The invention discloses an inner-support-free double-wall locking mouth steel 
bushing box 
cofferdam construction method and an inner-support-free double-wall locking mouth steel 
bushing box 
cofferdam. Firstly, unit blocks are processed in a factory and then transported to a construction region to be spliced and formed piece by piece, the spliced unit blocks are wholly hoisted to a target 
pier position at the preset elevation through a large hoisting ship, then construction steps of 
sludge suction, tenon type locking mouth plugging, sand 
cushion layer filling, concrete bottom sealing, water suction, foundation clearing, steel protection 
barrel cutting, 
pile head removing, whole 
abutment installation and the like are performed, finally whole dismantling is performed for usage of the next 
pier position construction. The inner-support-free double-wall locking mouth steel 
bushing box 
cofferdam comprises a side plate, a blade foot and a joint and is characterized in that the cofferdam is of a detachable structure, a plane is partitioned into blocks, the blocks are connected in a mode that tenon type locking mouths are combined with bolts, and the inner side is not provided with an inner support. Therefore, the inner-support-free double-wall locking mouth steel bushing box cofferdam has the advantages of being small in construction difficulty, short in construction period, low in cost input, small in 
material consumption, high in repeated usage times, capable of being wholly recycled, safe, reliable and the like.