD

Point type reservoir

The invention provides a point type reservoir which can be constructed at any raining place on the land, can automatically store rainfall and avoid evaporation, infiltration and pollution, is used as a water source in draught and water shortage, can store the rainfall during continuous raining or storm, reduce sand which is scoured from the ground and enters the reservoir and reduce probability of debris flow, landslide and flood, and can rationally distribute the rainfall and reduce disasters such as draught. The point type reservoir comprises a water storage tree and an underground water storage system, wherein the water storage tree comprises a trunk and a crown; the trunk is a closed hollow column body; the crown comprises a water collector for collecting rainwater and making the rainwater flow into the trunk; the water collector comprises blades and blade handles; the blades are curved surfaces with middle sunken parts and two high sides; the upper end of each blade handle with a through hole is connected to the edge of the sunken part of each blade; the lower end of each blade handle passes through a blade handle hole in a trunk wall and extends into an inner cavity of the trunk; and the underground water storage system comprises an anti-seepage pipeline which is arranged in the ground and is communicated with a water outlet in the lower part of the trunk.
Owner:NANJING FOREST POLICE COLLEGE

Assembly type reinforced concrete wall structure based on thermal bridge partition technology

The invention provides an assembly type reinforced concrete wall structure based on the thermal bridge partition technology. The assembly type reinforced concrete wall structure comprises an exterior wall panel, a wall panel intermediate layer, an interior wall panel and trusses. A wall is of a sandwich structure formed by the exterior wall panel, the wall panel intermediate layer and the interior wall panel from outside to inside. Chord members of the trusses are embedded in the exterior wall panel and the interior wall panel correspondingly. Web members of the trusses penetrate through the wall panel intermediate layer, and the two ends of the web members are connected with chord members of the exterior wall panel and chord members of the interior wall panel correspondingly. The web member of each truss is provided with a web member connecting part used for cutting off a thermal bridge between the exterior wall panel and the interior wall panel. The assembly type reinforced concrete wall structure based on the thermal bridge partition technology has the advantages of being capable of cutting off the thermal bridge, integral in structure and function, good in integrity and the like, overcomes the defects of an existing assembly type concrete wall panel system and has good economic and social benefits.
Owner:CENT SOUTH UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products